Loading...
HomeMy WebLinkAboutC30610 9 a b c d 8 7 6 e f g h10 9 8 7 6 REVISIONS AND ISSUES 5 4 3 2 1 PREPARED FOR:PROJECT NO. SHEET NO.a b c d 5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATE BYe DATE:1 ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil Engi neeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netf hKnow what'sbelow. before you dig.Call R gSection 1, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW200371CARMEL, IN 46033AQW20037103/05/2020BSAQLAWRENCE W. INLOW PARKPHASE II IMPROVEMENTSRUSSELL L. WEBSTER II, PE No. 11900318 03/23/2021RUSSELLL.WEBST ER IIPROFESSIONA L E NGINEE RRE G I S T ER E DINDIA N A PE11900318 STATE OF NO. C306STORM SEWER DETAILSCONCRETE CURB DETAIL 03/22/2021 AMQ1 ADDED SHEET OF STORM SEWER DETAILS 04/21/2021 CMS2 OUTLET CONTROL STRUCTURE 101 (NO SCALE) 1 C306 2'x2' PRECAST CONCRETE STRUCTURE NEENAH R-3402-E, OR APPROVED EQUALPROPOSED GRADING POND BOTTOM CONTRACTOR SHALL CONNECT POND SUBDRAIN TO STRUCTURE. 6"(h) x 12"(w) ORIFICE HOLE ELEV.=751.74 ELEV.=750.91 12" HDPE OUTLET PIPE @ 1.25% w/ CHECKMATE INLINE CHECK VALVE ELEV.=754.00 2'x2' PRECAST CONCRETE STRUCTURE 6"(h) x 12"(w) ORIFICE HOLE 3:1 SLOPE 3:1 SLO P E POND CROSS SECTION (NO SCALE) GRADE AS SHOWN ON PLANS MAINTENANCE _ INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. _ CHECK CHANNEL OUTLET AND ROAD CROSSINGS FOR BLOCKAGE, SEDIMENT, BANK INSTABILITY, AND PIPING OR SCOUR HOLES; REMOVE ANY BLOCKAGE, AND MAKE REPAIRS IMMEDIATELY. _ REMOVE SIGNIFICANT SEDIMENT AND DEBRIS FROM CHANNEL TO MAINTAIN DESIGN CROSS SECTION AND CHANNEL GRADE AND TO PREVENT SPOT EROSION. 6" PERFORATED UNDERDRAIN. INVERT 10" BELOW DRY BASIN SURFACE. SURROUNDED BY #53 STONE. WRAP WITH GEOTEXTILE FABRIC. REFER TO PLANS FOR MORE INFORMATION. SUBGRADE SLOPE VARIES SLOPE VARIES 755.50756.00 756.00 18" DEEP RIPRAP (1/3 CU. FT. MIN. SIZE) 3:1 SLO P E EMERGENCY OVERFLOW 100 YEAR ELEV.=755.05 3:1 SLOPE EMERGENCY SPILLWAY (NO SCALE) 12" HDPE OUTLET PIPE @ 1.25% w/ CHECKMATE INLINE CHECK VALVE 4 C306 MONITORING WELL (NO SCALE) PERMEABLE AGGREGATE RESERVOIR PERFORATED HDPE STORM SEWER MONITORING WELL WITH REMOVABLE CAP 4"MIN. PERFORATED PVC PIPE GRADE 3 C306 2 C306 NATIVE VEGETATION PROTECTION SIGNAGE 2 5 C306 NYLOPLAST DRAIN BASIN (NO SCALE) 6 C306 NYLOPLASE ENVIROHOOD STRUCTURE (NO SCALE) 3 SECTION A-A CONC. PIPE TOE ANCHOR 12" C TO C MAX. SPACING E+2T GROOVED ON OUTLET END, TONGUE