HomeMy WebLinkAboutE001.0DEDICATED GFI w/ GAS WATER HEATER OPT.
TO LIGHT \PABOVE
ELECTRICAL PANEL (VERIFY LOCATION IN FIELD)DEDICATED GFI FOR SUMP PUMP (VERIFY IN FIELD)OPT. DEDICATED GFI FOR EJECTOR PUMP (VERIFY IN FIELD)MEDIA/SWP PANEL LOCATION AT BASEMENT CONDITION
\A1;1'-6{\H0.75x;\S7#8;}"
GFI
GAS VALVEGFIOPT. GAS VALVEGFI220V
SS
S/CBASEMENT - UNFINISHEDCONCRETE SLABCONCRETE SLABU0.01 BASEMENT UTILITY PLANMidwest Zone Office1900 Golf Road - Suite 300Schaumburg, Illinois 60173(c) Copyright 2019 PulteGroup, Inc.
PRODUCT MANAGERRick StarkeyVERSION RELEASEDATE:05/10/2019
PROJECT TYPE
GARAGE LEFT
SHEET
PLAN NAME
SPECIFICATION LEVEL
NPC CHILD NUMBER
----
Maplevalley
1039.300Home for * Market Home *, 7261-10000#214178 Atlas Court, Carmel, IN 46074BASEMENT FOUNDATION PLANSCALE: 1/4" = 1'-0" (HALF SCALE ON 11x17 PAPER)
06/16/21