HomeMy WebLinkAboutC804POST CONNECTION TO BE
DESIGNED AS PART OF THE
ENGINEERED SHOP
DRAWINGS OF PAVILION
BRICK VENEER TO MATCH BUILDING BRICK
VENER (SEE ARCHITECTURAL PLANS)
1/2" STEEL DOWEL @ 24" O.C.
GREASE ONE SIDE
1/2" EXPANSION JOINT TYP.
FILL TOP WITH JOINT SEALANT
TO MATCH CONC. COLOR
#4 REBAR @ 24" O.C.
CAST STONE CAP TO MATCH BUILDING CAST
STONE (SEE ARCHITECTURAL PLANS)
6" X 8" X 16" CMU,
GROUT FILLED CAVITY
HORIZONTAL JOINT REINFORCEMENT;
EVERY OTHER COURSE, TERMINATE @
CONTROL JOINTS
4" CONC PAD W/ 6X6-10X10 WWM
#4 REBAR, CONTINUOUS
#4 REBAR, CONTINUOUS
#4 TRAVERSE REBAR @ 36" O.C.
CONCRETE FOOTING
3,000 MIN. PSI
CONCRETE FOOTING
4,000 MIN. PSI
#4 TRAVERSE REBAR @ 36" O.C.
COMPACTED SUBGRADE
COLUMN DIMENSIONS TO BE CONFIRMED
BY PAVILION MANUFACTURER
10 9 a b c d 8 7 6 e f g h10 9 8 7 6 REVISIONS AND ISSUES 5 4 3 2 1 PREPARED FOR:PROJECT NO.
SHEET NO.a b c d 5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATE BYe DATE:1
ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil Engi neeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netf hKnow what'sbelow.
before you dig.Call
R gSection 1, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW200371CARMEL, IN 46033AQW20037103/05/2020BSAQLAWRENCE W. INLOW PARKPHASE II IMPROVEMENTSRUSSELL L. WEBSTER II, PE No. 11900318
03/23/2021RUSSELLL.WEBST
ER IIPROFESSIONA L E NGINEE RRE G I S T ER
E
DINDIA N A
PE11900318
STATE OF
NO.
C804POLIGON GENERAL DETAILSPOLIGON PAVILION
(NO SCALE)
1
C804
PAVILION COLUMN/FOOTER DETAIL
(NO SCALE)
2
C804
1
1 POLIGON SHADE STRUCTURE DETAILS 03/22/2021 AQ1 06/17/21