END ON INLET END. GROOVE (OR TONGUE) TO BE THE SAME AS ON STANDARD REINFORCED CONCRETE PIPE, ASTM DESIGNATION C-76. CLASS "A" CONCRETE3" 6" NOTE: METAL PIPE END SECTIONS MAY BE USED WITH CONCRETE PIPE, PROVIDING THE METHOD OF CONNECTION IS APPROVED BY THE ENGINEER PRIOR TO INSTALLATION OF PIPE. (EXCEPT IN INDIANAPOLIS)12" C. TO C.MAX. SPA.E9" 6" DIA. CONCRETE IN THESE END SECTIONS SHALL BE THE SAME GRADE AND STRENGTH AS SPECIFIED FOR REINFORCED CONCRETE PIPE, A.S.T.M. DESIGNATION C-76 CLASS III, (AS SET OUT IN INDOT STANDARD SPECIFICATIONS). REINFORCEMENT IN THE "C" PORTION SHALL BE THE SAME AS SPECIFIED FOR REINFORCED CONCRETE, A.S.T.M. DESIGNATION C-76 CLASS III, FOR THE SIZE OF CONNECTING PIPE. REINFORCEMENT IN THE "B" PORTION SHALL HAVE A CROSS SECTIONAL AREA EQUAL TO THAT OF ONE LAYER OF STEEL IN THE "C" PORTION. THE END OF THE PIPE CULVERT SHALL BE PLACED IN THE CONCRETE END SECTION SO THAT THE FLOW LINES ARE FLUSH. THE JOINT SHALL BE COMPLETELY FILLED WITH MORTAR. IN 3:1 OR 4:1 FILL SLOPE, CHANGE TO THE SLOPE OF THE END SECTION IN A SMOOTH, PLEASING TRANSITION APPROXIMATELY 10'-0" IN LENGTH. VARIATIONS IN DIMENSIONS - THE THICKNESS OF THE CONCRETE, THE POSITION OF STEEL, AND THE INTERNAL DIAMETER OF THE PIPE SHALL CONFORM WITH THE VARIATIONS IN DIMENSIONS AS PROVIDED IN THE SPECIFICATIONS FOR REINFORCED CONCRETE CULVERT, STORM DRAIN, AND SEWER PIPE, A.S.T.M. DESIGNATION C-76 WHERE VITRIFIED CLAY CULVERT OR CAST IRON CULVERT PIPE IS USED, A "PIPE END SECTION" COMPARABLE TO THAT AS SHOWN FOR METAL OR CONCRETE SHALL BE FURNISHED AND SHALL BE AS APPROVED BY THE ENGINEER, EXCEPT IN AREAS OF ACID OR MINE WATER THEN THE USE OF METAL END SECTION IS PROHIBITED. END SECTIONS WILL BE PAID FOR AT THE CONTRACT UNIT PRICE EACH FOR "PIPE END SECTION" COMPLETE. CONCRETE PIPE TOE ANCHORS SHALL BE REQUIRED ON ALL CONCRETE PIPE END SECTIONS. THE COST THEREOF SHALL BE INCLUDED IN THE CONTRACT UNIT PRICE PER EACH FOR "PIPE END SECTION." RIP-RAP TO BE PLACED ON SIDE SLOPE WHEN CALLED FOR ON PLANS. END SECTION LENGTH (D)PAY LENGTH OF CULVERT CONCRETE END SECTION PIPE CULVERT HOOK BOLTS LONGITUDINAL SECTION (NO SCALE) 1 1/2"R.1 1/2"R. T TY Y TT4:1 FILL SLOPE 3: 1 FI LL SL O P E CLASS "A" CONC.2'-0" T ADIA - 1'T DIA - 1' TC B=(D-C) D C SLOPE DETAIL PLAN VIEW SECTION Y-Y PRECAST CONCRETE END SECTION DETAIL 2'-0"R2 DIA.R 1 7 C306 8 C306 NYLOPLASE ENVIROHOOD STRUCTURE (NO SCALE) 06/17/21