TRACT A - INSTR. #9809807935
TRACT B - INSTR. #9809807936
W W W
WWE E EEEEEE EEE EEEEEEEEC C C C C
G G G GEEEEOHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUEN00°09'42"W 761.17'S89°59'52"W 775.74' D D D D DD D D DDDD D D D D D D D D D D D D DDD
D D D DD D D D D D DD D D D DDD D DDDDDD DDDDDD DD D
DDDDDD D D D D D D DD DD
D D DD D D DD DD D DDDDD D DDSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSF SF SF SF SF SF SF SF SFSF SF SFSFSF SF SF SF SFSF SF SF SF SF SF SF SFSF SF SF SF SFSFSF SF SF SFSF SFSFSFSFSFSFSFSFSFSF
S
F
S
F
TEMPORARY TOPSOIL
STOCKPILE
TREE PROTECTION FENCE
TREE PROTECTION FENCE
(EXISTING SHADE TREE TO BE
LOCATED ON SITE BY GENERAL
CONTRACTOR)
CONCRETE WASHOUT
AREA
CONSTRUCTION ENTRANCE
MODIFY EXISTING SIDEWALK
AS REQUIRED. REPAIR TO NEW
CONDITION UPON PROJECT
COMPLETION.
CONSTRUCTION STAGING AREA W/TRASH
RECEPTACLE, PORT-O-LET. CONTRACTOR
TO VERIFY FINAL LOCATION
CONSTRUCTION LIMITS
SILT FENCE
CONSTRUCTION LIMITS
SILT FENCE
CONSTRUCTION LIMITS
SILT FENCE
INLET PROTECTION
NPDES POSTING BOX
INLET PROTECTION
INLET PROTECTION SFSFSFS
F
S
F
SITE CONDITIONS DO NOT PERMIT
150' CONSTRUCTION ENTRANCE.
MAKE ENTRANCE AS LONG AS
SITE CONDITIONS ALLOW.
DOUBLE ROW OF COIR
FIBER LOG DAM
DOUBLE ROW OF COIR
FIBER LOG DAM
SITE CONDITIONS DO NOT PERMIT
150' CONSTRUCTION ENTRANCE.
MAKE ENTRANCE AS LONG AS
SITE CONDITIONS ALLOW.
10 9 a b c d 8 7 6 e f g h10 9 8 7 6 REVISIONS AND ISSUES 5 4 3 2 1 PREPARED FOR:PROJECT NO.
SHEET NO.a b c d 5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATE BYe DATE:1
E N GI N E E R S317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil Engi neeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netf hKnow what'sbelow.
before you dig.Call
R gSection 1, Township 17 North, Range 3 East, Clay Township, Hamilton County, Indiana W200371CARMEL, IN 46033AQW20037103/05/2020BSAQLAWRENCE W. INLOW PARKPHASE II IMPROVEMENTSRUSSELL L. WEBSTER II, PE No. 11900318
03/23/2021RUSSELLL.WEBST
ER IIPROFESSIONA L E NGINEE RRE G I S T ER
E
DINDIA N A
PE11900318
STATE OF
NO.
C301PRE-CON SWPPPD D
S
XXX
SF SF
LEGENDSTORMWATER POLLUTION PREVENTION GENERAL NOTES:
DEVELOPMENT NOTES
1. THE CONTRACTOR, WHETHER OWNING THE PROPERTY OR ACTING AS THE AGENT OF THE PROPERTY OWNER, SHALL BE RESPONSIBLE FOR
EROSION AND SEDIMENT CONTROL REQUIREMENTS ASSOCIATED WITH ACTIVITIES ON SITE.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MINIMIZING SEDIMENT DISCHARGE AND TRACKING FROM THE SITE THROUGHOUT THE LAND
DISTURBING ACTIVITIES UNTIL PERMANENT STABILIZATION HAS BEEN ACHIEVED.
3. CONTRACTOR SHALL CLEAN UP SEDIMENT THAT IS EITHER TRACKED OR WASHED ONTO ROADS. BULK CLEARING OF SEDIMENT SHALL NOT INCLUDE
FLUSHING THE AREA WITH WATER. CLEARED SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED ON IN A MANNER THAT IS IN COMPLIANCE WITH ALL
APPLICABLE STATUES AND RULES.
4. ADJACENT PROPERTY DISTURBED BY CONTRACTOR MUST BE REPAIRED AND STABILIZED WITH TEMPORARY OR PERMANENT SURFACE
STABILIZATION.
GENERAL NOTES
1. SHEET C301 SHALL SERVE AS A GUIDELINE FOR STORM WATER QUALITY. ADDITIONAL REQUIREMENTS MAY BE MADE IN THE FIELD IF PROVISIONS
SHOWN PROVE INADEQUATE IN PREVENTING SOIL EROSION AND/OR STORM WATER POLLUTION.
