Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PP PERMIT PACK 7350 Adam Viebrock Stamped
SHEET INDEX PV1 - COVER SHEET PV2 - PROPERTY PLAN PV3 - SITE PLAN PV4 - EQUIPMENT & ATTACHMENT DETAIL PV5 - ELECTRICAL SINGLE LINE DIAGRAM PV6 - ELECTRICAL CALCULATIONS & ELECTRICAL NOTES PV7 - MAIN BREAKER DERATE CALCS. (IF NEEDED) PV8 - LABELS & LOCATIONS PV9 - CUSTOM DIRECTORY PLACARD (IF NEEDED - NEC 690.56(B)) UTILITY COMPANY: Duke Energy IN PERMIT ISSUER: City of Carmel GENERAL NOTES SITE SPECIFICATIONS CONSTRUCTION - V-B ZONING: RESIDENTIAL SCOPE OF WORK INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM 9.375 kW DC PHOTOVOLTAIC SOLAR ARRAY ROOF TYPE: Comp Shingle MODULES: (25) JinKO Solar Eagle JKM375M-6RL3-B INVERTER(S): Enphase Energy IQ7PLUS-72-2-US,---- RACKING: Unirac SFM Infinity AERIAL VIEW SITE NOTES / OSHA REGULATION 1. A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 3. THE SOLAR PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 4. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SHALL SERVE TO PROTECT THE BUILDING OR STRUCTURE. 5. NO. OF SHINGLE LAYERS : 1 SOLAR CONTRACTOR 1. MODULE CERTIFICATIONS WILL INCLUDE UL1703, IEC61646, IEC61730. 2. IF APPLICABLE, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE MARKED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 3. AS INDICATED BY DESIGN, OTHER NRTL LISTED MODULE GROUNDING DEVICES MAY BE USED IN PLACE OF STANDARD GROUNDING LUGS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. 4. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. 5. CONDUIT POINT OF PENETRATION FROM EXTERIOR TO INTERIOR TO BE INSTALLED AND SEALED WITH A SUITABLE SEALING COMPOUND. 6. DC WIRING LIMITED TO MODULE FOOTPRINT W/ ENPHASE AC SYSTEM. 7. ENPHASE WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 8. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC UNLESS NOT AVAILABLE. 9. ALL INVERTERS, MOTOR GENERATORS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AC PHOTOVOLTAIC MODULES, DC COMBINERS, DC-TO-DC CONVERTERS,SOURCE CIRCUIT COMBINERS, AND CHARGE CONTROLLERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (B). 10. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. 11. TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS (WHEN PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL ELECTRICAL CONNECTIONS. EQUIPMENT LOCATIONS 1. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION [NEC 110.26]. 2. EQUIPMENT INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY [NEC 690.31 (A)] AND [NEC TABLE 310.15 (B)]. 3. ADDITIONAL AC DISCONNECTS SHALL BE PROVIDED WHERE THE INVERTER IS NOT ADJACENT TO THE UTILITY AC DISCONNECT, OR NOT WITHIN SIGHT OF THE UTILITY AC DISCONNECT. 4. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 5. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. DATE DRAWING BY PROJECT NUMBER SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. PV1 COVER SHEET ENPHASE ENERGY 356435 May 13, 2021 0SITE INFORMATION:Adam Viebrock13313 Lorenzo BlvdWestfield, Indiana 46074DC SYSTEM SIZE: 9.375 kW DCCONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM CODES AND STANDARDS 1. ALL WORK SHALL COMPLY WITH 2009 Indiana Electric Code, 2012 INTERNATIONAL BUILDING CODE (IBC), 2018 INTERNATIONAL RESIDENTIAL CODE (IRC), 2006 INTERNATIONAL PLUMBING CODE (IPC), AND ALL STATE AND LOCAL BUILDING, ELECTRICAL, AND PLUMBING CODES. 2. DRAWINGS HAVE BEEN DETAILED ACCORDING TO UL LISTING REQUIREMENTS. DESIGN CRITERIA WIND SPEED: 115 MPH GROUND SNOW LOAD: 20 PSF WIND EXPOSURE FACTOR: C SEISMIC DESIGN CATEGORY: C Sealed For Existing Roof & Attachment Only 5/13/2021 Digitally signed by John A. Calvert Date: 2021.05.13 11:38:42 -06'00' 06/23/21 N DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCACDCACDCACDCAC DCAC DCAC DCAC 8' 16' SCALE: 1/16" = 1'-0" 0' 32'4' LEGEND AC M INVERTER & DC DISCONNECTINV AC DISCONNECT UTILITY METER PV REVENUE METER JB JUNCTION BOX PROPERTY LINE FIRE SETBACK EMT CONDUIT RUN (TO BE DETERMINED IN FIELD) PV WIRE STRING PV SUB (E) SUBPANEL LC (N) LOAD CENTER C COMBINER BOX/AGGREGATOR MSP MAIN SERVICE PANEL TS TRANSFER SWITCH DATE DRAWING BY PROJECT NUMBER SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. PV2 PROPERTY PLAN 0 ENPHASE ENERGY 356435 May 13, 2021SITE INFORMATION:Adam Viebrock13313 Lorenzo BlvdWestfield, Indiana 46074DC SYSTEM SIZE: 9.375 kW DCCONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM ---- FRONT OF HOME 13313 Lorenzo Blvd Sealed For Existing Roof & Attachment Only 5/13/2021 06/23/21 N DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCACDCACDCACDCAC DCAC DCAC DCAC 4' 8' SCALE: 1/8" = 1'-0" 0' 2' 16' LEGEND AC M INVERTER & DC DISCONNECTINV AC DISCONNECT UTILITY METER PV REVENUE METER JB JUNCTION BOX PROPERTY LINE FIRE SETBACK EMT CONDUIT RUN (TO BE DETERMINED IN FIELD) PV WIRE STRING PV SUB (E) SUBPANEL LC (N) LOAD CENTER C COMBINER BOX/AGGREGATOR MSP MAIN SERVICE PANEL TS TRANSFER SWITCH DATE DRAWING BY PROJECT NUMBER SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. ENPHASE ENERGY 356435 May 13, 2021SITE INFORMATION:Adam Viebrock13313 Lorenzo BlvdWestfield, Indiana 46074DC SYSTEM SIZE: 9.375 kW DCCONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED PV3 SITE PLAN 0 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM DC SYSTEM SIZE: 9.375 kW DC MODULE: (JinKO Solar Eagle JKM375M-6RL3-B) INVERTER: Enphase Energy IQ7PLUS-72-2-US FRONT OF HOME UNDERGROUND SERVICE LINE 3' 1'-6" 1'-6" 1'-6" 3' MP1 # OF MODULES: 25 AZIMUTH:151° PITCH:34° TSRF:98% AREA: 837.09 SQ. FT NUMBER OF MODULE: 25 Sealed For Existing Roof & Attachment Only 5/13/2021 06/23/21 MODULE WIDTH H PV4 ARRAY DETAIL, FRONT VIEW Scale: 3/8" = 