Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Prop ROW Bonding Estimate 04.23.21
Item No.Item Description Quantity Unit of Measure Unit Cost Item Cost 1 HMA Surface 9.5mm 28 TON $85.00 $2,380 2 HMA Intermediate 19.0mm 37 TON $80.00 $2,960 3 HMA Base 25.0mm 56 TON $75.00 $4,200 4 Compacted Aggregate #53 112 TON $20.00 $2,240 5 INDOT Subgrade Treatment Type 1C 140 SYS $16.00 $2,240 6 6" Underdrain 217 LFT $8.00 $1,736 7 Aggregate for Underdrain 17 CYS $10.00 $170 8 Geotextile for Underdrain 147 SYS $3.00 $441 9 Handicap Ramp, Concrete 2 EA $600.00 $1,200 10 Monolithic Curb and Sidewalk 40 SYS $65.00 $2,600 11 Concrete Roll Curb 126 LF $15.00 $1,890 12 Transverse Marking, Thermoplastic, White, 24" Solid, Crosswalk 30 LF $6.00 $180 13 Transverse Marking, Thermoplastic, White, 24" Solid, Stop Bar 12 LF $6.00 $72 14 Stormtech Chambers 1 LS $15,700.00 $15,700 15 12" RCP 9 LF $45.00 $405 16 12" HDPE Pipe 6 LF $40.00 $240 17 Common Excavation 272 CY $12.00 $3,264 18 Construction Engineering 1 LS $1,000.00 $1,000 $42,918 Note: Str. #9, 10 and 12 and Stormtech Isolator Row are excluded from this estimate since they're already included in EC bond estimate. Total Engineer's Estimate Magnolia Condominiums Magnolia Condos, LLC Preliminary Engineer's Estimate of Sweetgrass Dr. ROW Improvements as of: April 23, 2021 Page 1 of 1