2. SEE EROSION CONTROL SEQUENCE ON SHEET C301-C302 FOR PRE-CONSTRUCTION THROUGH POST-CONSTRUCTION REQUIREMENTS.
3. SPILL PREVENTION AND CLEAN UP MEASURES SHALL BE IMPLEMENTED FOR THE STORAGE AND HANDLING OF MATERIALS, SUCH AS FUELS OR
HAZARDOUS WASTES, TO MINIMIZE THE POTENTIAL FOR POLLUTANTS TO CONTAMINATE SURFACE OR GROUND WATER OR DEGRADE SOIL QUALITY.
4. MATERIALS HANDLING AND STORAGE ASSOCIATED WITH CONSTRUCTION ACTIVITY SHALL MEET THE SPILL PREVENTION AND SPILL RESPONSE
REQUIREMENTS OF THE STATE OF INDIANA LAWS GOVERNING REPORTING, CONTAINMENT, AND RESPONSE TO SPILLS OF HAZARDOUS AND/OR
OBJECTIONABLE MATERIALS.
5. CONTRACTOR SHALL IMPLEMENT MEASURES TO MINIMIZE OR ELIMINATE WASTES OR UNUSED BUILDING MATERIALS, INCLUDING GARBAGE, DEBRIS,
CLEANING WASTES, WASTEWATER, CONCRETE TRUCK WASHOUT, AND OTHER SUBSTANCES FROM BEING CARRIED FROM A PROJECT SITE BY
RUN-OFF OR WIND. IDENTIFICATION OF AREAS WHERE CONCRETE TRUCK WASHOUT IS PERMISSIBLE MUST BE CLEARLY POSTED AT APPROPRIATE
AREAS OF THE SITE. WASTES AND UNUSED BUILDING MATERIALS SHALL BE MANAGED AND DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE
STATUES AND REGULATIONS.
6. AS GRADING IS DONE, AND STORM SEWERS INSTALLED, INLET PROTECTION, SILT TRAPS, SILT FENCES, TEMPORARY DIVERSIONS AND OTHER
RUNOFF CONTROL MEASURES AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT CONTAINED ON SITE.
7. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER COMPLETION OF GROUND ACTIVITY.
8. THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON THE WEATHER. IF
CONSTRUCTION ACTIVITY IS TO CEASE FOR MORE THAN TEN CALENDAR DAYS, THE DISTURBED AREAS SHALL BE TEMPORARILY SEEDED OR
MULCHED.
9. PERMANENT AND FINAL VEGETATION SHALL BE INSTALLED AS SOON AS PRACTICAL UNDER THE CIRCUMSTANCES.
10. FINAL STABILIZATION OF A PROJECT SITE IS CONSIDERED ACHIEVED WHEN ALL LAND DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND A
UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF SEVENTY PERCENT (70%) HAS BEEN ESTABLISHED ON ALL UNPAVED AREAS AND
AREAS NOT COVERED BY PERMANENT STRUCTURES, OR EQUIVALENT PERMANENT STABILIZATION MEASURES HAVE BEEN EMPLOYED.
11. THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL SILTATION OF THE STREETS
AND STORM SEWERS WILL NO LONGER OCCUR.
12. ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR SHALL REMOVE AND
DISPOSE OF THE TEMPORARY EROSION CONTROL DEVICES.
13. A TRAINED INDIVIDUAL (AS DEMONSTRATED BY CERTIFICATION OR EXPERIENCE) SHALL PERFORM A WRITTEN EVALUATION OF THE PROJECT SITE
BY THE END OF THE NEXT BUSINESS DAY FOLLOWING EACH MEASURABLE STORM EVENT, BUT NOT LESS THAN ONCE A WEEK.
14. THE WRITTEN EVALUATION REPORTS MUST ADDRESS MAINTENANCE OF STORM WATER QUALITY MEASURES, PROBLEMS IDENTIFIED AT THE
PROJECT SITE AND CORRECTIVE ACTIONS RECOMMENDED AND COMPLETED TO ENSURE COMPLIANCE. EVALUATION REPORTS MUST BE MADE
AVAILABLE TO THE INSPECTING AUTHORITY WITHIN 48 HOURS OF A REQUEST.
15. OFF-SITE SOIL DISPOSAL MUST BE A PART OF THE SWPPP. IT IS THE RESPONSIBILITY OF THE PROJECT SIRE OWNER TO ENSURE THAT OFF-SITE
SOIL DISPOSAL AREAS ARE EFFECTIVELY TREATED TO MINIMIZE EROSION AND SEDIMENTATION.
