Loading...
HomeMy WebLinkAboutC010.03_GD1.4.DPE MAIN STREETVVVVVVVVVVVVVR4R4R1PR3R2R2R2PPLOT NO. 3LOT NO. 21112224CONSTRUCTION LIMITS (TYP.)55CONSTRUCTION LIMITS (TYP.)CONSTRUCTION LIMITS (TYP.)309003060INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! CARMEL TAC REVIEW01/13/2021A19700317No.COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 220114.00CARMEL HIGHSCHOOLPERFORMINGARTS ADDITIONANDRENOVATIONSCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 03/08/2021DRAWN BY: HHW317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTCONSTRUCTION DOCUMENTSGD1.4SITE DEMOLITION PLANMATCH LINE (SEE SHEET GD1.3) DEMOLITION KEYNOTES (SHEET GD1.4)1.STRIP GRASS AND VEGETATION, REMOVE TOPSOIL AND SOIL TOPROPOSED SUBGRADE ELEVATION IN AREA OF PROPOSEDCONCRETE SIDEWALK.2.REMOVE EXISTING PAVEMENT MARKING3.REPLACE EXISTING SIGN WITH RELOCATED SIGN4.REMOVE EXISTING PAVEMENT MARKING (ADA PARKING SYMBOL)5.SEE SHEET GD1.3 FOR ADDITIONAL DEMOLITION INFORMATION INTHIS AREA.1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WEREPROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKESNO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALLSUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECTAREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTHPRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TOTHE ENGINEER.4.REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSEDBUILDING FOOTPRINT.5.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVEDSTORM WATER MANAGEMENT PERMIT.6.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THERESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIREDFOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSEDDEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVEWITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TOWITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.7.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TOTHE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THECONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THECITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTINGCONDITION OF THE RIGHT-OF-WAY.8.DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMSINDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TOREMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION.GENERAL NOTESLEGENDADA PARKING SPACEVISITOR PARKING SPACERESERVED PARKING SPACE - PRINCIPALRESERVED PARKING SPACE - ASSISTANT PRINCIPALPOLICE (24 HOUR) PARKING SPACERESERVED PARKING SPACE - ATHLETIC DIRECTORRESERVED PARKING SPACE (GENERAL)VPR1R2R3R4