HomeMy WebLinkAboutAmerican Structurepoint, Inc./ENG/$117660/16-SW-85; Hamilton County Bridge 603 - Replacement - Westfield Blvd over Carmel Creek - ASA 6 DocuSign Envelope ID:3F7134DD-64D7-4618-9E6C-F127E196348B
American Structurepoint,Inc.
Engineering Department-2021 APPROVED II
Appropriation#2200 44-628.71 2020 Storm Water Bond Fund; P.O. #105300 [APPROVED
yJon ObeNander at 8:56 am,Jun 09,20211
Contract Not To Exceed$117,660.00
ADDITIONAL SERVICES AMENDMENT TO
AGREEMENT FOR PROFESSIONAL SERVICES,
THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ("Agreement") entered into
by and between the City of Carmel and American Structurepoint, Inc. (the "Professional"), as City Contract dated
September 18, 2019 shall amend the terms of the Agreement by adding the additional services to be provided by
Professional consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A". The terms
and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall
remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows:
CITY OF CARMEL, INDIANA American Structurepoint, Inc.
by and through its Board of Public
Works and Safety
By: By: DocuSigned by:
c—DocuSignledd by: (�,,,,Q t j!41,f
It t,S !/r G1l1l.ar� a•FFlgA7OCCC�F2aAA4A7fr"
alittaB1°i11-ard, Presiding Officer Authorized Signature
Date: 6/16/2021
DocuSigned by: Cash E. Canfield
;11tarti Gut, buytt. Printed Name
ary°A°nn8llurke Member
Date: 6/16/2021 Chief Operating Officer
DocuSiigned by: Title
Uwi U34-chiA.
rirSiMalson, Member FID/TIN: 35-1127317
Date: 6/16/2021
Last Four of SSN if Sole Proprietor:
ATTEST: 6/8/2021
DocuSigned by: Date:
S K wo{c
0
e3Wdtfjg, Clerk
Date: 6/16/2021
[S:\Confrac1s\Prof.Svcs&Goods Svcs\Engineenng\2A21\Amencan Sfnumrepoint.Inc.ASA#6.doc:6/8/20213:18 PM]
DocuSign Envelope ID:3F7134DD-64D7-4618-9E6C-F127E196348B
EXI IIB IT"A"
SERVICES BY PROFESSIONAL
A. ENGINEERING PERSONNEL
For the fulfillment of all services outlined in Section B below, the Professional will provide one
full-time Resident Project Representative, inspectors, and clerical and secretarial personnel as
required for a period of time necessary to complete the construction project and final construction
report.
The qualifications and experiences of personnel provided by the Professional are subject to
approval by the City, and no personnel will be assigned to the project until the City's approval is
obtained.
The full-time Resident Project Representative will report to the City on all matters concerning
contract compliance and administration.
The full-time Resident Project Representative will coordinate project activities with City's project
manager.
B. DESCRIPTION OF SERVICES
1. Construction Schedule: Review and monitor the construction schedules prepared by the
Contractor for contract compliance and provide detailed documentation and
recommendations to the City concerning the schedule's acceptability.
2. Conferences: Schedule, conduct, notify participants, and provide minutes of
preconstruction meetings, partnering meetings, progress meetings, and such other job
conferences as required for the timely and acceptable conduct of the job. Attend Public
information Meetings conducted by the City.
The Professional shall be available for conferences as requested by the City to review
working details of the project. The City may review and inspect the activities whenever
desired during the life of the agreement.
3. Liaison: Serve as the City's liaison with the Contractor, working principally through the
Contractor's field superintendent or such other person in authority as designated by the
Contractor. The full-time Resident Project Representative shall be thoroughly familiar
with the plans and specifications applicable to the project to monitor the Contractor for
compliance with the provisions therein. Any deviation observed shall be addressed to the
Contractor by the Resident Project Representative. Recommendations to obtain
compliance also shall be reported to the City.
4. Cooperate: Cooperate with the City in dealing with various federal, state, and local
agencies having jurisdiction over the project.
5. Obtain from the Contractor
a. A list of his proposed suppliers and subcontractors
b. Additional details or information when needed at the job site for proper execution
of the work
EXHIBIT
A (1 of 6) 2021.01413
DocuSign Envelope ID:3F7134DD-64D7-4618-9E6C-F127E196348B
6. Certification of Materials: Check for completeness of certifications of materials delivered
to the site.
7. Shop Drawings
a. Receive shop drawings and falsework drawings. Check falsework drawings for
completeness and obtain structural engineer's approval of the proposed design.
Forward shop drawings to the design consultant for review and approval.
a. Review the approved shop falsework drawings, specifications and other submissions,
record receipt of this data, maintain a file of all drawings and submissions, and check
construction for compliance in accordance with the Contract Documents.
b. Alert the Contractor's Field superintendent when it is observed that materials or
equipment is being or is about to be used or installed before approval of shop
drawings or samples, where such are required, and advise the City when it is
necessary to disapprove work as failing to conform to the Contract Documents.
