Loading...
HomeMy WebLinkAboutA010.03_A3.02VERIFICATION NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES AND ALL EXISTING FIELD CONDITIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT THE ARCHITECT BEFORE PROCEEDING WITH WORK. ELEVATION GENERAL NOTES 1. REFER TO THE ELECTRICAL AND TECHNOLOGY DRAWINGS FOR CAMERA, LOCATIONS, SECURITY DEVICES, RECEPTACLES, LIGHT FIXTURES, ETC. COORDINATE LOCATIONS WITH VENEER COURSING TO PROVIDE CONSISTENT MOUNTING HEIGHTS. 2. REFER TO PLUMBING DRAWINGS FOR EXTERIOR WALL HYDRANTS, SECONDARY ROOF DRAIN OUTLETS, ETC. COORDINATE PENETRATIONS THROUGH EXTERIOR ENVELOPE WITH OTHER TRADES. PROVIDE TRANSITION MEMBRANE TO MAINTAIN AIR BARRIER SYSTEM. 3. REFER TO MECHANICAL DRAWINGS FOR EXTERIOR LOUVER LOCATIONS LOCATED IN EXTERIOR WALL AND EXTERIOR SOFFITS. COORDINATE PENETRATIONS THROUGH EXTERIOR ENVELOPE WITH OTHER TRADES. PROVIDE TRANSITION MEMBRANE TO MAINTAIN AIR BARRIER SYSTEM. LVL A2 EL 113'-4" FIRST FLOOR EL 100'-0" SECOND FLOOR (BAND) EL 113'-4" 3 A5.06 detail end of wall EXISTING MASONRY WALL TO REMAIN ORCHESTRA INSTRUMENT STORAGE P126 OFFICE P127 LVL A2 EL 113'-4" FIRST FLOOR EL 100'-0" 1 A4.01 SECOND FLOOR (BAND) EL 113'-4" LOWER LEVEL NEW ADDITION EL 98'-8" 2 A5.05 METAL COPING CAST STONE WALL PANELS BRICK -TO MATCH EXISTING DOUBLE ROWLOCK COURSE -BRICK TO MATCH EXISTING AT BASE OF MASONRY WALL ALUMINUM STOREFRONT FRAMING BRICK -TO MATCH EXISTING EXISTING MASONRY WALL TO REMAIN LVL A2 EL 113'-4" SECOND FLOOR (BAND) EL 113'-4" LOWER LEVEL NEW ADDITION EL 98'-8" ALUMINUM STOREFRONT FRAMING 10' M A X . F ROM CORNERS TYPICAL BRICK EXPANSION JOINTS EXPANSION JOINTS AT ALL INTERIOR CORNERS AND OFFSETS EXPANSION JOINT AT ALL CHANGES IN WALL HEIGHT TYPICAL BRICK EXPANSION JOINT (EJ) LOCATIONS24' M A X . SPACING ONWAL L W /NO OPE N IN GSTYPICAL BRICK EXPANSION JOINT DETAIL BRICK VENEER VENEER WALL TIES AT 16" O.C. EACH WAY PROVIDE BACKER ROD IN CAVITY AT CONTROL JOINT LOCATIONS TO COMPARTMENTALIZE THE CAVITY AIR SPACE AND REDUCE HORIZONTAL AIR FLOW BACKER ROD AND SEALANT COMPRESSIBLE FILL REFER TO SECTIONS AND DETAILS FOR BACKUP WALL CONSTRUCTION TYPICAL BRICK EXPANSION JOINT AT OPENINGS BRICK VENEER COMPRESSIBLE FILL REFER TO SECTIONS AND DETAILS FOR BACKUP WALL CONSTRUCTION EXPANSION JOINT AT OPENINGS ONLY WHEN THERE IS 8' OR LESS OF BRICK ABOVE PROVIDE BACKER ROD AND SEALANT AT FRONT AND EXPOSED END OF LINTEL CAVITY WALL FLASHING AND ACCESSORIES, REFER TO TYPICAL DETAIL NOTE: DETAIL SHOWN STEPPED BACK FOR CLARITY BACKER ROD AND SEALANT COMPRESSIBLE FILL PLACE THE EXPANSION JOINT BETWEEN THE WINDOWS IF THE WINDOWS ARE AT LEAST 4' APART20' M A X . SPACING ONWAL L W IT H OPEN IN GSLOCATE EXPANSION JOINT AT OPENING ONLY WHEN THERE IS 8' OR LESS OF BRICK ABOVE, OTHERWISE LOCATE 2' MIN FROM OPENING PROVIDE FOAM BACKER ROD IN CAVITY AT CONTROL JOINT LOCATIONS E1 E2 P1 P2D COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN WWW.FHAI.COM ARCHITECT 1/11/2021 2:32:42 PM\\data1\citrixprofiles$\kshultz\My Documents\2019_ARCH_220114.00_kshultz.rvtPROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 BUILDING ELEVATIONS A3.02 PROJECT ISSUE DATE: 01/13/2021 TAC SUBMITTAL DRAWN BY: TPV 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 NORTHSCALE: 1/8" = 1'-0" NORTH ELEVATION P2 SCALE: 1/8" = 1'-0" WEST ELEVATION P2 SCALE: 1/8" = 1'-0" NORTH ELEVATION (EAST) P2 1 TYPICAL BRICK EXPANSION JOINTS W IL L IAM E.PAY N EREGISTERE D IND I A N AA R CH I T E C T4169 STATE OF No. A CARMEL TAC REVIEW 01/13/2021 3/32" 3/32" 3/32" REV. NO. DESCRIPTION DATE 06/08/21