1'-0" MODULE WIDTH 48" MAX.1'-11" MAX. 34 ° 72" MAX.1'-11" MAX. ARRAY DETAIL, SIDE VIEW Scale: 3/8" = 1'-0" LANDSCAPE PORTRAIT LANDSCAPE PORTRAIT Unirac SFM Infinity TRIM RAILPV MODULE (BEHIND TRIM RAIL) G PV4 Unirac SFM Infinity FRAME SFM Infinity Switchblade Flashkit RACKING ATTACHMENTS TO BE STAGGERED BY SHIFTING EACH SUBSEQUENT ROW OF ATTACHMENTS ONE RAFTER OVER. (E) ROOF MEMBRANE UNIRAC SLIDERS AND TRIMRAIL ROOF ATTACHMENTS PV MODULE (E) BUILDING STRUCTUREDETAIL, BOTTOM STANDOFFScale: 3" = 1'-0"GJinKO Solar Eagle JKM375M-6RL3-B 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER 2.5" Unirac SFM Infinity UNIRAC TRIMRAIL 2.5" MIN. EMBED.FLASHING (E) ROOF MEMBRANE UNIRAC SLIDERS PV MODULE (E) BUILDING STRUCTURE JinKO Solar Eagle JKM375M-6RL3-B 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER 2.5" Unirac SFM Infinity FLASHING DETAIL, MIDDLE/TOP STANDOFFScale: 3" = 1'-0"H2.5" MIN. EMBED. ROOF TYPE: Comp Shingle ROOF FRAMING TYPE: Manufactured Truss RAFTER OR TOP CHORD(TRUSS) 2x4 @ 24"O.C. CEILING JOIST OR BOTTOM CHORD(TRUSS) 2x4 @ 24"O.C. PV ARRAY INFORMATION PV MODULE COUNT: 25 MODULES # OF ATTACHMENT POINTS¹: 44 ARRAY AREA: Module Count x 17.51ft² = 437.8ft² ROOF AREA: 2847.1ft² % OF ARRAY/ROOF: 15.4% ARRAY WEIGHT: Module Count x 50lbs = 1250.0lbs DISTRIBUTED LOAD: Array Weight ÷ Array Area = 2.86 lbs/ft² POINT LOAD: Array Weight ÷ Attachments = 28.4lbs/attachment DATE DRAWING BY PROJECT NUMBER SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. ENPHASE ENERGY 356435 May 13, 2021SITE INFORMATION:Adam Viebrock13313 Lorenzo BlvdWestfield, Indiana 46074DC SYSTEM SIZE: 9.375 kW DCCONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED PV4 EQUIP. DETAIL 0 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM ---- 1 - Number of attachment points estimated and may vary based on on-site conditions as long as maximum attachment spacing followed per engineered plans. Sealed For Existing Roof & Attachment Only 5/13/2021 06/23/21 120/240 VAC 60HZ 1 PHASE TO UTILITY GRID (E) L1 N L2 N G G L2 L1 (N)20A/2P 2 1 L1 L2 G 2 1 JUNCTION BOX L1 L2 G (1) CIRCUIT OF 12 MODULES (N)20A/2P L2 L1 L1 L2 G JUNCTION BOX (OPTIONAL IF UF-B CABLE USED FOR ENTIRE HOMERUN) L1 L2 G 3 G JUNCTION BOX (1) CIRCUIT OF 13 MODULES + -+ -++--++-- + -+ -++--++-- (25) JinKO Solar Eagle JKM375M-6RL3-B UL 1703 COMPLIANT (25) Enphase Energy IQ7PLUS-72-2-US MICRO INVERTERS UL 1741 COMPLIANT 12 MODULES MAX FOR ALL SUB-BRANCH CIRCUIT(S) TO COMPLY WITH VRISE CALCSEnphase IQ Combiner 3 X-IQ-AM1-240-3 (SOLAR LOADS ONLY) (E)100A / 2P (E)LOADS N G N EGC L2 L1 (E)100A / 2P N EGC L2 L1 15 (E) (E)125A MAIN SERVICE PANEL (E)100A / 2P MAIN BREAKER (E) GROUNDING ELECTRODE (S) N G (E)125A SUB PANEL N EGC L2 L1 (E)LOADS (N)40A/2P INTERCONNECTION NOTES 1. ONE OF THE METHODS THAT FOLLOWS SHALL BE USED TO DETERMINE THE RATINGS OF BUSBARS AND PANELBOARDS. (a) THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED THE AMPACITY OF THE BUS BAR. (b) WHERE TWO SOURCES, ONE THE UTILITY AND THE OTHER AN INVERTER ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR [NEC 705.12]. DISCONNECT NOTES 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS) 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH PV AC DISCONNECT NON- FUSED LOCKABLE, VISIBLE OPEN 60A, 240V, 2-POLE (E) SUBPANEL MAIN OCPD LOCATED IN MAIN DISTRIBUTION PANEL TO BE RELOCATED TO OPPOSITE END OF BUSBAR FROM PRIMARY POWER SOURCE. (N) PV SECONDARY POWER SOURCE OCPD TO BE INSTALLED AT OPPOSITE END OF BUSBAR FROM MAIN PRIMARY POWER SOURCE IN (E) SUBPANEL. DATE DRAWING BY PROJECT NUMBER SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. ENPHASE ENERGY 356435 May 13, 2021SITE INFORMATION:Adam Viebrock13313 Lorenzo BlvdWestfield, Indiana 46074DC SYSTEM SIZE: 9.375 kW DCCONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED PV5 ELEC. 3 LINE DIAG. 0 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM 25 INVERTERS x 290.4 W AC = 7.26 kW AC PANEL WATTAGE = 375 W DC Utility Company: Duke Energy IN Permit Issuer: City of Carmel ---- 06/23/21 DATE DRAWING BY PROJECT NUMBER SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. ENPHASE ENERGY 356435 May 13, 2021SITE INFORMATION:Adam Viebrock13313 Lorenzo BlvdWestfield, Indiana 46074DC SYSTEM SIZE: 9.375 kW DCCONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED PV6 ELEC. CALCS. 0 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM GROUNDING NOTES 1. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 690-47] AND [NEC 250-50] THROUGH [NEC 250-60] SHALL BE PROVIDED. PER NEC, GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND BONDED TO AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP. 2. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 AWG COPPER WIRE PER NEC 250-64B. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT PER [NEC 250.64C.]. 3. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND NO GREATER THAN #6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. 4. PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 250.21], [NEC TABLE 250.122], AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC 690.46]. 5. MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC 690.42]. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER MODULE. 7. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTIONS POINTS IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 8. ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION GROUNDING LUGS. 9. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL. 10. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR STRANDED, AND BARE WHEN EXPOSED. 11. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZE ACCORDING TO [NEC 690.45] AND BE A MINIMUM OF #10AWG WHEN NOT EXPOSED TO DAMAGE (#6AWG SHALL BE USED WHEN EXPOSED TO DAMAGE). 12. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLOR CODED GREEN (OR MARKED GREEN IF #4 AWG OR LARGER) 13. ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS. 14. SYSTEM GEC SIZED ACCORDING TO [NEC 690.47], [NEC TABLE 250.66], DC SYSTEM GEC SIZED ACCORDING TO [NEC 250.166], MINIMUM #8AWG WHEN INSULATED, #6AWG WHEN EXPOSED TO DAMAGE. 15. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH 250.134 OR 250.136(A) REGARDLESS OF VOLTAGE. WIRING & CONDUIT NOTES 1. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND APPROVED FOR THE SITE APPLICATIONS 2. BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR) 3. ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT. REDUCING WASHERS DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED 4. UV RESISTANT CABLE TIES(NOT ZIP TIES) USED FOR PERMANENT WIRE MANAGEMENT OFF THE ROOF SURFACE IN ACCORDANCE WITH NEC 110.2,110.3(A-B). 300.4 5. SOLADECK JUNCTION BOXES MOUNTED FLUSH W/ROOF SURFACE TO BE USED FOR WIRE MANAGEMENT AND AS FLASHED ROOF PENETRATIONS FOR INTERIOR CONDUIT RUNS. 6. ALL PV CABLES AND HOMERUN WIRES BE TYPE USE-2, AND SINGLE-CONDUCTOR CABLE LISTED AND IDENTIFIED AS PV WIRE, TYPE TC-ER, OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER BOXES AS REQUIRED 7. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC 690.8] FOR MULTIPLE CONDUCTORS 8. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE INSTALLED AT LEAST 7/8" ABOVE THE ROOF SURFACE AND DERATED ACCORDING TO [NEC TABLE 310.15 (B)(2)(a), NEC TABLE 310.15(B)(3)(a),& NEC 310.15(B)(3)(c)]. 9. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90°C RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT WIRE FROM SHARP EDGES 10. PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN-2 INSULATED, 90°C RATED, WET AND UV RESISTANT, RATED FOR 600V 11. 4-WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS. 12. ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION 13. VOLTAGE DROP LIMITED TO 2% FOR DC CIRCUITS AND 3% FOR AC CIRCUITS 14. NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: DC POSITIVE- RED (OR MARKED RED), DC NEGATIVE- GREY (OR MARKED GREY) 15. POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED: DC POSITIVE- GREY (OR MARKED GREY), DC NEGATIVE- BLACK (OR MARKED BLACK) 16. AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRAL- WHITE/GRAY * USE-2 IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN/THWN-2 AND MAY BE USED INSIDE ** USE-2 IS AVAILABLE AS UV WHITE 17. RIGID CONDUIT, IF INSTALLED, (AND/OR NIPPLES) MUST HAVE A PULL BUSHING TO PROTECT WIRES. 18. IF CONDUIT DETERMINED TO BE RAN THROUGH ATTIC IN FIELD THEN CONDUIT WILL BE EITHER EMT, FMC, OR MC CABLE IF DC CURRENT COMPLYING WITH NEC 690.31, NEC 250.118(10). DISCONNECTING MEANS SHALL COMPLY WITH 690.13 AND 690.15 19. CONDUIT RAN THROUGH ATTIC WILL BE AT LEAST 18" BELOW ROOF SURFACE COMPLYING WITH NEC 230.6(4) AND SECURED NO GREATER THAN 6' APART PER NEC 330.30(B). 06/23/21 DATE DRAWING BY PROJECT NUMBER SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. ENPHASE ENERGY 356435 May 13, 2021SITE INFORMATION:Adam Viebrock13313 Lorenzo BlvdWestfield, Indiana 46074DC SYSTEM SIZE: 9.375 kW DCCONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED PV8 LABELS 0 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM LABEL 1 FOR PV DISCONNECTING MEANS WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(B), NEC 705.22] LABEL 2 AT EACH DC DISCONNECTING MEANS, INCLUDING THE DC DISCONNECT AT THE INVERTER. [NEC 690.53, NEC 690.13(B)] LABEL 3 AT POINT OF INTERCONNECTION, MARKED AT AC DISCONNECTING MEANS. [NEC 690.54, NEC 690.13 (B)] LABEL 4 IF INTERCONNECTING ON THE LOAD SIDE, INSTALL THIS LABEL ANYWHERE THAT IS POWERED BY BOTH THE UTILITY AND THE SOLAR PV SYSTEM: THE MAIN SERVICE PANEL AND SUB-PANELS. [NEC 705.12(B)(3)] LABEL 5 PLACED ADJACENT TO THE BACK-FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(B)(2)(3)(b)] LABEL 6 AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 690.31(G)(3&4)] LABEL 10 (ONLY IF 3 OR MORE SUPPLY SOURCES TO A BUSBAR) SIGN LOCATED AT LOAD CENTER IF IT CONTAINS 3 OR MORE POWER SOURCES. [NEC 705.12(B)(2)(3)(C)] LABEL 9 SIGN LOCATED AT RAPID SHUT DOWN DISCONNECT SWITCH [NEC 690.56(C)(3)]. LABEL 7 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(A)] LABEL 8 FOR PV SYSTEMS THAT ONLY SHUT DOWN CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(B)] LABELING NOTES: 1. LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2. LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI Z535. 3. MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 4. LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED AND SHALL NOT BE HANDWRITTEN[NEC 110.21] 5. LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND; REFLECTIVE, AND PERMANENTLY AFFIXED [IFC 605.11.1.1] LABEL 11 PERMANENT DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT LOCATION IF ALL ELECTRICAL POWER SOURCE DISCONNECTING MEANS (SOLAR ARRAY RAPID SHUTDOWN SWITCH) ARE GROUPED AND IN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS. [NEC 690.56(C) & NEC 705.10]. 