8. Review of Work, Inspection,and Tests
a. Conduct on-site inspections for the City, of the work in progress, as a basis for
determining that the project is proceeding in accordance with the Contract
Documents
b. Accompany visiting inspectors representing local,state,or federal agencies having
jurisdiction over the project and report details of such inspections to the City
c. Verify that the required quality control sampling and testing has been
accomplished and materials certification has been provided by the Contractor.
Perform compaction testing and concrete testing as required by the contract
documents.
d. Review the Contractor's test/certification results and the City's independent
assurance tests for accuracy and retain in the project file
e. Questionable testing methods or results from the Contractor may initiate an
increase in the volume of assurance tests.
9. Modification: Consider and evaluate the Contractor's suggestions for modifications in
drawings and/or specifications and report them with recommendations to the City.
10. Records
a. Prepare and maintain at the job site orderly files of correspondence, reports of job
conferences, shop drawings and other submissions, reproductions of original
Contract Documents, including all addenda, change orders, and additional
drawings subsequent to the award of the Contract, progress reports, and other
project related documents
b. Keep a diary or logbook, recording hours on the job site, weather conditions, list
of visiting officials,decisions,general observations,and specific observations with
regard to test procedures. Upon request, furnish copies of such a diary or logbook
to the City.
c. Maintain for the City, a record of names, addresses,and telephone numbers of all
subcontractors and major material suppliers
EXHIBIT
2021.01413
A (2 of 6)
DocuSign Envelope ID:3F7134DD-64D7-4618-9E6C-F127E196348B
d. Maintain a set of drawings on which authorized changes are noted and deliver to the
City upon request, but in any event, at the completion of the project
e. Prepare the Final Construction Record and Final Estimate as required by the City
II. Reports: Furnish to the City at periodic intervals, as required, progress reports of the
project, including the Contractor's compliance with the approved construction schedule
12. Progress Estimates: Prepare progress estimates for periodic partial payments to the
Contractor and deliver to the City for review and processing. The payments to the
Contractor will be based on estimates of the value of work performed and materials
complete in place in accordance with the contract.
13. Project Responsibility: The Resident Project Representative will be responsible for the
documentation of pay quantities and estimates and the maintenance of appropriate records
related to the construction of this project.
14. Work Schedule and Suspension: The Professional's crew will be required to regulate their
workweek to conform to the Contractor's hours in accordance with the directions of the
City. If work on the construction project is suspended and all matters concerning contract
compliance and administration are complete, the services of the Professional may also be
suspended without cost to the project.
15. Contract Administration: The Professional will administer the contract in accordance with
City's procedures.
16. If directed by the City, the Professional shall prepare, as needed, design, survey, right-of-
way, and other services consistent with the previous services that have been performed by
the Professional on this project. These services will be performed and paid for based on
an amendment to this agreement to be negotiated between the City and the Professional.
17. If the City requests services beyond the scope of this agreement and capabilities of the
Professional, Professional will prepare an amendment to provide these services through a
subconsultant approved by the City.
INFORMATION AND SERVICES TO BE FURNISHED BY CITY
The City shall furnish the Professional with the following.
1. A City's representative with decision-making authority on all inquiries
2. Assistance to the Professional by placing at its disposal all available information pertinent to
the project
SCHEDULE
1. The Professional will be prepared to begin the services under this Agreement within five (5)
days after a letter of notice to proceed is received from the City. The Professional shall
complete and deliver the final project documents and final estimate to the Project Manager
within sixty(60)days after the project's final acceptance by the City.
2. The assumed duration of the Project is 26 weeks.
EXHIBIT
A (3 of 6) 2021.01413
DocuSign Envelope ID:3F7134DD-64D7-4618-9E6C-F127E196348B
EXHIBIT"A"
INSPECTION FEE JUSTIFICATION
MANHOURS BY CLASSIFICATION
OWNER: City of Carmel
DESCRIPTION: Westfield Boulevard over Carmel Creek Bridge Replacement
Carmel Project No, 16-SW-85
LETTING: February 17,2021
NOTICE TO PROCEED: March 8,2021
EARLY START FOR UTILITY CONSTRUCTION: May 1,2021
EARLIEST DATE FOR ROAD CLOSURE: July 5,2021
SUBSTANTIAL COMPLETION August 6,2021
FINAL COMPLETION DATE: August 27,2021
PRECONSTRUCTION ACTIVITIES: 3/28/2021 to 6/5/2021 = 10.00 weeks
CONSTRUCTION ACTIVMES: 6/6/2021 to 8/28/2021 = 12.00 weeks
POST-CONSTRUCTION ACTIVITIES: 8/29/2021 to 9/25/2021 = 4,00 weeks
26,00 weeks
The following pages(manhour justification and fee estimate)are based on the above construction schedule. Any delay or extension
in the construction that significantly extends the completion dale shown above may require an extension to this Agreement
and an increase in the estimated fees.
