Loading...
HomeMy WebLinkAboutLandscape Pages from Revised Construction Plans 6-16-20 6�Im Remove any container NTING DETAI Aluminum Finial Refractive Luminaire Model DI 33 - A028 Dynamic Lighting Cast Aluminum Pole Color: Black NOTE: For character review only. Options may include 12'-0" pole height, dual lamps, banner arms, receptacles, and street signs. Remove tags and PROTOTYPICAL STREET LIGHT FIXTURE Not To Scale Capstone — 3" Overhang. 0.5" Minimum Reveal - Limestone Band (4" tail by 2.5" thick) Downiight to be attached to bottom of cap or column face under overhang and directed to illuminate sign. Engraved Lettering- cut 0.25" deep and paintediack - fonts to be chosen by Owner. Veneer (natural stone, - or manufactured stone) - all manufactured stone to be attached to block with 0.5" Type-S mortar - grout joints to be 0.375"-0.416" and tooled. Weep - 2 per side just above finished grade. CMU Core Capstone CONIFEROUS TREE i Remove all wire baskets, twine and burlap. Before tree is in the hole, remove bottom of basket cutting horizontally. After tree is in the hole, remove rest of basket cutting vertically. Backfill using existing soil. Water thoroughly to eliminate air pockets. — Add 1-2 inches of hardwood mulch. Keep mulch 3 inches from trunk. 33" t l� 1 GROVE ® 101 Limestone Slab Sin 1 (+1- 22"x20" by 2.2T" thick) 1 i attached with 2" stainless t•" steel Z Anchors and Tap -Con nto CMU's- t t I t N ®®� Conduit to be installed • to accommodate wiring � for downlighi. f ❑❑® �w 1" t Limestone Slab Facinj +!- 13" high by 2.5" thick �. - 1" chamfer at top. J I ' I _1____J 1 I----�i -�L-J I it I I J�-- r---- i I I I i Front 33" Remove tags and labels. Prune only dead or broken branches or double leaders. Stake tree if necessary. Remove excess soil to locate and expose root flare. Root flare should be 1-2 inches above finish grade. Finish grade. �,gTNBQp� Limestone Slab Facing (+1- 18.75" by 2" thick) rl t 16 # t 1 k t Column Core - 13 standard CMU's high 16 -1.5 standard CMU's square - horizontal Dura-O-Wall 16" O.C. } 1... 9'-1" +1 '1�11 I Column Base - 3 standard CMU's high t__ _ JL_it— _ J - 1.75 to 2 standard CMU's square _ - - - horizontal Dura-O-Wall 16" O.C. r--yl lr----1 { I{ I I I I I I - - - - - - - - - - - - = Bottom of footer 36" below finished grade - Side 29" 1 --------- - - - - -I I l Concrete Footer- 44"x44"x12" thick 4000 psi with three #4 rebar reenforcement grid 10" O.C. centered horzontally in footer 6" from bottom no wooden stakes - must be poured into dry hole on .�-r l undisturbed soil - rebar minimum 2 from all surfaces - Contractor shall submit mix tickets I_ JJ �J J from concrete supplier to Owner. I I I I Plan Plan PROTOTYPICAL NEIGHBORHOOD ENTRY MONUMENT Not To Scale Remove trunk wrap If necessary. Remove all wire baskets, twine and burlap. Before tree is in the hole, remove bottom of basket cutting horizontally. After tree is in the hole, remove rest of basket cutting vertically. Backfill using existing soil. Water thoroughly to eliminate air pockets. — Add 1-2 inches of hardwood mulch. Keep mulch 3 inches from trunk. Remove tags and labels. Prune only dead or broken branches or double leaders. Stake tree if necessary. Remove excess soil to locate and expose root flare. Root flare should be 1-2 inches above finish grade. Finish grade. 60 0 30 60 1 INCH = 60 FEET al IIIIII�I w U_ w U 2 A� W I♦ J W I..L W O v� Q Z Q Z O Z O J_ V) = J_ Q w Uli 0 U W lti 0- Q U J W = 0 z Q J a !Y _ O z W O Q a >_ OfJ 0- U SECTION: I TOWNSHIP: I RANGE DRAWN BY: DATE: EWS 03.14.16 SHEET NO. C91 0 S&AJOB NO. 55115PYT