Loading...
HomeMy WebLinkAboutC010.04_G1.0.OVSPPARKING LOT ADDITION(NOT IN SCOPE OF THIS PROJECT)PERFORMING ARTS BUILDING ADDITIONSMOKEY ROW ROAD / E 136TH STREETE MAIN STREET2666562831PAVING AT MURRAY FIELD(NOT IN SCOPE OF THIS PROJECT)1255153STORAGE ADDITION (NOT IN SCOPE OF THIS PROJECT)FUTURE NATATORIUM BUILDING ADDITION(NOT IN SCOPE OF THIS PROJECT)SEE SHEET G1.3SEE SHEET G1.4MATCH LINE 1512141310109876543212006000200400G1.0OVERALL SITE PLAN1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WEREPROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECTAREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTHPRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TOTHE ENGINEER.GENERAL NOTESKEYNOTESPROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKSPROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS11THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OFBICYCLE RACKS PROPOSED IN A PARTICULAR AREA.1THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATEDPARKING LOT IDENTIFICATION.PARKING LOT IDENTIFICATION NUMBERBICYCLE RACK LOCATION SUMMARY TABLELOCATIONBICYCLE RACKSMAIN BUILDING90FOOTBALL STADIUM281234137TENNIS COURTSMURRAY STADIUMCLLCTOTAL BICYCLE RACKS274TOTAL BICYCLE PARKING SPACESTHE ABOVE BICYCLE RACKS ACCOMMODATE 5,480 STUDENTSBICYCLE SPACES REQUIRED = 1 PER 20 STUDENTSCONSULTANTPROJECT NUMBER: 220114.00CARMEL CLAY SCHOOLSPROJECT ISSUE DATE: 12.15.2020DRAWN BY: HHWREV.NO.DESCRIPTIONDATETAC SUBMITTALWWW.FHAI.COMARCHITECT317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC.CARMEL HIGHSCHOOLPERFORMINGARTS ADDITIONANDRENOVATIONS520 E MAIN STREETCARMEL, IN 46032CARMEL TAC REVIEW01/13/2021A19700317No.BUILDING AREA SUMMARYYEAR(2002 THROUGH 2021)PROJECTEXIST. AREA SF.NEW AREA SF.TOTAL AREA SF.%ADDEDREMARKS2002FRESHMAN CENTER2004LOCKER ROOM2012PHYSICAL EDUCATION2019POOL ENTRANCE #212021DOCK STORAGE2021PERFORMING ARTS776647950591953243980852981547982955173944265227609695140825464950591953243980852981547982955100841922.400.282.900.070.142.59BZA APPROVAL WITH VARIANCESNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITION2007TENNIS BUILDING1700SEPARATE BUILDING AT STADIUM SITE2011SECURE ENTRANCE0NO NEW CONSTRUCTIONOVERALL PARKING SUMMARYLOT NO.LOT NAMESTANDARD SPACEOLD SENIOR LOT651EXIST.PROPOSED65ADA SPACE0EXIST.0POLICE SPACE0EXIST.0BUS SPACE0EXIST.0TOTAL SPACES65EXIST.PROPOSED65234567891012131415DOOR 719194400002323FRONT LOT109104373300115114AUDITORIUM LOT520400000560WEST LOT69690000006969FRESHMAN CENTER LOT142142661100149149FIELDHOUSE LOT2929FITNESS CENTER LOT20222POOL LOT1090801000118TRAIL LOT152231000104152232SUBTOTAL76665927175500798681FOOTBALL HOME LOT94894811110000959959FOOTBALL SOUTH LOT143143000021 = 4221 = 42185185FOOTBALL VISITOR LOT516516990000525525FOOTBALL NORTH LOT79790000007979290000002900000000PROPOSEDPROPOSEDPROPOSED24292546TOTALCITY OF CARMEL REQUIRED PARKING SPACES (235 CLASSROOMS x 10) + (538 EMPLOYEES) = 2888(UPON COMPLETION OF THE NATATORIUM PROJECT)SUBTOTAL168616862020001748174821 = 4221 = 42AVAILABLE PARKING SPACES UNTIL JUNE 2022 (LOTS 8 & 9) = 2569PERMIT PARKING SPACES = 1690 (STUDENTS) + 538 (EMPLOYEES) = 2228NOTES:1.THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE APPROXIMATELY 2228 PERMITS ISSUED.2.BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT 2STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES.3.THE NATATORIUM PROJECT IS SCHEDULED FOR CONSTRUCTION IN JUNE OF 2022. LOTS 8 & 9 WITH 140 SPACES WILL BE AVAILABLE UNTIL THEN.PROJECT PARKING SUMMARYLOT NO.(PERFORMING ARTS AND TRAIL LOT NORTH ADDITION)LOT NAMESTANDARD SPACEFRONT LOT1093EXIST.PROPOSED104ADA SPACE3EXIST.7POLICE SPACE3EXIST.3BUS SPACE0EXIST.0TOTAL SPACES115EXIST.114AUDITORIUM LOT5240400000560TRAIL LOT N. ADDITION0101550000000155PROJECT TOTAL161259773300171269NET GAIN = 98 SPACESPROPOSEDPROPOSEDPROPOSEDPROPOSED