Loading...
HomeMy WebLinkAboutC301CARMEL-CLAY PARKS & RECREATION BOARD TRACT A - INSTR. #9809807935 TRACT B - INSTR. #9809807936 W W W WWE E EEEEEE EEE EEEEEEEEC C C C C G G G GEEEEOHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUEN00°09'42"W 761.17'S89°59'52"W 775.74' D D D D DD D D DDDD D D D D D D D D D D D D DDD D D D DD D D D D D DD D D D DDD D DDDDDD DDDDDD DD D DDDDDD D D D D D D DD DD D D DD D D DD DD D DDDDD D DDSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSF SF SF SF SF SF SF SF SFSF SF SFSFSF SF SF SF SFSF SF SF SF SF SF SF SFSF SF SF SF SFSFSF SF SF SFSF SFSFSFSFSFSFSFSFSFSF S F S F TEMPORARY TOPSOIL STOCKPILE TREE PROTECTION FENCE TREE PROTECTION FENCE (EXISTING SHADE TREE TO BE LOCATED ON SITE BY GENERAL CONTRACTOR) CONCRETE WASHOUT AREA CONSTRUCTION ENTRANCE MODIFY EXISTING SIDEWALK AS REQUIRED. REPAIR TO NEW CONDITION UPON PROJECT COMPLETION. CONSTRUCTION STAGING AREA W/TRASH RECEPTACLE, PORT-O-LET. CONTRACTOR TO VERIFY FINAL LOCATION CONSTRUCTION LIMITS SILT FENCE CONSTRUCTION LIMITS SILT FENCE CONSTRUCTION LIMITS SILT FENCE INLET PROTECTION NPDES POSTING BOX INLET PROTECTION INLET PROTECTION SFSFSFS F S F SITE CONDITIONS DO NOT PERMIT 150' CONSTRUCTION ENTRANCE. MAKE ENTRANCE AS LONG AS SITE CONDITIONS ALLOW. DOUBLE ROW OF COIR FIBER LOG DAM DOUBLE ROW OF COIR FIBER LOG DAM SITE CONDITIONS DO NOT PERMIT 150' CONSTRUCTION ENTRANCE. MAKE ENTRANCE AS LONG AS SITE CONDITIONS ALLOW. 10 9 a b c d 8 7 6 e f g h10 9 8 7 6 REVISIONS AND ISSUES 5 4 3 2 1 PREPARED FOR:PROJECT NO. SHEET NO.a b c d 5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATE BYe DATE:1 E N GI N E E R S317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil Engi neeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netf hKnow what'sbelow. before you dig.Call R gSection 1, Township 17 North, Range 3 East, Clay Township, Hamilton County, Indiana W200371CARMEL, IN 46033AQW20037103/05/2020BSAQLAWRENCE W. INLOW PARKPHASE II IMPROVEMENTSRUSSELL L. WEBSTER II, PE No. 11900318 03/23/2021RUSSELLL.WEBST ER IIPROFESSIONA L E NGINEE RRE G I S T ER E DINDIA N A PE11900318 STATE OF NO. C301PRE-CON SWPPPD D S XXX SF SF LEGENDSTORMWATER POLLUTION PREVENTION GENERAL NOTES: DEVELOPMENT NOTES 1. THE CONTRACTOR, WHETHER OWNING THE PROPERTY OR ACTING AS THE AGENT OF THE PROPERTY OWNER, SHALL BE RESPONSIBLE FOR EROSION AND SEDIMENT CONTROL REQUIREMENTS ASSOCIATED WITH ACTIVITIES ON SITE. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR MINIMIZING SEDIMENT DISCHARGE AND TRACKING FROM THE SITE THROUGHOUT THE LAND DISTURBING ACTIVITIES UNTIL PERMANENT STABILIZATION HAS BEEN ACHIEVED. 3. CONTRACTOR SHALL CLEAN UP SEDIMENT THAT IS EITHER TRACKED OR WASHED ONTO ROADS. BULK CLEARING OF SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER. CLEARED SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED ON IN A MANNER THAT IS IN COMPLIANCE WITH ALL APPLICABLE STATUES AND RULES. 4. ADJACENT PROPERTY DISTURBED BY CONTRACTOR MUST BE REPAIRED AND STABILIZED WITH TEMPORARY OR PERMANENT SURFACE STABILIZATION. GENERAL NOTES 1. SHEET C301 SHALL SERVE AS A GUIDELINE FOR STORM WATER QUALITY. ADDITIONAL REQUIREMENTS MAY BE MADE IN THE FIELD IF PROVISIONS SHOWN PROVE INADEQUATE IN PREVENTING SOIL EROSION AND/OR STORM WATER POLLUTION. 