Loading...
HomeMy WebLinkAboutC010.05_G1.3.SPE MAIN STREET LOT 1 LOT 48 PROPOSED BUILDING ADDITION 18,240 SFT. FINISH FLOOR ELEV. = 851.55 (EAST) FINISH FLOOR ELEV. = 852.89 (WEST) FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKING1 11 4 4 4 5 5 5 5 6 6 4 8 8 7 7 7 20.0'5.7' 20.0'5.6' R 1 0 . 0 ' R30.0 'R30.0'R50.0'20.0'5.7'24.0' 7 3 4 7 74 1 1 7 5 2 5.9' 7 4 9 10.0'10.0'43.9' 53.3'30.8'30.6'SETBACK LINE 35.0'BUFFER YARD 30.0' SETBACK LINE 5.0' 24.0' 7 7 6 4 SEE ENLARGEMENT 1 ON SHEET G3.3 SEE ENLARGEMENT 2 ON SHEET G3.3 SEE ENLARGEMENT 3 ON SHEET G3.3 3 3 7 7 7 7 7 6 1 2 CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) R10.0' 20 600 20 40 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO SITE DETAILS ON SHEETS G5.1 AND G5.2 GENERAL NOTES CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS RESPONSE TAC COMMENTS 04/19/2021B RESPONSE TAC COMMENTS 05/17/2021C SITE KEYNOTES ASPHALT PAVEMENT (1.5" SURFACE ON 3" BASE ON 8" STONE) 6" CONCRETE PAVEMENT, SEE SHEET G1.5 FOR JOINTING PLAN CROSSWALK 4" CONCRETE SIDEWALK, SEE SHEET G1.5 FOR JOINTING PLAN 6" CONCRETE CURB (STRAIGHT) CONCRETE CURB AND GUTTER ADA RAMP, SEE SHEETS G3.3 AND G5.2 FOR MORE INFORMATION SOD DISTURBED AREAS (PROVIDE 6" OF TOPSOIL) NEW TRASH DUMPSTER ENCLOSURE (SEE ARCHITECTURAL PLANS) 1 2 3 4 5 6 7 8 9 PROPOSED SITE LEGEND EXISTING BUILDING BUILDING ADDITION CONCRETE PAVEMENT / WALK ASPHALT PAVEMENT LANDSCAPE AREA G1.3 SITE PLANMATCH LINE (SEE SHEET G1.4)PROJECT PARKING SUMMARY LOT NO. (PERFORMING ARTS AND TRAIL LOT NORTH ADDITION) LOT NAME STANDARD SPACE FRONT LOT 109 3 EXIST. PROPOSED 103 ADA SPACE 3 EXIST. 7 POLICE SPACE 3 EXIST. 3 BUS SPACE 0 EXIST. 0 TOTAL SPACES 115 EXIST. 113 AUDITORIUM LOT 52 4 0 4 0 0 0 0 0 56 0 TRAIL LOT N. ADDITION 0 10 155 0 0 0 0 0 0 0 155 PROJECT TOTAL 161 258 7 7 3 3 0 0 171 268 NET GAIN = 97 SPACES PROPOSED PROPOSED PROPOSED PROPOSED 06/08/21