Loading...
HomeMy WebLinkAboutEx ROW Bonding Estimate 04.23.21Item No.Item Description Quantity Unit of Measure Unit Cost Item Cost 1 HMA Surface 9.5mm 28 TON $85.00 $2,380 2 HMA Intermediate 19.0mm 37 TON $80.00 $2,960 3 HMA Base 25.0mm 56 TON $75.00 $4,200 4 HMA Surface 9.5mm, Type B (Asphalt Path) 8 TON $85.00 $680 5 HMA Intermediate 19.0mm, Type B (Asphalt Path) 12 TON $80.00 $960 6 Compacted Aggregate #53 170 TON $20.00 $3,400 7 INDOT Subgrade Treatment Type 1C 336 SYS $16.00 $5,376 8 6" Underdrain 295 LFT $8.00 $2,360 9 Aggregate for Underdrain 23 CYS $10.00 $230 10 Geotextile for Underdrain 200 SYS $3.00 $600 11 Handicap Ramp, Concrete 2 EA $600.00 $1,200 12 Concrete Sidewalk, 4 in. 90 SYS $50.00 $4,500 13 Monolithic Curb and Sidewalk 130 SYS $65.00 $8,450 14 Concrete Curb, Type II 114 LF $15.00 $1,710 15 Straight Concrete Curb 87 LF $20.00 $1,740 16 Transverse Marking, Thermoplastic, White, 24" Solid, Crosswalk 36 LF $6.00 $216 17 Transverse Marking, Thermoplastic, White, 4" Solid, Parking Line 90 LF $3.00 $270 18 Inlet Type 'J' 1 EA $1,800.00 $1,800 19 Inlet Type 'M' 1 EA $1,800.00 $1,800 20 Storm Manhole Type 'C' 3 EA $2,500.00 $7,500 21 Mechanically Core Existing Inlet 1 EA $700.00 $700 22 12" RCP 306 LF $45.00 $13,770 23 12" HDPE Pipe 40 LF $40.00 $1,600 24 Common Excavation 272 CY $12.00 $3,264 25 Maintenance Of Traffic 1 LS $5,000.00 $5,000 26 Construction Engineering 1 LS $1,600.00 $1,600 $78,266 Note: Str. #7, 8, and 9 are excluded from this estimate since they're already included in EC bond estimate. Total Engineer's Estimate Magnolia Condominiums Magnolia Condos, LLC Preliminary Engineer's Estimate of 126th St. & Pawnee Rd. ROW Improvements as of: April 23, 2021 Page 1 of 1