Loading...
HomeMy WebLinkAboutC800 - Construction Details-C800DATEMARKREVISIONSBYCERTIFIED:S & A JOB NO. SHEET NO. DRAWN BY:CHECKED BY:THIS DRAWING IS NOT INTENDED TO BE REPRESENTED AS A RETRACEMENT OR ORIGINAL BOUNDARY SURVEY, A ROUTE SURVEY OR A SURVEYOR LOCATIONREPORT.S T O E P P E L W E R T HA L W A Y S O N7965 East 106th Street, Fishers, IN 46038-2505phone: 317.849.5935 fax: 317.849.5942SANITARY SEWER DETAILSSECTION FIVEC800 55115PYT-S5THE GROVE at THE LEGACYAEC BKR CLAY TOWNSHIPHAMILTON COUNTY, INDIANA03/17/21DP IT E S G E E O TS R P RTE W LE D E HVADIRJ .ADNINAI EEG NIRENOILA NS F EPRO STATE OF S File Name:S:\55115PYT-S5\DWG\C800 - Construction Details.dwg - C800Modified / By:May 12, 2021 12:47:45 PM / ecarsonPlotted / By:May 12, 2021 3:18:21 PM / Erik Carson05/11/21REVISED PER CITY OF CAMEL & CLIENT COMMENTSAEC...24" 28-1/2" 1" 26"7"1-1/2"36" SANITARY MANHOLE R-1642A NOT-TO-SCALE W5.00'5.00' The Contractor shall be required to furnish the developer's Engineer with a set of prints, marked in red pencil, showing actual sewer location and invert, to include lateral location, depth and length. Such asbuilt prints must be received by the Engineer before the final contract payment can be authorized. The sanitary sewer laterals and stubs termination shall be indicated on the surface with a metal fence post set immediately above the said termination point. IDEM SANITARY SEWER SPECIFICATIONS