HomeMy WebLinkAboutC010.05_G1.3.SPE MAIN STREETLOT 1LOT 48PROPOSED BUILDING ADDITION18,240 SFT.FINISH FLOOR ELEV. = 851.55 (EAST)FINISH FLOOR ELEV. = 852.89 (WEST)FIRE LANE NO PARKINGFIRE LANE NO PARKINGFIRE LANE NO PAR
K
I
N
G1
1144455556648877720.0'5.7'20.0'5.6'R10.0'R30.0'R30.0'R50.0'20.0'5.7'24.0'734774117525.9'74910.0'10.0'43.9'53.3'30.8'30.6'SETBACK LINE35.0'BUFFER YARD30.0'SETBACK LINE5.0'24.0'7764SEE ENLARGEMENT 1ON SHEET G3.3SEE ENLARGEMENT 2ON SHEET G3.3SEE ENLARGEMENT 3ON SHEET G3.33377777612CONSTRUCTION LIMITS (TYP.)CONSTRUCTION LIMITS (TYP.)CONSTRUCTION LIMITS (TYP.)R10.0'206002040INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONALLEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWNWERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER INSERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEPROJECT AREA INCLUDING UNDERGROUND UTILITYCONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THEENGINEER.4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT ANAPPROVED STORM WATER MANAGEMENT PERMIT.5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BETHE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINERELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULTIN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THEDEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY.EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHINONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALLRESTORED/REPAIRED TO THE SATISFACTION OF THE CITY ATTHE COMPLETION OF THE PROJECT. THE CONTRACTOR ISENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITYPRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THEEXISTING CONDITION OF THE RIGHT-OF-WAY.7.REFER TO SITE DETAILS ON SHEETS G5.1 AND G5.2GENERAL NOTESCARMEL TAC REVIEW01/13/2021A19700317No.COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 220114.00CARMEL HIGHSCHOOLPERFORMINGARTS ADDITIONANDRENOVATIONSCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 03/08/2021DRAWN BY: HHW317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTCONSTRUCTION DOCUMENTSRESPONSE TAC COMMENTS04/19/2021BRESPONSE TAC COMMENTS05/17/2021CSITE KEYNOTESASPHALT PAVEMENT (1.5" SURFACE ON 3" BASE ON 8" STONE)6" CONCRETE PAVEMENT, SEE SHEET G1.5 FOR JOINTING PLANCROSSWALK4" CONCRETE SIDEWALK, SEE SHEET G1.5 FOR JOINTING PLAN6" CONCRETE CURB (STRAIGHT)CONCRETE CURB AND GUTTERADA RAMP, SEE SHEETS G3.3 AND G5.2 FOR MORE INFORMATIONSOD DISTURBED AREAS (PROVIDE 6" OF TOPSOIL)NEW TRASH DUMPSTER ENCLOSURE (SEE ARCHITECTURAL PLANS)123456789PROPOSED SITE LEGENDEXISTING BUILDINGBUILDING ADDITIONCONCRETE PAVEMENT / WALKASPHALT PAVEMENTLANDSCAPE AREAG1.3SITE PLANMATCH LINE (SEE SHEET G1.4)PROJECT PARKING SUMMARYLOT NO.(PERFORMING ARTS AND TRAIL LOT NORTH ADDITION)LOT NAMESTANDARD SPACEFRONT LOT1093EXIST.PROPOSED103ADA SPACE3EXIST.7POLICE SPACE3EXIST.3BUS SPACE0EXIST.0TOTAL SPACES115EXIST.113AUDITORIUM LOT5240400000560TRAIL LOT N. ADDITION0101550000000155PROJECT TOTAL161258773300171268NET GAIN = 97 SPACESPROPOSEDPROPOSEDPROPOSEDPROPOSED