EXHIBIT
6/7/2021 A (4 of 6)
DocuSign Envelope ID:3F7134DD-64D7-4618-9E6C-F127E196348B
EXHIBIT"A"
LABOR
PROJECT MANAGER:
Regular time: 12.00 weeks 3 hours/week = 36 hours
PROJECT MANAGER TOTAL HOURS = 36 hours
SENIOR RESIDENT PROJECT REPRESENTATIVE:
Preconstruction Activities:
Regular Time: 10.00 weeks 5 hours/week = 50 hours
Construction Activities:
Regular Time: 12.00 weeks 20 hours/week = 240 hours
Overtime(assume 0%) 240 0% - hours
Post-Construction Activities:
Regular Time: 4.00 weeks 40 hours/week = 160 hours
SENIOR RESIDENT PROJECT REPRESENTATIVE TOTAL REGULAR HOURS = 450 hours
SENIOR RESIDENT PROJECT REPRESENTATIVE TOTAL REGULAR HOURS = - hours
INSPECTOR(S):
Construction Activities: (assume 1 inspector(s)needed):
Regular Time: 12.00 weeks 40 hours/week = 480 hours
Overtime(assume 0%) 480 0% - hours
Post-Construction Activities: (assume 0 inspector(s)needed):
Regular Time: 4.00 weeks - hours/week = - hours
INSPECTOR(S)TOTAL REGULAR HOURS = 480 hours
INSPECTOR(S)TOTAL OVERTIME HOURS = - hours
EXHIBIT
6/7/2021 A (5 of 6)
DocuSign Envelope ID:3F7134DD-64D7-4618-9E6C-F127E196348B
EXHIBIT"A"
INSPECTION FEE SUMMARY
CONSTRUCTION INSPECTION SERVICES
CLIENT: City of Carmel
DESCRIPTION: Westfield Boulevard over Carmel Creek Bridge Replacement
Carmel Project No. 16-SW-85
Rate Units Fee
Project Manager $ 185.00 36 $ 6,660.00
Senior Resident Project Representative $ 140.00 450 $ 63,000.00
Senior Resident Project Representative(Overtime) $ 162.40 - $
Inspector(s)(Regular) $ 100.00 480 $ 48,000.00
Inspector(s)(Overtime) $ 116.00 $ -
TOTAL INSPECTION FEE $ 117,660.00
EXHIBIT
617/2021
A (6 of 6)
DocuSign Envelope ID:3F7134DD-64D7-4618-9E6C-F127E196348B
INDIANA RETAIL TAX EXEMPT Page 1 of 1
C- (A
ity of ari 1 1 el CCERTIFICATE NO.003120155 002 0 PURCHASE ORDER NUMBER
FEDERAL EXCISE TAX EXEMPT 1 05300
ONE CIVIC SQUARE 35-6000972 THIS NUMBER MUST APPEAR ON INVOICES,AP
CARMEL, INDIANA 46032-2584 VOUCHER,DELIVERY MEMO,PACKING SLIPS,
SHIPPING LABELS AND ANY CORRESPONDENCE
FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL- 1997
PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO VENDOR NO I DESCRIPTION
61812021 00360662 16-SW-85 Hamilton Cty Bridge 603-Replacement-Westfield
Blvd over Cannel Creek-Construction Eng
AMERICAN STRUCTURE POINT, INC City Engineering's Office
VENDOR 9025 RIVER RD SHIP 1 Civic Square
TO ,
SUITE 200 Carmel, IN 46032-
INDIANAPOLIS, IN 46240- Laurie Slick
PURCHASE ID BLANKET CONTRACT PAYMENT TERMS FREIGHT
56909 1
QUANTITY I UNIT OF MEASURE DESCRIPTION UNIT PRICE EXTENSION
Department: 2200 Fund: 0 2020 Storm Water Bond
Account: 44-628.71
1 Each 16-SW-85 Hamilton Cty Bridge 603 -Replacement-Westfield $117,660.00 $117,660.00
Blvd over Carmel Creek
Sub Total $117,660.00
/
/
7 '
1 ...
‘4101110p‘)!I'lr0,11 ', '' lit
\
Send Invoice To:
, ,1 , i ,
Jill Newport
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
PLEASE INVOICE IN DUPLICATE
DEPARTMENT r ACCOUNT I PROJECT I PROJECT ACCOUNT AMOUNT 1
PAYMENT $117,660.00
SHIPPING INSTRUCTIONS A/P VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P 0 NUMBER IS MADE A
PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN
'SHIP PREPAID AFFIDAVIT ATTACHED I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN
'O DO SHIPMENT CANNOT BE ACCEPTED THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER,
'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING[ABE
*THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99,ACTS 194 ,.... . - `-'-'7,..---- _
AND AC1S AMENDArORY THEREOF AND SUPPLEMENT THERETO ORDERED BY
Jeremy Kashman James Crider
TITLE Director Director of Administration
CONTROL NO. 1 05300 CONTROLLER