Loading...
HomeMy WebLinkAboutA122 2ND FL REFLECTED CEILING1 2 3 4 5 D E C B A CONFERENCE 204 OFFICE 212 OPEN OFFICE 206MECH 211 STAIR ST-2 OFFICE 205 OFFICE 203 OFFICE 202 OFFICE 201 RR 209 RR 210 OFFICE 208 OFFICE 207 2 REFLECTED CEILING PLAN LEGEND A. ALL CEILINGS TO BE ACT-1 U.N.O. B. ALL A.C.T. CEILINGS TO BE 9'-0" A.F.F. USING 15/16" WHITE METAL TEE GRID. U.N.O. 2'x4' LAY-IN FIXTURE ACT-1 8' - 0" SUPPLY DIFFUSER EXHAUST FAN GRILL 2'x4' SUSPENDED ACOUSTICAL CEILING CEILING IDENTIFICATION CEILING TYPE FINISH HEIGHT (AFF) CEILING TYPE LEGEND ACT-1 -- 2x4 ACOUSTICAL PANELS ('CIRRUS' BY ARMSTRONG) 1'x4' SUSPENDED FIXTURE Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE:5/21/2021 8:30:38 AMA122 SECOND FLOOR REFLECTED CEILING PLAN 2021.00173 05/20/2021 CONSTRUCTION DOCUMENTS ARTISTIC COMPOSITE PALLETS -PHASE 2 4518 WEST 99TH STREET CARMEL, IN 46032 N 3/32" = 1'-0"A122 1 SECOND FLOOR REFLECTED CEILING PLAN 1 NO CEILING. OPEN TO STRUCTURE ABOVE. PAINT TO MATCH EXSITING. 2 NO CEILING. OPEN TO STRUCTURE ABOVE. 3 PAINT EXPOSED DUCTWORK P-2. KEYED REF. CEILING PLAN NOTES (NOTED WITH )1 REVISION SCHEDULE NO. DESCRIPTION DATE 06/08/21