HomeMy WebLinkAboutC010.05_G1.3.SPE MAIN STREET
LOT 1
LOT 48
PROPOSED BUILDING ADDITION
18,240 SFT.
FINISH FLOOR ELEV. = 851.55 (EAST)
FINISH FLOOR ELEV. = 852.89 (WEST)
FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKING1
11
4
4
4
5
5
5
5
6
6
4
8 8
7
7
7 20.0'5.7' 20.0'5.6'
R
1
0
.
0
'
R30.0 'R30.0'R50.0'20.0'5.7'24.0'
7
3
4
7
74
1
1
7
5
2
5.9'
7
4
9
10.0'10.0'43.9'
53.3'30.8'30.6'SETBACK LINE
35.0'BUFFER YARD
30.0'
SETBACK LINE
5.0'
24.0'
7
7
6
4
SEE ENLARGEMENT 1
ON SHEET G3.3
SEE ENLARGEMENT 2
ON SHEET G3.3
SEE ENLARGEMENT 3
ON SHEET G3.3
3
3
7
7
7
7
7
6
1
2
CONSTRUCTION LIMITS (TYP.)
CONSTRUCTION LIMITS (TYP.)
CONSTRUCTION LIMITS (TYP.)
R10.0'
20 600 20 40
INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY
ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR
WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR
EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES
SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND
WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE
OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY
ALL CONSTRUCTION.
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,
SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND
CAUTION !!
Know what'sbelow.
before you dig.Call
R
Call 811 or 1-800-382-5544 Before You Begin Any Digging Project.
Call 48 hours or 2 working days before you dig.
It's Fast, It's Easy and It's the Law in the state of Indiana!
1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL
LEGEND.
2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN
WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO
GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN
COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN
SERVICE OR ABANDONED.
3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE
PROJECT AREA INCLUDING UNDERGROUND UTILITY
CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE
CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE
ENGINEER.
4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN
APPROVED STORM WATER MANAGEMENT PERMIT.
5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE
THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE
RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT
IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE
DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY.
EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN
ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.
6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL
RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT
THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS
ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY
PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE
EXISTING CONDITION OF THE RIGHT-OF-WAY.
7. REFER TO SITE DETAILS ON SHEETS G5.1 AND G5.2
GENERAL NOTES
CARMEL TAC REVIEW 01/13/2021A
19700317
No.
COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.
WWW.FHAI.COM
ARCHITECT
PROJECT NUMBER: 220114.00
CARMEL HIGH
SCHOOL
PERFORMING
ARTS ADDITION
AND
RENOVATIONS
CARMEL CLAY SCHOOLS
520 E MAIN STREET
CARMEL, IN 46032
PROJECT ISSUE DATE: 03/08/2021
DRAWN BY: HHW
317-848-0966
350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204
REV.
NO. DESCRIPTION DATE
CONSULTANT
CONSTRUCTION DOCUMENTS
RESPONSE TAC COMMENTS 04/19/2021B
RESPONSE TAC COMMENTS 05/17/2021C
SITE KEYNOTES
ASPHALT PAVEMENT (1.5" SURFACE ON 3" BASE ON 8" STONE)
6" CONCRETE PAVEMENT, SEE SHEET G1.5 FOR JOINTING PLAN
CROSSWALK
4" CONCRETE SIDEWALK, SEE SHEET G1.5 FOR JOINTING PLAN
6" CONCRETE CURB (STRAIGHT)
CONCRETE CURB AND GUTTER
ADA RAMP, SEE SHEETS G3.3 AND G5.2 FOR MORE INFORMATION
SOD DISTURBED AREAS (PROVIDE 6" OF TOPSOIL)
NEW TRASH DUMPSTER ENCLOSURE (SEE ARCHITECTURAL PLANS)
1
2
3
4
5
6
7
8
9
PROPOSED SITE LEGEND
EXISTING BUILDING
BUILDING ADDITION
CONCRETE PAVEMENT / WALK
ASPHALT PAVEMENT
LANDSCAPE AREA
G1.3
SITE PLANMATCH LINE (SEE SHEET G1.4)PROJECT PARKING SUMMARY
LOT NO.
(PERFORMING ARTS AND TRAIL LOT NORTH ADDITION)
LOT NAME STANDARD SPACE
FRONT LOT 109 3
EXIST. PROPOSED
103
ADA SPACE
3
EXIST.
7
POLICE SPACE
3
EXIST.
3
BUS SPACE
0
EXIST.
0
TOTAL SPACES
115
EXIST.
113
AUDITORIUM LOT 52 4 0 4 0 0 0 0 0 56 0
TRAIL LOT N. ADDITION 0 10 155 0 0 0 0 0 0 0 155
PROJECT TOTAL 161 258 7 7 3 3 0 0 171 268
NET GAIN = 97 SPACES
PROPOSED PROPOSED PROPOSED PROPOSED
06/08/21