HomeMy WebLinkAboutC010.04_G1.0.OVSPPARKING LOT ADDITION
(NOT IN SCOPE OF THIS PROJECT)
PERFORMING ARTS BUILDING ADDITION
SMOKEY ROW ROAD / E 136TH STREET
E MAIN STREET
2
6
6
6
5
6
28 31
PAVING AT MURRAY FIELD
(NOT IN SCOPE OF THIS PROJECT)
12
5
5
15
3
STORAGE ADDITION
(NOT IN SCOPE OF THIS PROJECT)
FUTURE NATATORIUM BUILDING ADDITION
(NOT IN SCOPE OF THIS PROJECT)
SEE SHEET G1.3SEE SHEET G1.4 MATCH LINE15
12
14
13
10
10
9
8
7
6
5
4
3
2
1
200 6000 200 400
G1.0
OVERALL SITE PLAN
1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.
2. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WERE
PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC.
3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT
AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH
PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO
THE ENGINEER.
GENERAL NOTES
KEYNOTES
PROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKS
PROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS
1
1
THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OF
BICYCLE RACKS PROPOSED IN A PARTICULAR AREA.
1
THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATED
PARKING LOT IDENTIFICATION.
PARKING LOT IDENTIFICATION NUMBER
BICYCLE RACK LOCATION SUMMARY TABLE
LOCATION BICYCLE RACKS
MAIN BUILDING 90
FOOTBALL STADIUM 28
12
3
4
137
TENNIS COURTS
MURRAY STADIUM
CLLC
TOTAL BICYCLE RACKS
274TOTAL BICYCLE PARKING SPACES
THE ABOVE BICYCLE RACKS ACCOMMODATE 5,480 STUDENTS
BICYCLE SPACES REQUIRED = 1 PER 20 STUDENTS
CONSULTANT
PROJECT NUMBER: 220114.00
CARMEL CLAY SCHOOLS
PROJECT ISSUE DATE: 12.15.2020
DRAWN BY: HHW
REV.
NO. DESCRIPTION DATE
TAC SUBMITTAL
WWW.FHAI.COM
ARCHITECT
317-848-0966
350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204
COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC.
CARMEL HIGH
SCHOOL
PERFORMING
ARTS ADDITION
AND
RENOVATIONS
520 E MAIN STREET
CARMEL, IN 46032
CARMEL TAC REVIEW 01/13/2021A
19700317
No.
BUILDING AREA SUMMARY
YEAR
(2002 THROUGH 2021)
PROJECT EXIST. AREA SF. NEW AREA SF. TOTAL AREA SF. % ADDED REMARKS
2002 FRESHMAN CENTER
2004 LOCKER ROOM
2012 PHYSICAL EDUCATION
2019 POOL ENTRANCE #21
2021 DOCK STORAGE
2021 PERFORMING ARTS
776647
950591
953243
980852
981547
982955
173944
2652
27609
695
1408
25464
950591
953243
980852
981547
982955
1008419
22.40
0.28
2.90
0.07
0.14
2.59
BZA APPROVAL WITH VARIANCES
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
2007 TENNIS BUILDING 1700 SEPARATE BUILDING AT STADIUM SITE
2011 SECURE ENTRANCE 0 NO NEW CONSTRUCTION
OVERALL PARKING SUMMARY
LOT NO. LOT NAME STANDARD SPACE
OLD SENIOR LOT 65 1
EXIST. PROPOSED
65
ADA SPACE
0
EXIST.
0
POLICE SPACE
0
EXIST.
0
BUS SPACE
0
EXIST.
0
TOTAL SPACES
65
EXIST. PROPOSED
65
2
3
4
5
6
7
8
9
10
12
13
14
15
DOOR 7 19 19 4 4 0 0 0 0 23 23
FRONT LOT 109 104 3 7 3 3 0 0 115 114
AUDITORIUM LOT 52 0 4 0 0 0 0 0 56 0
WEST LOT 69 69 0 0 0 0 0 0 69 69
FRESHMAN CENTER LOT 142 142 6 6 1 1 0 0 149 149
FIELDHOUSE LOT 29 29
FITNESS CENTER LOT 20 2 22
POOL LOT 109 0 8 0 1 0 0 0 118
TRAIL LOT 152 231 0 0 0 1 0 4 152 232
SUBTOTAL 766 659 27 17 5 5 0 0 798 681
FOOTBALL HOME LOT 948 948 11 11 0 0 0 0 959 959
FOOTBALL SOUTH LOT 143 143 0 0 0 0 21 = 42 21 = 42 185 185
FOOTBALL VISITOR LOT 516 516 9 9 0 0 0 0 525 525
FOOTBALL NORTH LOT 79 79 0 0 0 0 0 0 79 79
29 0 0 0 0 0 0 29
0 0 0 0 0 0 0
0
PROPOSED PROPOSED PROPOSED
24292546 TOTAL
CITY OF CARMEL REQUIRED PARKING SPACES (235 CLASSROOMS x 10) + (538 EMPLOYEES) = 2888
(UPON COMPLETION OF THE NATATORIUM PROJECT)
SUBTOTAL 1686 1686 20 20 0 0 1748 174821 = 42 21 = 42
AVAILABLE PARKING SPACES UNTIL JUNE 2022 (LOTS 8 & 9) = 2569
PERMIT PARKING SPACES = 1690 (STUDENTS) + 538 (EMPLOYEES) = 2228
NOTES:
1. THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE APPROXIMATELY 2228 PERMITS ISSUED.
2. BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT 2
STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES.
3. THE NATATORIUM PROJECT IS SCHEDULED FOR CONSTRUCTION IN JUNE OF 2022. LOTS 8 & 9 WITH 140 SPACES WILL BE AVAILABLE UNTIL THEN.
PROJECT PARKING SUMMARY
LOT NO.
(PERFORMING ARTS AND TRAIL LOT NORTH ADDITION)
LOT NAME STANDARD SPACE
FRONT LOT 109 3
EXIST. PROPOSED
104
ADA SPACE
3
EXIST.
7
POLICE SPACE
3
EXIST.
3
BUS SPACE
0
EXIST.
0
TOTAL SPACES
115
EXIST.
114
AUDITORIUM LOT 52 4 0 4 0 0 0 0 0 56 0
TRAIL LOT N. ADDITION 0 10 155 0 0 0 0 0 0 0 155
PROJECT TOTAL 161 259 7 7 3 3 0 0 171 269
NET GAIN = 98 SPACES
PROPOSED PROPOSED PROPOSED PROPOSED
06/08/21