2 7 9 5 6 1 1 1 5 6 8 1 *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON PV5 OF 3 LINE DIAGRAM. PV5 LINE DIAGRAM TO REFLECT ACTUAL REPRESENTATION OF PROPOSED SCOPE OF WORK. JUNCTION BOX OR COMBINER BOX MAIN SERVICE PANEL EXISTING SUB PANEL (IF WHERE POINT OF INTERCONNECTION IS MADE) PV COMBINER SUBPANEL - IF USED TO COMBINE PV OUTPUT CIRCUITS AC DC INVERTER (S) INTEGRATED DC DISCONNECT (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) LABELING DIAGRAM FOR STRING INV. / DC OPTIMIZER INV.: AC JUNCTION BOX OR AC COMBINER BOX MAIN SERVICE PANEL AC DISCONNECT (IF REQ. / INSTALLED) EXISTING SUB PANEL (IF WHERE POINT OF INTERCONNECTION IS MADE) PV COMBINER SUBPANEL - IF USED TO COMBINE PV OUTPUT CIRCUITS (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) LABELING DIAGRAM FOR MICRO INV.: 3 4 7 3 5 1 1 1 5 3 4 1 9 11 OR OR PLACARD 11 OR OR PLACARD OR 3 3 AC DISCONNECT (IF REQ. / INSTALLED) IF BREAKER USED IF BREAKER USED 3 4 IF BREAKER USED 3 4 IF BREAKER USED & & & & 10 1 3 4 10 LABEL 12 PERMANENT DIRECTORY TO BE LOCATED AT AC COMBINER PANEL [NEC 110.21(B)] 12 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM The high-powered smart grid-ready Enphase IQ 7 Micro™ and Enphase IQ 7+ Micro™ dramatically simplify the installation process while achieving the highest system efficiency. Part of the Enphase IQ System, the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy™, Enphase IQ Battery™, and the Enphase Enlighten™ monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years. Enphase IQ 7 and IQ 7+ Microinverters To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Microinverters Region: AMERICAS Easy to Install • Lightweight and simple • Faster installation with improved, lighter two-wire cabling • Built-in rapid shutdown compliant (NEC 2014 & 2017) Productive and Reliable • Optimized for high powered 60-cell/120 half-cell and 72- cell/144 half-cell* modules • More than a million hours of testing • Class II double-insulated enclosure • UL listed Smart Grid Ready • Complies with advanced grid support, voltage and frequency ride-through requirements • Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles • Meets CA Rule 21 (UL 1741-SA) * The IQ 7+ Micro is required to support 72-cell/144 half-cell modules.1. No enforced DC/AC ratio. See the compatibility calculator at https://enphase.com/en-us/support/module-compatibility. 2. Nominal voltage range can be extended beyond nominal if required by the utility. 3. Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings, visit enphase.com © 2020 Enphase Energy. All rights reserved. Enphase, the Enphase logo, Enphase IQ 7, Enphase IQ 7+, Enphase IQ Battery, Enphase Enlighten, Enphase IQ Envoy, and other trademarks or service names are the trademarks of Enphase Energy, Inc. Data subject to change. 2020-08-12 INPUT DATA (DC) IQ7-60-2-US IQ7PLUS-72-2-US Commonly used module pairings¹ 235 W - 350 W + 235 W - 440 W + Module compatibility 60-cell/120 half-cell PV modules only 60-cell/120 half-cell and 72- cell/144 half-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V - 37 V 27 V - 45 V Operating range 16 V - 48 V 16 V - 60 V Min/Max start voltage 22 V / 48 V 22 V / 60 V Max DC short circuit current (module Isc) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal (L-L) voltage/range² 240 V / 211-264 V 208 V / 183-229 V 240 V / 211-264 V 208 V / 183-229 V Maximum continuous output current 1.0 A (240 V) 1.15 A (208 V) 1.21 A (240 V) 1.39 A (208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A (L-L) branch circuit³16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 18 mA 18 mA Power factor setting 1.0 1.0 Power factor (adjustable) 0.85 leading ... 0.85 lagging 0.85 leading ... 0.85 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak efficiency 97.6 % 97.6 % 97.5 % 97.3 % CEC weighted efficiency 97.0 % 97.0 % 97.0 % 97.0 % MECHANICAL DATA Ambient temperature range -40ºC to +65ºC Relative humidity range 4% to 100% (condensing) Connector type MC4 (or Amphenol H4 UTX with additional Q-DCC-5 adapter) Dimensions (HxWxD) 212 mm x 175 mm x 30.2 mm (without bracket) Weight 1.08 kg (2.38 lbs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated, corrosion resistant polymeric enclosure Environmental category / UV exposure rating NEMA Type 6 / outdoor FEATURES Communication Power Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer’s instructions. Enphase IQ 7 and IQ 7+ Microinverters 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM The Enphase IQ Combiner 3™ with Enphase IQ Envoy™ consolidates interconnection equipment into a single enclosure and streamlines PV and storage installations by providing a consistent, pre-wired solution for residential applications. It offers up to four 2-pole input circuits and Eaton BR series busbar assembly. Enphase IQ Combiner 3 (X-IQ-AM1-240-3) To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Networking Smart • Includes IQ Envoy for communication and control • Flexible networking supports Wi-Fi, Ethernet, or cellular • Optional AC receptacle available for PLC bridge • Provides production metering and optional consumption monitoring Simple • Reduced size from previous combiner • Centered mounting brackets support single stud mounting • Supports back and side conduit entry • Up to four 2-pole branch circuits for 240 VAC plug-in breakers (not included) • 80 A total PV or storage branch circuits Reliable • Durable NRTL-certified NEMA type 3R enclosure • Five-year limited warranty • UL listed To learn more about Enphase offerings, visit enphase.com © 2018 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ Combiner 3, and other trademarks or service names are the trademarks of Enphase Energy, Inc. 2019-11-04 MODEL NUMBER IQ Combiner 3 X-IQ-AM1-240-3 IQ Combiner 3 with Enphase IQ Envoy™ printed circuit board for integrated revenue grade PV production metering (ANSI C12.20 +/- 0.5%) and optional* consumption monitoring (+/- 2.5%). ACCESSORIES and REPLACEMENT PARTS (not included, order separately) Enphase Mobile Connect™ CELLMODEM-03 (4G/12-year data plan) CELLMODEM-01 (3G/5-year data plan) CELLMODEM-M1 (4G based