2. SEE EROSION CONTROL SEQUENCE ON SHEET C301-C302 FOR PRE-CONSTRUCTION THROUGH POST-CONSTRUCTION REQUIREMENTS. 3. SPILL PREVENTION AND CLEAN UP MEASURES SHALL BE IMPLEMENTED FOR THE STORAGE AND HANDLING OF MATERIALS, SUCH AS FUELS OR HAZARDOUS WASTES, TO MINIMIZE THE POTENTIAL FOR POLLUTANTS TO CONTAMINATE SURFACE OR GROUND WATER OR DEGRADE SOIL QUALITY. 4. MATERIALS HANDLING AND STORAGE ASSOCIATED WITH CONSTRUCTION ACTIVITY SHALL MEET THE SPILL PREVENTION AND SPILL RESPONSE REQUIREMENTS OF THE STATE OF INDIANA LAWS GOVERNING REPORTING, CONTAINMENT, AND RESPONSE TO SPILLS OF HAZARDOUS AND/OR OBJECTIONABLE MATERIALS. 5. CONTRACTOR SHALL IMPLEMENT MEASURES TO MINIMIZE OR ELIMINATE WASTES OR UNUSED BUILDING MATERIALS, INCLUDING GARBAGE, DEBRIS, CLEANING WASTES, WASTEWATER, CONCRETE TRUCK WASHOUT, AND OTHER SUBSTANCES FROM BEING CARRIED FROM A PROJECT SITE BY RUN-OFF OR WIND. IDENTIFICATION OF AREAS WHERE CONCRETE TRUCK WASHOUT IS PERMISSIBLE MUST BE CLEARLY POSTED AT APPROPRIATE AREAS OF THE SITE. WASTES AND UNUSED BUILDING MATERIALS SHALL BE MANAGED AND DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE STATUES AND REGULATIONS. 6. AS GRADING IS DONE, AND STORM SEWERS INSTALLED, INLET PROTECTION, SILT TRAPS, SILT FENCES, TEMPORARY DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT CONTAINED ON SITE. 7. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER COMPLETION OF GROUND ACTIVITY. 8. THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON THE WEATHER. IF CONSTRUCTION ACTIVITY IS TO CEASE FOR MORE THAN TEN CALENDAR DAYS, THE DISTURBED AREAS SHALL BE TEMPORARILY SEEDED OR MULCHED. 9. PERMANENT AND FINAL VEGETATION SHALL BE INSTALLED AS SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. 10. FINAL STABILIZATION OF A PROJECT SITE IS CONSIDERED ACHIEVED WHEN ALL LAND DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF SEVENTY PERCENT (70%) HAS BEEN ESTABLISHED ON ALL UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES, OR EQUIVALENT PERMANENT STABILIZATION MEASURES HAVE BEEN EMPLOYED. 11. THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR. 12. ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THE TEMPORARY EROSION CONTROL DEVICES. 13. A TRAINED INDIVIDUAL (AS DEMONSTRATED BY CERTIFICATION OR EXPERIENCE) SHALL PERFORM A WRITTEN EVALUATION OF THE PROJECT SITE BY THE END OF THE NEXT BUSINESS DAY FOLLOWING EACH MEASURABLE STORM EVENT, BUT NOT LESS THAN ONCE A WEEK. 14. THE WRITTEN EVALUATION REPORTS MUST ADDRESS MAINTENANCE OF STORM WATER QUALITY MEASURES, PROBLEMS IDENTIFIED AT THE PROJECT SITE AND CORRECTIVE ACTIONS RECOMMENDED AND COMPLETED TO ENSURE COMPLIANCE. EVALUATION REPORTS MUST BE MADE AVAILABLE TO THE INSPECTING AUTHORITY WITHIN 48 HOURS OF A REQUEST. 15. OFF-SITE SOIL DISPOSAL MUST BE A PART OF THE SWPPP. IT IS THE RESPONSIBILITY OF THE PROJECT SIRE OWNER TO ENSURE THAT OFF-SITE SOIL DISPOSAL AREAS ARE EFFECTIVELY TREATED TO MINIMIZE EROSION AND SEDIMENTATION. 