HomeMy WebLinkAboutBack Flow 10895 North Michigan Road
Jamie Cunningham
LD Huff Construction
Project Management
C: 317-496-4961
Jamie@ldhuff.com
Begin forwarded message:
From: Rob Dorsey <rob@justindorseyplumbing.com>
Date: June 12, 2020 at 9:54:46 AM EDT
To: Jamie Cunningham <jamie@ldhuff.com>
Subject: FW: We have received your response for City of Carmel Backflow Test Form
From: Michael Rodgers <Michael@justindorseyplumbing.com>
Sent: Friday, June 12, 2020 9:47 AM
To: Rob Dorsey <Rob@justindorseyplumbing.com>
Subject: Fwd: We have received your response for City of Carmel Backflow Test Form
Michael Rodgers - Service Manager
2378 State Road 236
Danville, IN 46122
317-525-4861 (c)
317-745-4830 (o)
Begin forwarded message:
From: Carmel Backflow <Backflow@carmel.in.gov>
Subject: We have received your response for City of Carmel Backflow Test Form
Date: June 11, 2020 at 11:09:01 AM EDT
To: michael@justindorseyplumbing.com
Reply-To: Backflow@carmel.in.gov
Testers Email
michael@justindorseyplumbing.com
Select Tester From List
SELECT IF TESTER IS NOT ON LIST
If Tester is not on the drop down list please add their information below
Michael Rodgers
Indiana State Certification Number
bf19_06672
Gauge Information
10190876
Phone Number
(317) 745-4830
Calibration Date
01-30-2020
Select Company or Self
Self
Select Service Use
Commercial
Type a question
1564886044
DEVICE LOCATION ADDRESS
Street name: Weston Pointe Drive
City: Zionsville
State: IN
Postal code: 46032
Country: United States
Existing, New or Replacing Device
New
Device Serial Number
4784549
Manufacturer of device
Wilkins
Device Size
2
Model Number Of Device
975XL2
Type of protection
Containment
Type Of Service
Domestic
Type a question
back of the building
Hazard Code
RP
Passed or Failed
PASS
DC
DC
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Date
Time
DC
DC
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Date
Time
RP
RP
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Pressure Differential Relief Valve Opened At What PISD
Did NOT Open
Date
Time
RP
RP
Check Valve #1 Held At What PSID
9
Closed Tight
X
Leaked
Check Valve #2 Held At What PSID
Closed Tight
X
Leaked
Pressure Differential Relief Valve Opened At What PSID
3.4
Did NOT Open
Passed or Failed
PASS
Tagged
YES
Date
06/10/2020 3:00 PM
Time
PVB
PVB
Opened At What PSID
Did NOT Open
Did OPEN
Check Valve Held At What PSID
Date
Time
PVB
PVB
Opened At What PSID
Did NOT Open
Did OPEN
Check Valve Held At What PSID
Date
Time
AIR GAP ONLY Final Test Results
Measured vertical inches above overflow rim
Supply size diameter
Air Gap
Date
Time
Testers Full Name:
Michael Rodgers
Date
06/11/2020 10:40 AM
Time
Testers Email
michael@justindorseyplumbing.com
Select Tester From List
SELECT IF TESTER IS NOT ON LIST
If Tester is not on the drop down list please add their information below
Michael Rodgers
Indiana State Certification Number
bf19_06672
Gauge Information
10190876
Phone Number
(317) 745-4830
Calibration Date
01-30-2020
Select Company or Self
Self
Select Service Use
Commercial
Type a question
1564886044
DEVICE LOCATION ADDRESS
Street name: Weston Pointe Drive
City: Zionsville
State: IN
Postal code: 46032
Country: United States
Existing, New or Replacing Device
New
Device Serial Number
4784549
Manufacturer of device
Wilkins
Device Size
2
Model Number Of Device
975XL2
Type of protection
Containment
Type Of Service
Domestic
Type a question
back of the building
Hazard Code
RP
Passed or Failed
PASS
DC
DC
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Date
Time
DC
DC
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Date
Time
RP
RP
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Pressure Differential Relief Valve Opened At What PISD
Did NOT Open
Date
Time
RP
RP
Check Valve #1 Held At What PSID
9
Closed Tight
X
Leaked
Check Valve #2 Held At What PSID
Closed Tight
X
Leaked
Pressure Differential Relief Valve Opened At What PSID
3.4
Did NOT Open
Passed or Failed
PASS
Tagged
YES
Date
06/10/2020 3:00 PM
Time
PVB
PVB
Opened At What PSID
Did NOT Open
Did OPEN
Check Valve Held At What PSID
Date
Time
PVB
PVB
Opened At What PSID
Did NOT Open
Did OPEN
Check Valve Held At What PSID
Date
Time
AIR GAP ONLY Final Test Results
Measured vertical inches above overflow rim
Supply size diameter
Air Gap
Date
Time
Testers Full Name:
Michael Rodgers
Date
06/11/2020 10:40 AM
Time
DC
DC
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Date
Time
DC
DC
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Date
Time
RP
RP
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Pressure Differential Relief Valve Opened At What PISD
Did NOT Open
Date
Time
RP
RP
Check Valve #1 Held At What PSID
9
Closed Tight
X
Leaked
Check Valve #2 Held At What PSID
Closed Tight
X
Leaked
Pressure Differential Relief Valve Opened At What PSID
3.4
Did NOT Open
Passed or Failed
PASS
Tagged
YES
Testers Email
michael@justindorseyplumbing.com
Select Tester From List
SELECT IF TESTER IS NOT ON LIST
If Tester is not on the drop down list please add their information below
Michael Rodgers
Indiana State Certification Number
bf19_06672
Gauge Information
10190876
Phone Number
(317) 745-4830
Calibration Date
01-30-2020
Select Company or Self
Self
Select Service Use
Commercial
Type a question
1564886044
DEVICE LOCATION ADDRESS
Street name: Weston Pointe Drive
City: Zionsville
State: IN
Postal code: 46032
Country: United States
Existing, New or Replacing Device
New
Device Serial Number
4784549
Manufacturer of device
Wilkins
Device Size
2
Model Number Of Device
975XL2
Type of protection
Containment
Type Of Service
Domestic
Type a question
back of the building
Hazard Code
RP
Passed or Failed
PASS
DC
DC
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Date
Time
DC
DC
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Date
Time
RP
RP
Check Valve #1 Held At What PISD
Closed Tight
Leaked
Check Valve #2 Held At What PISD
Closed Tight
Leaked
Pressure Differential Relief Valve Opened At What PISD
Did NOT Open
Date
Time
RP
RP
Check Valve #1 Held At What PSID
9
Closed Tight
X
Leaked
Check Valve #2 Held At What PSID
Closed Tight
X
Leaked
Pressure Differential Relief Valve Opened At What PSID
3.4
Did NOT Open
Passed or Failed
PASS
Tagged
YES
Date
06/10/2020 3:00 PM
Time
PVB
PVB
Opened At What PSID
Did NOT Open
Did OPEN
Check Valve Held At What PSID
Date
Time
PVB
PVB
Opened At What PSID
Did NOT Open
Did OPEN
Check Valve Held At What PSID
Date
Time
AIR GAP ONLY Final Test Results
Measured vertical inches above overflow rim
Supply size diameter
Air Gap
Date
Time
Testers Full Name:
Michael Rodgers
Date
06/11/2020 10:40 AM
Time