LTE-M/5-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 microinverters. (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands, where there is adequate cellular service in the installation area.) Consumption Monitoring* CT CT-200-SPLIT Split core current transformers enable whole home consumption metering (+/- 2.5%). * Consumption monitoring is required for Enphase Storage Systems Wireless USB adapter COMMS-KIT-01 Installed at the IQ Envoy. For communications with Enphase Encharge™ storage and Enphase Enpower™ smart switch. Includes USB cable for connection to IQ Envoy or Enphase IQ Combiner™ and allows redundant wireless communication with Encharge and Enpower. Circuit Breakers BRK-10A-2-240 BRK-15A-2-240 BRK-20A-2P-240 Supports Eaton BR210, BR215, BR220, BR230, BR240, BR250, and BR260 circuit breakers. Circuit breaker, 2 pole, 10A, Eaton BR210 Circuit breaker, 2 pole, 15A, Eaton BR215 Circuit breaker, 2 pole, 20A, Eaton BR220 EPLC-01 Power line carrier (communication bridge pair), quantity - one pair XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3 (required for EPLC-01) XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board (PCB) for Combiner 3 ELECTRICAL SPECIFICATIONS Rating Continuous duty System voltage 120/240 VAC, 60 Hz Eaton BR series busbar rating 125 A Max. continuous current rating (output to grid) 65 A Max. fuse/circuit rating (output) 90 A Branch circuits (solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation (DG) breakers only (not included) Max. continuous current rating (input from PV) 64 A Max. total branch circuit breaker rating (input) 80A of distributed generation / 90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy MECHANICAL DATA Dimensions (WxHxD) 49.5 x 37.5 x 16.8 cm (19.5” x 14.75” x 6.63”). Height is 21.06" (53.5 cm with mounting brackets). Weight 7.5 kg (16.5 lbs) Ambient temperature range -40º C to +46º C (-40º to 115º F) Cooling Natural convection, plus heat shield Enclosure environmental rating Outdoor, NRTL-certified, NEMA type 3R, polycarbonate construction Wire sizes • 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors • 60 A breaker branch input: 4 to 1/0 AWG copper conductors • Main lug combined output: 10 to 2/0 AWG copper conductors • Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Altitude To 2000 meters (6,560 feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Ethernet Optional, 802.3, Cat5E (or Cat 6) UTP Ethernet cable (not included) Cellular Optional, CELLMODEM-01 (3G) or CELLMODEM-03 (4G) or CELLMODEM-M1 (4G based LTE-M) (not included) COMPLIANCE Compliance, Combiner UL 1741, CAN/CSA C22.2 No. 107.1, 47 CFR, Part 15, Class B, ICES 003 Production metering: ANSI C12.20 accuracy class 0.5 (PV production) Compliance, IQ Envoy UL 60601-1/CANCSA 22.2 No. 61010-1 Enphase IQ Combiner 3 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM • NYSE-listed since 2010, Bloomberg Tier 1 manufacturer • Best-selling panel globally for last 4 years • Top performance in the strictest 3rd party labs • 99.9% on-time delivery to the installer • Premium solar panel factories in USA and Malaysia EAGLE 66TR G4 370-390 WATT TILING RIBBON MONO MODULE Positive power tolerance of 0~+3% KEY FEATURES BUILDING YOUR TRUST IN SOLAR. JINKOSOLAR.US SOLAR BRAND THE MOST DEPENDABLE TR Technology Tiling Ribbon eliminates cell gaps to increase module efficiency and power. 9BB Half Cell Technology Uniquely designed 9 busbar mono half cut solar cells deliver ultra-high power in a small footprint. Shade Tolerant Twin array design allows continued performance even with shading by trees or debris. Designed for Long Life Uses the same DuPont protective film as the Space Station, Mars Lander, and jetliners. Leading Warranty 12-year product and 25-year linear power warranty; 98% guaranteed first year, max 0.55% annual loss. 25 ENGINEERING DRAWINGS PACKAGING CONFIGURATION TEMPERATURE CHARACTERISTICS MAXIMUM RATINGS MECHANICAL CHARACTERISTICS ELECTRICAL CHARACTERISTICS Cells Monocrystalline No. of Cells 132 (6x22) Dimensions 1855x1029x35mm (73.03×40.51×1.37 in) Weight 21.3 kg (46.96 lbs) Front Glass 3.2mm, Anti-Reflection Coating High Transmission, Low Iron, Tempered Glass Frame Anodized Aluminum Alloy Junction Box IP67 Rated Output Cables 12 AWG, 1825mm (71.85in) or Customized Length Connector MC4 Fire Type Type 1 Pressure Rating 5400Pa (Snow) & 2400Pa (Wind) 2 pallets = 1 stack; 31pcs/pallets, 62pcs/stack, 744pcs/ 40’HQ Container Temperature Coefficients of Pmax -0.35%/°C Temperature Coefficients of Voc -0.28%/°C Temperature Coefficients of Isc 0.048%/°C Nominal Operating Cell Temperature (NOCT) 45 ± 2°C Operating Temperature (°C) -40°C~+85°C Maximum System Voltage 1000VDC Maximum Series Fuse Rating 20A Module Type JKM370M-6RL3-B JKM375M-6RL3-B JKM380M-6RL3-B JKM385M-6RL3-B JKM390M-6RL3-B SCT NOCT SCT NOCT SCT NOCT SCT NOCT SCT NOCT Maximum Power (Pmax) 370Wp 275Wp 375Wp 279Wp 380Wp 283Wp 385Wp 286Wp 390Wp 290Wp Maximum Power Voltage (Vmp) 36.71V 33.49V 36.80V 33.57V 36.90V 33.70V 37.02V 33.90V 37.15V 34.02V Maximum Power Current (Imp) 10.08A 8.22A 10.19A 8.31A 10.30A 8.39A 10.40A 8.45A 10.50A 8.53A Open-circuit Voltage (Voc) 44.02V 41.55V 44.12V 41.64V 44.22V 41.74V 44.34V 41.85V 44.47V 41.97V Short-circuit Current (lsc) 10.90A 8.80A 11.01A 8.89A 11.12A 8.98A 11.22A 9.06A 11.32A 9.14A Module Efficiency STC (%) 19.38% 19.65% 19.91% 20.17% 20.43% ELECTRICAL PERFORMANCE & TEMPERATURE DEPENDENCE BUILDING YOUR TRUST IN SOLAR. JINKOSOLAR.US *STC: Irradiance 1000W/m2 NOCT: Irradiance 800W/m2 *Power measurement tolerance: +/- 3% Cell Temperature 25°C Ambient Temperature 20°C AM = 1.5 AM = 1.5 Wind Speed 1m/s The company reserves the final