Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S000.2
ELEVATIONS EC2N, HR2Z, HR2I, NC2H ADDED TO IN SET STRUCTURAL REVISIONS2017-12-01 DELTA 7.0{\H0.63636x; (ALL DIVISIONS AFFECTED)}{\LGENERAL REVISIONS (NOT CLOUDED)}COORDINATE ALL STONE LEDGE AND PORCH FTGSCHANGED G.T. TO (2)2x10 IN GARAGE{\L2ND FLOOR FRAMING (S-2.X'S)}COORDINATE ALL STONE LEDGE AND PORCH FTGSREVISED W10x BEAM SIZE AT OPT. SUNROOM{\LOPTIONS FRAMING (SO-X.X'S)}ADDED BLOCKING AT REAR OPTIONS w/ GATH. EXT.ADDED COVERED PORCH OPTIONS2018-02-09 DELTA 7.1{\H0.63636x; (MI DIVISION AFFECTED)}REVISED CANT'D BEAM CALLOUT ON ELEV. HR2V-10{\L2ND FLOOR FRAMING (S-2.X'S)} UPDATED GRADE BRICK GRAPHICS @ ELEVS. CT2T, EC30, HR2H, HR2C, HR2Y, AND PR2H PER ARCH2019-05-10 DELTA 8.0{\H0.63636x; (PCR - ALL DIVISIONS AFFECTED)}{\LGENERAL REVISIONS (NOT CLOUDED)} {\L2ND FLOOR FRAMING (S-2.X'S)}ADDED OPT. FLEX WDWS & SIDE WDW OPT. OH DIVISON: 2018 RCO UPDATE - LATERAL REVISION{\L1ST FLOOR FRAMING FRAMING (S-1.X'S)}IL DIVISON: REMOVED W10x BASEMENT BEAM OPTIONS {\LROOF FRAMING (S-3.X'S)}REVISED WDW LOCATION AT BEDROOM 2 {\LOPTIONS FRAMING (SO-X.X'S)} UPDATED FINISHED BASEMENT STORAGE DOOR (NON-STRUCT) PER ARCHREVISED BEDROOM 4 CLOSET DOOR (NON-STRUCT) PER ARCH OH DIVISIONS: REMOVED W8x BASEMENT BEAM OPTIONS IL DIVISION ONLY: REMOVED ALL LVL/LSL WINDOW HEADER SPECS WHERE MSR OPTION PROVIDEDOH DIVISION ONLY: REMOVED ALL MSR WINDOW HEADER SPECS WHERE LVL/LSL OPTION PROVIDEDOH/MI DIVISIONS ONLY: REMOVED ALL GARAGE DOOR HEADER LINTEL OPTIONS EXCEPT OPTION C (BOLTED BACK LINTEL) IL DIVISION ONLY: REMOVED ALL LVL/LSL WINDOW HEADER SPECS WHERE MSR OPTION PROVIDEDOH DIVISION ONLY: REMOVED ALL MSR WINDOW HEADER SPECS WHERE LVL/LSL OPTION PROVIDED IL/OH/MI DIVISIONS ONLY: REMOVED ALL MSR WINDOW HEADER SPECS WHERE LVL/LSL OPTION PROVIDED @ WALKOUT/DAYLIGHT BASEMENTS IL DIVISION ONLY: REMOVED ALL LVL GARAGE BEAM OPTIONS & ADDED STEEL POST ALTERNATEIN/MI DIVISIONS ONLY: UPDATED ALL 22" LVL TO 24" LVLOH/MI DIVISIONS ONLY: REMOVED ALL STEEL GARAGE BEAM OPTIONS REMOVED MO + KY SETREVISED GENERAL NOTES & DETAILS OHIO DIVISION 2018 RCO UPDATE - LATERAL REVISION OHIO DIVISON: 2018 RCO UPDATE - LATERAL REVISION OHIO DIVISON: 2018 RCO UPDATE - LATERAL REVISION IN/MI DIVISION: UPDATED BASEMENT BEAMS PER REDLINES UPDATED EXTERIOR GARAGE WALL STUD SPECS \A1;REVISED GARAGE BEAM FROM (2)1{\H0.7x;\S3#4;}"x24" LVL DROPPED TO (3)1{\H0.7x;\S3#4;}"x18" LVL DROPPED2019-07-26 DELTA 8.1{\H0.63636x; (MI DIVISION AFFECTED)}{\LGENERAL REVISIONS (NOT CLOUDED)} \A1;OH DIVISION: ADDED ELEVATION HR2F, HR2G-CS01, CR2G-CS01, HR2U-CS01 & EC3M-CS02 2 CAR FRONT, 3 CAR FRONT, 2 CAR SIDE, 3 CAR SIDE GARAGES2019-12-06 DELTA 8.2{\H0.63636x; (IN&OH DIVISIONS AFFECTED)}{\LGENERAL REVISIONS (NOT CLOUDED)} {\L2ND FLOOR FRAMING (S-2.X'S)}IN DIVISON: 2020 CODE UPDATE - LATERAL REVISION{\L1ST FLOOR FRAMING FRAMING (S-1.X'S)} {\LROOF FRAMING (S-3.X'S)}{\LOPTIONS FRAMING (SO-X.X'S)}IN DIVISION 2020 CODE UPDATE - LATERAL REVISIONIN DIVISON: 2020 CODE UPDATE - LATERAL REVISIONIN DIVISON: 2020 CODE UPDATE - LATERAL REVISION (c) Copyright 2019 PulteGroup, Inc.1900 Golf Road - Suite 300Schaumburg, Illinois 60173Midwest Zone Office03/17/2014Rick Starkey GARAGE LEFT ---- Maplevalley 1039.300 12-01-2017 805/10/2019PCR REVISIONS PRODUCT MANAGERINITIAL RELEASEDATE:REV#DATE/DESCRIPTION GARAGE HANDING SHEET PLAN NAME SPECIFICATION LEVEL NPC CHILD NUMBER 8.212/06/2019CS-ADDED ELEV. S-0.1...STRUCTURAL NOTES - IN06/16/21