HomeMy WebLinkAboutCover Page (2)CHECKED DATE
DRAWN CODE
APPPDE CHK DES NO DATE REVISIONS AND RECORD OF ISSUE
DRAWING NUMBERPROJECT REV
AREADRN ANSI D 34x22020/OCT/20 ISSUED FOR PERMITTING
118/FEB/21 ISSUED FOR PERMITTING
02/14/2017 04:16 PM
20/OCT/20
DESIGNER
1R
J.P. MORGAN CHASE
10495 N MICHIGAN RD, CARMEL, IN 46032-7939
COVER PAGE
512459: 26.63 kWp
J.P. MORGAN CHASE
10495 N Michigan Rd
CARMEL, IN 46032-7939
ASSESSOR'S #: 29-13-07-019-002.000-018
AUTHORITIES HAVING JURISDICTION
BUILDING: CITY OF CARMEL
ZONING: CITY OF CARMEL
UTILITY: INDIANAPOLIS POWER & LIGHT (IPL)
DESIGN SPECIFICATIONS
OCCUPANCY: B
CONSTRUCTION: COMMERCIAL / INDUSTRIAL
GROUND SNOW LOAD: 20 PSF
WIND SPEED: 106 MPH
DESIGN SPECIFICATIONS
RISK CATEGORY: II
SITE CLASS: D (DEFAULT)
SEISMIC IMPORTANCE FACTOR: 1.0
SEISMIC DESIGN CATEGORY: B
SS: 0.173
S1: 0.082
SDS: 0.184
SD1: 0.131
ANALYSIS PROCEDURE: NONSTRUCTURAL COMPONENTS
DESIGN CODES & STANDARDS
BUILDING: 2018 INTERNATIONAL BUILDING CODE (SEE NOTE 1)
ELECTRICAL: 2008 NEC
FIRE: 2018 INTERNATIONAL FIRE CODE (SEE NOTE 2)
PROJECT INFORMATION
IN-512459-G10
KKT KKT TDG
TDG
SBJ SBJ
DRAWING INDEX
DRAWING NUMBER SHEET TITLE
G10 COVER PAGE
G20 SITE PLAN
E10 ELECTRICAL ROOF PLAN
E20 THREE LINE DIAGRAM & BILL OF MATERIALS
E21 ONE LINE DIAGRAM
E30 PLACARDS
REQUIRED STANDARD DRAWING INDEX
DRAWING NUMBER SHEET TITLE
SG10 COVER PAGE
SG20 GENERAL NOTES
SG21 GENERAL NOTES
SS20 PITCHED ROOF CONNECTION DETAILS
SS21 PITCHED ROOF CONNECTION DETAILS
SE10 ELECTRICAL DETAILS
SE11 ELECTRICAL DETAILS NEC 2008
SE20 METERING AND SURGE PROTECTION DETAILS 3-PHASE
SE21 AC PANEL DETAILS
SR10 THREE PHASE SYSTEM CUTSHEETS
SR25 ELECTRICAL DATA CUTSHEETS
SR26 ELECTRICAL DATA CUTSHEETS
SR30 STRUCTURAL COMPONENT CUTSHEETS
01 AERIAL PHOTO
NOT TO SCALE 02 VICINITY MAP
NOT TO SCALE
INDIANA
CLB CAMERON L. BRYANT
10505919CLB20/OCT/20
NOTE 1 : INTERNATIONAL BUILDING CODE 2018 REFERENCES THE MOST CURRENT DESIGN
PRACTICES RELATED TO STRUCTURAL ANALYSIS AND DESIGN OF ROOFTOP SOLAR
MODULE SYSTEMS. ANALYSIS AND DESIGN OF ROOFTOP SOLAR MODULE SYSTEMS WAS
PERFORMED IN ACCORDANCE WITH INTERNATIONAL BUILDING CODE 2018 AND MEETS
2014 INDIANA BUILDING CODE REQUIREMENTS.
NOTE 2 : INTERNATIONAL FIRE CODE 2018 REFERENCES THE MOST CURRENT DESIGN
PRACTICES RELATED TO DESIGN OF ROOFTOP SOLAR MODULE SYSTEMS. ANALYSIS AND
DESIGN OF ROOFTOP SOLAR MODULE SYSTEMS WAS PERFORMED IN ACCORDANCE WITH
INTERNATIONAL FIRE CODE 2018 AND MEETS 2014 INDIANA FIRE CODE REQUIREMENTS.
KKT TDGSBJ CLB CLB
SS30 TRANSFORMER FOUNDATION
18-Feb-2021
06/08/21