RE: Structural Certification for Installation of Residential Solar
Nina Price:13150 Hazelwood Dr, Carmel, IN 46033
Attn: To Whom It May Concern
Design Criteria
Code 2014 Indiana Building Code (ASCE 7‐10)
Risk category II Wind Load (component and Cladding)
Roof Dead Load Dr 10 psf V(ult) 106 mph
PV Dead Load DPV 3 psf Exposure B
Roof Live Load Lr 20 psf
Ground Snow S 20 psf
If you have any questions on the above, please do not hesitate to call.
Sincerely,
Vincent Mwumvaneza, P.E.
EV Engineering, LLC
projects@evengineersnet.com
http://www.evengineersnet.com
This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of
the PV system to existing roof framing. From the field observation report, the roof is made of Asphalt Shingle
roofing over roof plywood supported by 2X4 Trusses at 24 inches. The slope of the roof was approximated to
be 25 degrees. The maximum allowable chord span is 6 feet between supports.
After review of the field observation data and based on our structural capacity calculation, the existing roof
framing has been determined to be adequate to support the imposed loads without structural upgrades.
Contractor shall verify that existing framing is consistent with the described above before install. Should they
find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity
calculations were done in accordance with applicable building codes.
TESIR
EGE
DR
PRREOE
F NEISGSNIEO NAL
IN ADNAI
No. PE11800488
STATE OF
WUMMVT
AN
NE
EC
ZNIAVDigitally signed by
Vincent Mwumvaneza
Date: 2021.06.14
14:28:52 -04'00'
06/23/21
projects@evengineersnet.com
http://www.evengineersnet.com
276‐220‐0064
Structural Letter for PV Installation
Date: 6/14/2021
Job Address: 13150 Hazelwood Dr
Carmel, IN 46033
Job Name: Nina Price
Job Number: 210614NP
Scope of Work
Table of Content
Sheet
1 Cover
2 Attachment checks
3 Snow and Roof Framing Check
4 Seismic Check and Scope of work
Engineering Calculations Summary
Code 2014 Indiana Building Code (ASCE 7‐10)
Risk category II
Roof Dead Load Dr 10 psf
PV Dead Load DPV 3 psf
Roof Live Load Lr 20 psf
Ground Snow S 20 psf
Wind Load (component and Cladding)
V (Ult) 106 mph
Exposure B
References
2 NDS for Wood Construction
Sincerely,
Vincent Mwumvaneza, P.E.
EV Engineering, LLC
projects@evengineersnet.com
http://www.evengineersnet.com
This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of
the PV system to existing roof framing. All PV mounting equipment shall be designed and installed per
manufacturer's approved installation specifications.
TESIR
EGE
DR
PRREOE
F NEISGSNIEO NAL
IN ADNAI
No. PE11800488
STATE OF
WUMMVT
AN
NE
EC
ZNIAVDigitally signed by
Vincent
Mwumvaneza
Date: 2021.06.14
14:29:07 -04'00'
06/23/21
projects@evengineersnet.com
http://www.evengineersnet.com
276‐220‐0064
Wind Load Cont.
ASCE 7‐10 Table 1.5‐1
106 mph ASCE 7‐10 Figure 26.5‐1A
ASCE 7‐10 Sec 26.7.2
ASCE 7‐10 Sec 26.7.3
ASCE 7‐10 Sec 26.8.2
25.0 Degrees
ASCE 7‐10 Figure 30.5‐1
6.00 ft ASCE 7‐10 Figure 30.5‐1
Uplift (0.6W) Zone 1 (psf) Zone 2 (psf) Zone 3 (psf)
Pnet30= ‐16.8 ‐23.7 ‐37.3 Figure 30.5‐1
Pnet = 0.6 x λ x KZT x Pnet30)= 10.08 14.21 22.40 Equation 30.5‐1
Downpressure (0.6W) Zone 1 (psf) Zone 2 (psf) Zone 3 (psf)
Pnet30= 9.0 9.0 9.0 Figure 30.5‐1
Pnet = 0.6 x λ x KZT x Pnet30)= 5.40 5.40 5.40 Equation 30.5‐1
Rafter Attachments: 0.6D+0.6W (CD=1.6)
Lag Screw Connection
Attachement max. spacing= 4 ft
5/16" Lag Screw Withdrawl Value= 266 lb/in Table 12.2A ‐ NDS
Lag Screw Penetration (Minimum)= 2.5 in DFL assumed
Prying Coefficient 1.4
Allowable Capacity with CD= 760 lb
0.6D+0.6W Dpv+0.6W
Zone Trib Width Area (ft) Uplift (lbs) Down (lbs)
1 4 11.0 91.1 92.4
2 4 11.0 136.5 92.4
3 4 11.0 226.6 92.4
Max= 226.6 < 760
CONNECTION IS OK
Exposure = B
Risk Category = II
Wind Speed (3s gust), V =
Roughness = B
1. Pv seismic dead weight is negligible to result in significant seismic uplift, therefore the wind
uplift governs
2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw.