16. ANY PART OF THE REVIEWED SWPPP THAT DEALS DIRECTLY WITH EROSION AND SEDIMENT CONTROL SPECIFICATIONS, RECOMMENDATIONS OR
REQUIREMENTS NOT FOUND ON THE PLAN DRAWING SET (SUCH AS THE SWPPP NARRATIVE), MUST BE PROVIDED TO THE ON-SITE PERSON
RESPONSIBLE FOR SWPPP COMPLIANCE. IN ADDITION ANY EROSION AND SEDIMENT CONTROL INFORMATION NOT PROVIDED TO THE COUNTY AT
THE TIME OF THE SWPPP REVIEW (SUCH AS ADDITIONAL SEQUENCING TIMETABLES, SOIL STOCKPILING LOCATIONS/PROTECTION, SOIL DISPOSAL
LOCATIONS, STAGING AREA LOCATIONS, ETC.) MUST BE PROVIDED TO THE COUNTY OFFICE PRIOR TO THE LAND DISTURBING ACTIVITY.
17. THE COUNTY MUST BE NOTIFIED WITHIN 48 HOURS OF ACTUAL CONSTRUCTION START UP ACTIVITIES ON THE SITE. A PHONE CALL OR EMAIL IS ALL
THAT IS NECESSARY. THE COUNTY WILL BE CONDUCTING PERIODIC ON-SITE SWPPP COMPLIANCE CHECKS ONCE THE PROJECT STARTS.
STORMWATER POLLUTION
PREVENTION GENERAL NOTES:
1. EARTH MOVING MAY NOT COMMENCE UNTIL ITEMS 2-4 OF
"PRECONSTRUCTION ACTIVITIES" ON THIS SHEET HAVE BEEN
COMPLETED IN ADDITION TO ITEMS DEPICTED ON PLAN.
2. RULE 5 REQUIRES ALL DISTURBED AREAS THAT WILL POTENTIALLY
BE IDLE FOR 10 DAYS OR MORE TO BE STABILIZED (SEEDED,
MULCHED, ETC.) IMMEDIATELY.
3. ADDITIONAL STORM WATER POLLUTION PREVENTION MAY BE
REQUIRED IN THE FIELD BY HAMILTON COUNTY
4. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS IN
THE STREETS.
5. APPROXIMATE CONSTRUCTION SCHEDULE:
START DATE: APRIL 2021
COMPLETION DATE: DECEMBER 2021
6. LATITUDE: 39.97858
LONGITUDE: -86.06317
7. CONTACT PERSON:
MICHAEL KLITZING, DIRECTOR
CARMEL/CLAY PARKS & RECREATION
1411 EAST 116TH STREET
CARMEL, INDIANA 46032
(317) 573-4018
9. WARNING:
THIS SHEET TO BE USED FOR STORM WATER POLLUTION
PREVENTION PURPOSES ONLY.
10. SEE SHEETS C300-C305 FOR ALL STORM WATER POLLUTION
PREVENTION PLAN DETAILS & NOTES
SILT FENCE
SEE SHEET C301
CONSTRUCTION LIMITS
TREE PROTECTION FENCE
SEE SHEET C301
EXISTING CONTOUR
EXISTING SANITARY SEWER
EXISTING STORM SEWER
W
S
N
E
NOTE: AVOIDING DAMAGE DURING
CONSTRUCTION
THE SUREST WAY TO PROTECT TREES THAT ARE TO BE SAVED IS
TO:
1. WORK WITH THE BUILDER TO LOCATE AND MARK WITH
FLAGGING AND/OR SIGNS ALL CONSTRUCTION ROADS,
PARKING PLACES FOR WORKERS, AND AREAS FOR STORAGE
OF BUILDING MATERIALS, GRAVEL AND SOIL.
2. WORK WITH THE UTILITY CONTRACTORS TO STAKE OUT THE
EXACT LOCATION OF TRENCHES.
3. ERECT PHYSICAL BARRIERS AROUND ALL "SAVED" TREES
OR, BETTER YET, AROUND GROUPS OF TREES, NEAR THE
CONSTRUCTION ACTIVITY.
4. EXTEND BARRIERS AS FAR AS POSSIBLE BEYOND DRIPLINE.
HIGH VISABILTIY PLASTIC
MESH SNOW FENCE FENCE
(NO SCALE)
TREE PROTECTION DETAIL
BARRIERS THAT EXTEND BEYOND THE DRIPLINE PROTECT
TREES DURING CONSTRUCTION.
EX. GRADE
FENCE POST
HIGH VISABILTIY
PLASTIC MESH
SNOW FENCE
WATER DRIP-LINE
EX. TREE (DRIP-LINE)
PROP. FENCE POST
INLET PROTECTION
1 REVISED TREE PROTECTION FENCING 03/22/2021 MRK1 COIR FIBER LOG DAM,
SEE SHEET C805
2
2
REVISED ADDITIONAL SILT FENCE 04/16/2021 AMQ1 REVISED COIR FIBER LOG DAM 04/16/2021 AMQ1 2
2
3 REVISED LIMITS OF DISTURBANCE/CONST. ENTANRANCE 3 3 04/16/2021 AMQ
06/17/21