right for explanation on any of the information presented hereby. JKM370-390M-6RL3-B-D2-US Voltage (V) Temperature Dependence of Isc, Voc, Pmax Current-Voltage & Power-Voltage Curves (400W) Front Side Back Length: +/- 2mm Width: +/- 2mm Height: +/- 1mm Row Pitch: +/- 2mm Cell Temperature (°C) • ISO9001:2008 Quality Standards • ISO14001:2004 Environmental Standards • IEC61215, IEC61730 certified products • UL1703/61730 certified products (pending) • ISO45001:2018 Occupational Health & Safety Standards1855mm (73.03")1029 mm (40.51") A A H 1360mm (53.54")860mm (33.86")979mm (38.54") 5 10 15 20 25 30 35 40 45 500 0 2 4 6 8 10 12 0 70 140 210 350 280 420 -50 -25 0 25 50 75 100 20 40 60 80 100 120 140 160 180 Isc Voc Pmax3535 R4.5 149 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM 304.80mm 12.00in 266.70mm 10.50in 183.97mm 7.24in 41.37mm 1.63in 198.37mm 7.81in 77.09mm 3.04in 24.81mm .98in 86.66mm 3.41in ITEM NO. PART NUMBER DESCRIPTION QTY. 1 JB-1 Body w/ E-Z LOK TECHNOLOGY POLYCARBONATE WITH UV INHIBITORS 1 2 JB-1 Lid w/ Gasket POLYCARBONATE WITH UV INHIBITORS 1 3 4 #8 x 1-1/4” Phillips pan head screw A A B B 4 4 3 3 2 2 1 1 EZ SOLAR DO NOT SCALE DRAWING JB-1 SHEET 1 OF 3 UNLESS OTHERWISE SPECIFIED: SCALE: 1:2 WEIGHT: REVDWG. NO. B SIZE TITLE: NAME DATE COMMENTS: Q.A. MFG APPR. ENG APPR. CHECKED DRAWN FINISH MATERIAL INTERPRET GEOMETRIC TOLERANCING PER: DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL ANGULAR: MACH BEND TWO PLACE DECIMAL THREE PLACE DECIMAL APPLICATION USED ON NEXT ASSY PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF EZ SOLAR. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF <INSERT COMPANY NAME HERE> IS PROHIBITED. !"#$%& '(&)*+*),-*"./ 0&#-*+*),-*".1/ 2&*34- 567'8/ 4 15-20 lbs-in UL Standard 1741, NEMA 3R 1.3 lbs EZ Solar SLC, UT USA Phone (385) 202-4150 www.ezsolarproducts.com 10-32 x 1 Phillips pan head bolt 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM 304.80mm 12.00in 266.70mm 10.50in 6.60mm 0.26in 3.30 2 m m R0. 1 3 in 3.175 mm 0.13i n 170.73mm 6.72in 12.42mm 0.49in 19.81mm 0.78in 175.61mm 6.91in 50.80mm 2.00in 15.88mm 0.625in A A Indent 55.89mm 2.20in 57.94mm 2.28in 57.94mm 2.28in 9.53mm 0.38in 5.55mm 0.22in SECTION A-A SCALE 1 : 1 EZ SOLAR DO NOT SCALE DRAWING JB-1 SHEET 2 OF 3 UNLESS OTHERWISE SPECIFIED: SCALE: 1:2 WEIGHT: REVDWG. NO. B SIZE TITLE: NAME DATE COMMENTS: Q.A. MFG APPR. ENG APPR. CHECKED DRAWN FINISH MATERIAL INTERPRET GEOMETRIC TOLERANCING PER: DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL ANGULAR: MACH BEND TWO PLACE DECIMAL THREE PLACE DECIMAL APPLICATION USED ONNEXT ASSY PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF EZ SOLAR. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF EZ SOLAR IS PROHIBITED. A A B B 4 4 3 3 2 2 1 1 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM 183.97mm 7.24in 198.37mm 7.81in A A 22.23mm .88in 3.18mm .13in SECTION A-A SCALE 1 : 2 LID OVERHANG OUTSIDE INSIDE A A B B 4 4 3 3 2 2 1 1 EZ SOLAR DO NOT SCALE DRAWING JB-1 SHEET 3 OF 3 UNLESS OTHERWISE SPECIFIED: SCALE: 1:2 WEIGHT: REVDWG. NO. B SIZE TITLE: NAME DATE COMMENTS: Q.A. MFG APPR. ENG APPR. CHECKED DRAWN FINISH MATERIAL INTERPRET GEOMETRIC TOLERANCING PER: DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL ANGULAR: MACH BEND TWO PLACE DECIMAL THREE PLACE DECIMAL APPLICATION USED ONNEXT ASSY PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF EZ SOLAR. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF <INSERT COMPANY NAME HERE> IS PROHIBITED. 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM SFM SUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE SYSTEM BONDING & GROUNDING Q E-W BONDING PATH: E-W module to module bonding is accomplished with 2 pre-installed bonding pins which engage on the secure side of the MicrorailTM and splice. TRIMRAIL BONDING PATH: Trimrail to module bonding is accomplished with bonding clamp with integral bonding pin and bonding T-bolt. (refer also to alternate method ) N-S BONDING PATH: N-S module to module bonding is accomplished with bonding clamp with 2 integral bonding pins. (refer also to alternate method ) System bonding is accomplished through modules. System grounding accomplished by attaching a ground lug to any module at a location on the module specified by the module manufacturer. LUG DETAIL & TORQUE INFO Ilsco Lay-In Lug (GBL-4DBT) • 10-32 mounting hardware • Torque = 5 ft-lb • AWG 4-14 - Solid or Stranded LUG DETAIL & TORQUE INFO Ilsco Flange Lug(SGB-4) • 1/4” mounting hardware • Torque = 75 in-lb • AWG 4-14 - Solid or Stranded LUG DETAIL & TORQUE INFO Wiley WEEBLug (6.7) • 1/4” mounting hardware • Torque = 10 ft-lb • AWG 6-14 - Solid or Stranded NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION TERMINAL TORQUE, Install Conductor and torque to the following: 4-6 AWG: 35in-lbs 8 AWG: 25 in-lbs 10-14 AWG: 20 in-lbs TERMINAL TORQUE, Install Conductor and torque to the following: 6-14 AWG: 7ft-lbs TERMINAL TORQUE, Install Conductor and torque to the following: 4-14 AWG: 35in-lbs WEEBLUG Single Use Only Star Washer is Single Use Only Alternate method Alternate method 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM SFM SUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE UL CODE COMPLIANCE NOTES R SYSTEM LEVEL FIRE CLASSIFICATION The system fire class rating requires installation in the manner specified in the SUNFRAME MICRORAIL (SFM) Installation Guide. SFM has been classified to the system level fire portion of UL 1703. This UL 1703 classification has been incorporated into the UL 2703 product certification. SFM has achieved Class A, B & C system level performance for low slope & steep sloped roofs