Loading...
HomeMy WebLinkAboutC010.04_G1.0.OVSPPARKING LOT ADDITION (NOT IN SCOPE OF THIS PROJECT) PERFORMING ARTS BUILDING ADDITION SMOKEY ROW ROAD / E 136TH STREET E MAIN STREET 2 6 6 6 5 6 28 31 PAVING AT MURRAY FIELD (NOT IN SCOPE OF THIS PROJECT) 12 5 5 15 3 STORAGE ADDITION (NOT IN SCOPE OF THIS PROJECT) FUTURE NATATORIUM BUILDING ADDITION (NOT IN SCOPE OF THIS PROJECT) SEE SHEET G1.3SEE SHEET G1.4 MATCH LINE15 12 14 13 10 10 9 8 7 6 5 4 3 2 1 200 6000 200 400 G1.0 OVERALL SITE PLAN 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. GENERAL NOTES KEYNOTES PROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKS PROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS 1 1 THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OF BICYCLE RACKS PROPOSED IN A PARTICULAR AREA. 1 THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATED PARKING LOT IDENTIFICATION. PARKING LOT IDENTIFICATION NUMBER BICYCLE RACK LOCATION SUMMARY TABLE LOCATION BICYCLE RACKS MAIN BUILDING 90 FOOTBALL STADIUM 28 12 3 4 137 TENNIS COURTS MURRAY STADIUM CLLC TOTAL BICYCLE RACKS 274TOTAL BICYCLE PARKING SPACES THE ABOVE BICYCLE RACKS ACCOMMODATE 5,480 STUDENTS BICYCLE SPACES REQUIRED = 1 PER 20 STUDENTS CONSULTANT PROJECT NUMBER: 220114.00 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 12.15.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC SUBMITTAL WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS 520 E MAIN STREET CARMEL, IN 46032 CARMEL TAC REVIEW 01/13/2021A 19700317 No. BUILDING AREA SUMMARY YEAR (2002 THROUGH 2021) PROJECT EXIST. AREA SF. NEW AREA SF. TOTAL AREA SF. % ADDED REMARKS 2002 FRESHMAN CENTER 2004 LOCKER ROOM 2012 PHYSICAL EDUCATION 2019 POOL ENTRANCE #21 2021 DOCK STORAGE 2021 PERFORMING ARTS 776647 950591 953243 980852 981547 982955 173944 2652 27609 695 1408 25464 950591 953243 980852 981547 982955 1008419 22.40 0.28 2.90 0.07 0.14 2.59 BZA APPROVAL WITH VARIANCES NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION 2007 TENNIS BUILDING 1700 SEPARATE BUILDING AT STADIUM SITE 2011 SECURE ENTRANCE 0 NO NEW CONSTRUCTION OVERALL PARKING SUMMARY LOT NO. LOT NAME STANDARD SPACE OLD SENIOR LOT 65 1 EXIST. PROPOSED 65 ADA SPACE 0 EXIST. 0 POLICE SPACE 0 EXIST. 0 BUS SPACE 0 EXIST. 0 TOTAL SPACES 65 EXIST. PROPOSED 65 2 3 4 5 6 7 8 9 10 12 13 14 15 DOOR 7 19 19 4 4 0 0 0 0 23 23 FRONT LOT 109 104 3 7 3 3 0 0 115 114 AUDITORIUM LOT 52 0 4 0 0 0 0 0 56 0 WEST LOT 69 69 0 0 0 0 0 0 69 69 FRESHMAN CENTER LOT 142 142 6 6 1 1 0 0 149 149 FIELDHOUSE LOT 29 29 FITNESS CENTER LOT 20 2 22 POOL LOT 109 0 8 0 1 0 0 0 118 TRAIL LOT 152 231 0 0 0 1 0 4 152 232 SUBTOTAL 766 659 27 17 5 5 0 0 798 681 FOOTBALL HOME LOT 948 948 11 11 0 0 0 0 959 959 FOOTBALL SOUTH LOT 143 143 0 0 0 0 21 = 42 21 = 42 185 185 FOOTBALL VISITOR LOT 516 516 9 9 0 0 0 0 525 525 FOOTBALL NORTH LOT 79 79 0 0 0 0 0 0 79 79 29 0 0 0 0 0 0 29 0 0 0 0 0 0 0 0 PROPOSED PROPOSED PROPOSED 24292546 TOTAL CITY OF CARMEL REQUIRED PARKING SPACES (235 CLASSROOMS x 10) + (538 EMPLOYEES) = 2888 (UPON COMPLETION OF THE NATATORIUM PROJECT) SUBTOTAL 1686 1686 20 20 0 0 1748 174821 = 42 21 = 42 AVAILABLE PARKING SPACES UNTIL JUNE 2022 (LOTS 8 & 9) = 2569 PERMIT PARKING SPACES = 1690 (STUDENTS) + 538 (EMPLOYEES) = 2228 NOTES: 1. THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE APPROXIMATELY 2228 PERMITS ISSUED. 2. BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT 2 STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES. 3. THE NATATORIUM PROJECT IS SCHEDULED FOR CONSTRUCTION IN JUNE OF 2022. LOTS 8 & 9 WITH 140 SPACES WILL BE AVAILABLE UNTIL THEN. PROJECT PARKING SUMMARY LOT NO. (PERFORMING ARTS AND TRAIL LOT NORTH ADDITION) LOT NAME STANDARD SPACE FRONT LOT 109 3 EXIST. PROPOSED 104 ADA SPACE 3 EXIST. 7 POLICE SPACE 3 EXIST. 3 BUS SPACE 0 EXIST. 0 TOTAL SPACES 115 EXIST. 114 AUDITORIUM LOT 52 4 0 4 0 0 0 0 0 56 0 TRAIL LOT N. ADDITION 0 10 155 0 0 0 0 0 0 0 155 PROJECT TOTAL 161 259 7 7 3 3 0 0 171 269 NET GAIN = 98 SPACES PROPOSED PROPOSED PROPOSED PROPOSED 06/08/21