Embedment in sheading or other material does not count.
Topographic Factor, KZT = 1.00
Pitch =
Adjustment Factor, λ = 1
a =
Where a: 10% of least horizontal dimension or 0.4h, whichever is smaller, but not less than 4% of least
horizontal dimension or 3ft (0.9m)
06/23/21
projects@evengineersnet.com
http://www.evengineersnet.com
276‐220‐0064
Vertical Load Resisting System Design
Roof Framing Trusses
Snow Load Fully Exposed
pg= 20 psf ASCE 7‐10 , Section 7.2 pf = 14 psf
Ce = 0.9 ASCE 7‐10 , Table 7‐2 pfmin. = 20.0 psf
Ct = 1.1 ASCE 7‐10 , Table 7‐3 ps = 20 psf 36.0 plf
Is = 1.0 ASCE 7‐10 , Table 1.5‐1 Conservatively (Cs=0.9)
Max Length, L = 6.0 ft (Beam maximum Allowable Horizontal Span)
Tributary Width, WT = 24 in
Dr = 10 psf 20 plf
PvDL = 3 psf 6 plf
Load Case: DL+0.6W (CD=1.6)
Pnet+ Ppvcos(θ)+PDL= 36.8 plf
Max Moment, Mu = 110 lb‐ft Conservatively
Pv max Shear 92.4 lbs
Max Shear, Vu=wL/2+Pv Point Load = 170 lbs
Load Case: DL+0.75(0.6W+S) (CD=1.6)
0.75(Pnet+Ps)+ Ppvcos(θ)+PDL= 61 plf
Mdown= 182 lb‐ft
Mallowable = Sx x Fb' (wind)= 634 lb‐ft > 182 lb‐ft OK
Load Case: DL+S (CD=1.15)
Ps+ Ppvcos(θ)+PDL= 61 plf
Mdown= 184 lb‐ft
Mallowable = Sx x Fb' (wind)= 456 lb‐ft > 184 lb‐ft OK
Max Shear, Vu=wL/2+Pv Point Load = 184 lbs
Member Capacity
DF‐L No.2
2X4 CL CF Ci Cr KF φλ
Fb = 900 psi 1.0 1.5 1.0 1.15 2.54 0.85 0.8 1553 psi
Fv = 180 psi N/A N/A 1.0 N/A 2.88 0.75 0.8 180 psi
E = 1600000 psi N/A N/A 1.0 N/A N/A N/A N/A 1600000 psi
Emin = 580000 psi N/A N/A 1.0 N/A 1.76 0.85 N/A 580000 psi
Depth, d = 3.5 in
Width, b = 1.5 in
Cross‐Sectonal Area, A = 5.25 in2
Moment of Inertia, Ixx = 5.35938 in4
Section Modulus, Sxx = 3.0625 in3
Allowable Moment, Mall = Fb'Sxx = 396.2 lb‐ft DCR=Mu/Mall = 0.40 < 1 Satisfactory
Allowable Shear, Vall = 2/3Fv'A = 630.0 lb DCR=Vu/Vall = 0.29 < 1 Satisfactory
Design Value Adjusted Value
06/23/21
projects@evengineersnet.com
http://www.evengineersnet.com
276‐220‐0064
Siesmic Loads Check
Roof Dead Load 10 psf
% or Roof with Pv 23.4%
Dpv and Racking 3 psf
Averarage Total Dead Load 10.7 psf
Increase in Dead Load 4.7%OK
Limits of Scope of Work and Liability
The increase in seismic Dead weight as a result of the solar system is less than 10% of the existing structure and
therefore no further seismic analysis is required.
We have based our structural capacity determination on information in pictures and a drawing set titled PV
plans ‐Nina Price. The analysis was according to applicable building codes, professional engineering and design
experience, opinions and judgments. The calculations produced for this dwelling's assessment are only for the
proposed solar panel installation referenced in the stamped plan set and were made according to generally
recognized structural analysis standards and procedures.
06/23/21