when used in conjunction with type 1 and type 2 modules. Class A, B & C system level fire UL2703 TEST MODULES See page "S" for a list of modules that were electrically and mechanically tested or qualified with the SUNFRAME MICRORAIL (SFM) components outlined within this Installation Guide. • Maximum Area of Module = 22.3 sqft • UL2703 Design Load Ratings: a) Downward Pressure – 113 PSF / 5400 Pa b) Upward Pressure – 50 PSF / 2400 Pa c) Down-Slope Load – 30 PSF / 1400 Pa • Tested Loads: a) Downward Pressure – 170 PSF / 8000 Pa b) Upward Pressure – 75 PSF / 3500 Pa c) Down-Slope Load – 45 PSF / 2100 Pa • Maximum Span = 6ft • Use with a maximum over current protection device OCPD of 30A • System conforms to UL Std 2703, certified to LTR AE-001-2012 • Rated for a design load of 2400 Pa / 5400 Pa with 24 inch span LABEL MARKINGS • System fire class rating: See installation instructions for installation requirements to achieve a specified system fire class rating with Unirac . • Unirac SUNFRAME MICRORAILTM is listed to UL 2703. • All splices within a system are shipped with marking indicating date and location of manufacture. Module Type Roof Slope System Level Fire Rating Microrail Direction Module Orientation Mitigation Required Type 1 and Type 2 Steep Slope & Low Slope Class A, B & C East-West Landscape OR Portrait None Required performance is inherent in the SFM design, and no additional mitigation measures are required. The fire classification rating is valid for any roof pitch. There is no required minimum or maximum height limitation above the roof deck to maintain the Class A, B & C fire rating for SFM. SUNFRAME MICRORAILTM components shall be mounted over a fire resistant roof covering rated for the application. 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM SFM SUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE TESTED / CERTIFIED MODULE LIST S Please see the SFM UL2703Construction Data Report at Unirac.com to ensure the exact solar module selected is approved for use with SFM. SFM Infinity is not compatible with module frame height of less than 32mm and more than 40mm. See page J for further information. Aleo P-Series Astronergy CHSM6612P, CHSM6612P/HV, CHSM6612M, CHSM6612M/HV, CHSM6610M (BL)(BF)/(HF), CHSM72M-HC Auxin AXN6M610T, AXN6P610T, AXN6M612T & AXN6P612T Axitec AXI Power, AXI Premium, AXI Black Premium Boviet BVM6610, BVM6612 BYD P6K & MHK-36 Series Canadian Solar CS6V-M, CS6P-P, CS6K-M, CS5A-M, CS6K-MS, CS6U-P, CS6U-M, CS6X-P, CS6K-MS, CS6K-M, CS6K-P, CS6P-P, CS6P-M, CS3U-P, CS3U-MS, CS3K-P, CS3K-MS, CS1K-MS, CS3K, CS3U, CS3U-MB-AG, CS3K-MB-AG, CS6K, CS6U, CS3L, CS3W, CS1H-MS, CS1U-MS Centrosolar America C-Series & E-Series CertainTeed CT2xxMxx-01, CT2xxPxx-01, CTxxxMxx-02, CTxxxM-03, CTxxxMxx-04, CTxxxHC11-04 Dehui DH-60M Eco Solargy Orion 1000 & Apollo 1000 FreeVolt Mono PERC GCL GCL-P6 & GCL-M6 Series Hansol TD-AN3, TD-AN4, UB-AN1, UD-AN1 Heliene 36M, 60M, 60P, 72M & 72P Series HT Solar HT60-156(M) (NDV) (-F), HT 72-156(M/P) Hyundai KG, MG, TG, RI, RG, TI, MI, HI & KI Series ITEK iT, iT-HE & iT-SE Series Japan Solar JPS-60 & JPS-72 Series Manufacture Module Model / Series JA Solar JAP6 60-xxx, JAM6-60-xxx/SI, JAM6(K)-60/ xxx, JAP6(k)-72-xxx/4BB, JAP72SYY-xxx/ZZ, JAP6(k)-60-xxx/4BB, JAP60SYY-xxx/ZZ, JAM6(k)-72-xxx/ZZ, JAM72SYY-xxx/ZZ, JAM6(k)-60-xxx/ZZ, JAM60SYY-xxx/ZZ. i. YY: 01, 02, 03, 09, 10 ii. ZZ: SC, PR, BP, HiT, IB, MW Jinko JKM & JKMS Series Kyocera KU Series LG Electronics LG xxx S1C-A5, LG xxx N1C-A5, LGxxxQ1C(Q1K)-A5, LGxxxN1C(N1K)-A5, LGxxxS1CA5, LGxxxA1C-A5, LGxxxN2T-A4, LGxxxN2T-A5, LGxxxN2W-A5 LGxxxS2W-A5, LGxxxE1C-A5, LGxxxS2W-G4 LGxxxN1C(N1K)-G4, LGxxxN2W-G4, LGxxxS1C-G4, LGxxxE1K-A5, LGxxxN2T-J5, LGxxxN1K(N1C)-V5, LGxxxQ1C(N2W)-V5, LONGi LR6-60 & LR6-72 Series, LR4-60 & LR4-72 Series Mission Solar Energy MSE Series Mitsubishi MJE & MLE Series Neo Solar Power Co. D6M & D6P Series Panasonic VBHNxxxSA15 & SA16, VBHNxxxSA17 & SA18, VBHNxxxSA17(E/G) & SA18E, VBHNxxxKA01 & KA03 & KA04, VBHNxxxZA01, VBHNxxxZA02, VBHNxxxZA03, VBHNxxxZA04 Peimar SGxxxM (FB/BF) Phono Solar PS-60, PS-72 Q.Cells Plus, Pro, Peak, G3, G4, G5, G6(+), G7, G8(+) Pro, Peak L-G2, L-G4, L-G5, L-G6, L-G7 REC PEAK Energy Series, PEAK Energy BLK2 Series, PEAK Energy 72 Series, TwinPeak 2 Series, TwinPeak 2 BLK2 Series, TwinPeak Series Renesola Vitrus2 Series & 156 Series Risen RSM Series S-Energy SN72 & SN60 Series (40mm) Seraphim SEG-6 & SRP-6 Series Sharp NU-SA & NU-SC Series Silfab SLA, SLG & BC Series Solaria PowerXT SolarWorld Sunmodule Protect, Sunmodule Plus Sonali SS 230 - 265 Suntech STP Suniva MV Series & Optimus Series Sun Edison/Flextronics F-Series, R-Series & FLEX FXS Series SunPower X-Series, E-Series & P-Series Talesun TP572, TP596, TP654, TP660, TP672, Hipor M, Smart Tesla SC, SC B, SC B1, SC B2 Trina PA05, PD05, DD05, DE06, DD06, PE06, PD14, PE14, DD14, DE14, DE15, PE15H Upsolar UP-MxxxP(-B), UP-MxxxM(-B) URE D7MxxxH8A, D7KxxxH8A, D7MxxxH7A Vikram Eldora, Solivo, Somera Waaree AC & Adiya Series Winaico WST & WSP Series Yingli YGE & YLM Series Manufacture Module Model / Series Manufacture Module Model / Series 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM AUTHORIZATION TO MARK Applicant: Manufacturer: Address: Address: Country: Country: Contact: Contact: Phone: Phone: FAX: FAX: Email: Email: Standard(s): Product: Brand Name: Models: This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703: 2015 Ed.1] Photovoltaic Module Racking Systems [CSA LTR AE-001:2012 Ed.2012/10/23] Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2020MAY04 Unirac SFM Unirac Control Number: 5003705 Authorized by: for L. Matthew Snyder, Certification