16. ANY PART OF THE REVIEWED SWPPP THAT DEALS DIRECTLY WITH EROSION AND SEDIMENT CONTROL SPECIFICATIONS, RECOMMENDATIONS OR REQUIREMENTS NOT FOUND ON THE PLAN DRAWING SET (SUCH AS THE SWPPP NARRATIVE), MUST BE PROVIDED TO THE ON-SITE PERSON RESPONSIBLE FOR SWPPP COMPLIANCE. IN ADDITION ANY EROSION AND SEDIMENT CONTROL INFORMATION NOT PROVIDED TO THE COUNTY AT THE TIME OF THE SWPPP REVIEW (SUCH AS ADDITIONAL SEQUENCING TIMETABLES, SOIL STOCKPILING LOCATIONS/PROTECTION, SOIL DISPOSAL LOCATIONS, STAGING AREA LOCATIONS, ETC.) MUST BE PROVIDED TO THE COUNTY OFFICE PRIOR TO THE LAND DISTURBING ACTIVITY. 17. THE COUNTY MUST BE NOTIFIED WITHIN 48 HOURS OF ACTUAL CONSTRUCTION START UP ACTIVITIES ON THE SITE. A PHONE CALL OR EMAIL IS ALL THAT IS NECESSARY. THE COUNTY WILL BE CONDUCTING PERIODIC ON-SITE SWPPP COMPLIANCE CHECKS ONCE THE PROJECT STARTS. STORMWATER POLLUTION PREVENTION GENERAL NOTES: 1. EARTH MOVING MAY NOT COMMENCE UNTIL ITEMS 2-4 OF "PRECONSTRUCTION ACTIVITIES" ON THIS SHEET HAVE BEEN COMPLETED IN ADDITION TO ITEMS DEPICTED ON PLAN. 2. RULE 5 REQUIRES ALL DISTURBED AREAS THAT WILL POTENTIALLY BE IDLE FOR 10 DAYS OR MORE TO BE STABILIZED (SEEDED, MULCHED, ETC.) IMMEDIATELY. 3. ADDITIONAL STORM WATER POLLUTION PREVENTION MAY BE REQUIRED IN THE FIELD BY HAMILTON COUNTY 4. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS IN THE STREETS. 5. APPROXIMATE CONSTRUCTION SCHEDULE: START DATE: APRIL 2021 COMPLETION DATE: DECEMBER 2021 6. LATITUDE: 39.97858 LONGITUDE: -86.06317 7. CONTACT PERSON: MICHAEL KLITZING, DIRECTOR CARMEL/CLAY PARKS & RECREATION 1411 EAST 116TH STREET CARMEL, INDIANA 46032 (317) 573-4018 9. WARNING: THIS SHEET TO BE USED FOR STORM WATER POLLUTION PREVENTION PURPOSES ONLY. 10. SEE SHEETS C300-C305 FOR ALL STORM WATER POLLUTION PREVENTION PLAN DETAILS & NOTES SILT FENCE SEE SHEET C301 CONSTRUCTION LIMITS TREE PROTECTION FENCE SEE SHEET C301 EXISTING CONTOUR EXISTING SANITARY SEWER EXISTING STORM SEWER W S N E NOTE: AVOIDING DAMAGE DURING CONSTRUCTION THE SUREST WAY TO PROTECT TREES THAT ARE TO BE SAVED IS TO: 1. WORK WITH THE BUILDER TO LOCATE AND MARK WITH FLAGGING AND/OR SIGNS ALL CONSTRUCTION ROADS, PARKING PLACES FOR WORKERS, AND AREAS FOR STORAGE OF BUILDING MATERIALS, GRAVEL AND SOIL. 2. WORK WITH THE UTILITY CONTRACTORS TO STAKE OUT THE EXACT LOCATION OF TRENCHES. 3. ERECT PHYSICAL BARRIERS AROUND ALL "SAVED" TREES OR, BETTER YET, AROUND GROUPS OF TREES, NEAR THE CONSTRUCTION ACTIVITY. 4. EXTEND BARRIERS AS FAR AS POSSIBLE BEYOND DRIPLINE. HIGH VISABILTIY PLASTIC MESH SNOW FENCE FENCE (NO SCALE) TREE PROTECTION DETAIL BARRIERS THAT EXTEND BEYOND THE DRIPLINE PROTECT TREES DURING CONSTRUCTION. EX. GRADE FENCE POST HIGH VISABILTIY PLASTIC MESH SNOW FENCE WATER DRIP-LINE EX. TREE (DRIP-LINE) PROP. FENCE POST INLET PROTECTION 1 REVISED TREE PROTECTION FENCING 03/22/2021 MRK1 COIR FIBER LOG DAM, SEE SHEET C805 2 2 REVISED ADDITIONAL SILT FENCE 04/16/2021 AMQ1 REVISED COIR FIBER LOG DAM 04/16/2021 AMQ1 2 2 3 REVISED LIMITS OF DISTURBANCE/CONST. ENTANRANCE 3 3 04/16/2021 AMQ 06/17/21