Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Thoroughfare Estimate
as of: April 1, 2021 Item No.Item Description Quantity Unit of Measure Unit Cost Item Cost 1 Bituminous Surface 9.5mm 28 TON $85.00 $2,380 2 Bituminous Binder 19.0mm 37 TON $80.00 $2,960 3 Bituminous Base 25.0mm 56 TON $75.00 $4,200 4 Asphalt Path 88 SYS $20.00 $1,760 5 Compacted Aggregate #53 141 TON $20.00 $2,820 6 INDOT Subgrade Treatment Type 1C 336 SYS $16.00 $5,376 7 6" Underdrain 250 LFT $8.00 $2,000 8 Aggregate for Underdrain 19 CYS $10.00 $190 9 Geotextile for Underdrain 169 SYS $3.00 $507 10 Handicap Ramp, Concrete 2 EA $600.00 $1,200 11 Concrete Sidewalk, 4 in.90 SYS $50.00 $4,500 12 Monolithic Curb and Sidewalk 130 SYS $65.00 $8,450 13 Concrete Curb, Type II 114 LF $15.00 $1,710 14 Straight Concrete Curb 87 LF $20.00 $1,740 $39,793.00Total Engineer's Estimate Magnolia Engineer's Estimate for Complying with Thoroughfare Plan Improvements Pawnee Road - Local Street Page 1 of 1