HomeMy WebLinkAboutA102 2ND FL ARCH1 2 3 4 5
D
E
C
B
A
MECH
211
OFFICE
212
OFFICE
202
OFFICE
201
OFFICE
203
CONFERENCE
204
OFFICE
205
RR
209
OFFICE
208
OFFICE
207
RR
210
OPEN
OFFICE
206
B3S
1
2
B3S
B3S
SHELL
SPACE
213
213
1
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:5/21/2021 8:30:37 AMA102
SECOND FLOOR
ARCHITECTURAL
PLAN
2021.00173
05/20/2021
CONSTRUCTION DOCUMENTS
ARTISTIC COMPOSITE
PALLETS -PHASE 2
4518 WEST 99TH
STREET CARMEL, IN
46032
N
3/32" = 1'-0"A102
1 SECOND FLOOR ARCHITECTURAL PLAN
KEYED FLOOR PLAN NOTES (NOTED WITH )1
1 ALIGN FINISHED FACE OF EXISTING WALL WITH FINISHED FACE OF
NEW WALL.
2 NEW FIXED LADDER SECURED TO FLOOR UP TO EXISTING TO REMAIN
ROOF ACCESS.
3 OWNER FURNISHED OWNER INSTALLED LOCKERS.
4 UTILITY SINK. REFER TO PLUMBING DRAWINGS.
5 MOP SINK. REFER TO PLUMBING DRAWINGS.
6 EXISTING TO REMAIN REFRIGERATOR.
7 OWNER FURNISHED VENDING MACHINES.
8 OWNER FURNISHED WATER DISPENSER.
9 STEEL STAIR AND RAILING. REFER TO STRUCTURAL DRAWINGS.
REVISION SCHEDULE
NO. DESCRIPTION DATE
1 ADDENDUM 1 05/20/2021
06/08/21