Manager This document supersedes all previous Authorizations to Mark for the noted Report Number. klaus.nicolaedis@unirac.com toddg@unirac.com Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Lake Forest, CA Klaus Nicolaedis Todd Ganshaw 505-462-2190 505-843-1418 NA Unirac, Inc 1411 Broadway Blvd NE Albuquerque, NM 87102 USA This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Page 1 of 2 ATM for Report 102393982LAX-002 ATM Issued: 2-Jun-2020 ED 16.3.15 (20-Apr-17) Mandatory AUTHORIZATION TO MARK Applicant: Manufacturer: Address: Address: Country: Country: Contact: Contact: Phone: Phone: FAX: FAX: Email: Email: Standard(s): Product: Brand Name: Models: This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703: 2015 Ed.1] Photovoltaic Module Racking Systems [CSA LTR AE-001:2012 Ed.2012/10/23] Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2020MAY04 Unirac SFM Unirac Control Number: 5003705 Authorized by: for L. Matthew Snyder, Certification Manager This document supersedes all previous Authorizations to Mark for the noted Report Number. klaus.nicolaedis@unirac.com toddg@unirac.com Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Lake Forest, CA Klaus Nicolaedis Todd Ganshaw 505-462-2190 505-843-1418 NA Unirac, Inc 1411 Broadway Blvd NE Albuquerque, NM 87102 USA This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Page 1 of 2 ATM for Report 102393982LAX-002 ATM Issued: 2-Jun-2020 ED 16.3.15 (20-Apr-17) Mandatory 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM SFM SUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE SYSTEM COMPONENTS C TrimrailTM Flashkit Sub-Components: L-Foot Hex bolt Tri-drive nut Channel Nut Scocket Head Cap Screw 3"Channel/Slider w/grommet 3" Wide Flashing Structural Screw & SS EPDM Washer Functions: • Attach TrimrailTM to roof attachment / flashing • Patented roof sealing technology at roof attachment point Features: • Slot provides vertical adjustments to level array • Slider provides north/south adjustment along the slope of the roof • Shed and Seal Technology TrimrailTM and Module Clips Sub-Components: 1. Trim Rail 2. Module Clip 3. T-Bolt 4. Tri-Drive Nut TrimrailTM Functions: • Required front row structural support (with module clips) • Module mounting • Installation aid • Aesthetic trim Features: • Mounts directly to L-feet • Aligns and captures module leading edge • Supports discrete module thicknesses from 32, 33, 35, 38, and 40mm Module Clips Functions: • Required front row structural support (with trimrail) • Module mounting Features: • Mounts to TrimrailTM with T-bolt and tri-drive nut • Manually adjustable to fit module thicknesses 32, 33, 35, 38, and 40mm. TrimrailTM Splice Sub-Components: 1. Structural Splice Extrusion 2. Bonding Clip Functions: • Front row structural support • Installation aid • Structurally connects 2 pieces of TrimrailTM • Electrically bonds 2 pieces of TrimrailTM Features: • Aligns and connects TrimrailTM pieces • Tool-less installation 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM SFM SUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE SYSTEM COMPONENTS D SFM Slider Flashkit Sub-Components: 1. Slider w/grommet 2. Structural Screw & SS EPDM washer 3. 3" Wide Flashing Functions: • Patented Shed & Seal roof sealing technology at roof attach- ment point • For use with compatible 2" Microrail or 8" Attached Splices Features: • Slider provides north/south adjustment along the slope of the roof • Shed and Seal Technology Wire Bonding Clip w/ 8AWG Functions: • Row to row bonding • Module to TrimrailTM bonding • Single Use Only Features: Tool-less installation MLPE Mounting Assembly Sub-Components: 1. MLPE Mount Base 2. 5/16 Socket Head Cap Screw 3. Bonding Pin Functions: • Securely mounts MLPE to module frames • MLPE to module bonding Features: • Mounts easily to typical module flange • UL2703 Recognized MLPE = Module Level Power Electronics, e.g. microinverter or power optimizer Module-to-Module N-S Bonding Sub-Components: 1. Clamp 2. Bonding Pins (2) 3. 5/16" Socket Head Cap Screw 4. Clamp Base Functions/ Features: • Row to row bonding • Single Use Only • Fits module sizes 32-40mm Trim -to- Module Bonding Clamp and Floating Trim Clamp Sub-Components: 1. Wedge 2. Bonding Pin 3. T-Bolt 4. Nut 5. Cast Base Functions/ Features: • Module to TrimrailTM bonding - single use only • Attaches TrimrailTM to module when fewer than 2 rafter attachment points are available • Fits module sizes 32-40mm • Fits module sizes 32-40mm 06/23/21 SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SS SPEC SHEET 0 CONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM SFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE FLASHING & SLIDERS G PILOT HOLES: Drill pilot holes for lag screws or structural screws (as necessary) at marked attachement points FLASHINGS: Place fl ashings INSTALL SLIDERS AND TRIMRAIL ROOF ATTACHMENTS: • Insert fl ashings per manufacturer instructions NOTE: Use Lag screw or structural fastener with a maximum diameter of 5/16" • Attach sliders to rafters • Verify proper row to row spacing for module size (Mod NS + 1") • Ensure that TrimrailTM roof attachments in each row have suffi cient engagement with slider dovetails for proper attachment. INSTALL SLIDERS AND ROOF ATTACHMENTS: Follow manufacturer instructions for fl ashing installation procedures NOTE: If N-S module edge is within 1” of the shingle course above, you have the option to pivot / rotate slider at the attachment point to span the next course and cut shingles as required. UP-SLOPE DOWN-SLOPE Mod NS + 1" Mod NS + 1" N/S MODULE EDGE Rotate Slider Cut Shingles as Required Less Than 1" 3" 06/23/21