HomeMy WebLinkAboutA211 - Door Schedule & Interior DetailsPLASTIC LAMINATE (PL1)
WALL CABINETS
(SEE CASEWORK NOTE 1)
SINGLE BOWL UNDER-MOUNT
STAINLESS STEEL SINK, ELKAY
DAYTON DXUH2115 (OR EQUAL)
WITH KOHLER K597VS
GOOSENECK FAUCET WITH PULL
DOWN SPRAY (OR EQUAL)
25" DEEP SOLID SURFACE (SS1)
COUNTERTOP
PLASTIC LAMINATE (PL1) BASE
CABINETS (SEE CASEWORK
NOTE 1)
22"W X15"H
MAX.
MICROWAVE
BY TENANT
2'-0"1'-312"1'-5"REFRIG. BY
TENANT
5'-01
2"
(HOLD)
3'-0"
3'-0"
3'-0"
3'-0" 3'-0" 2'-10" 1'-9" 2'-6"WALL TILE (WT1); ALL EXPOSED
EDGES TO RECEIVE SCHLUTER TRIM
STRIP (TR1)
1'-0"
EXIST
4"V.
EXIST
4"W.
2"W.
F.F.
2"W.
2"W.
SINK
TO
BUILDING
DRAIN
F.F.
112"V.
CLG.
112"V.
CLG.
TO EXISTING
STACK
NOTE: REFER TO FLOOR PLAN
AND CASEWORK ELEVATION(S)
FOR SINK LOCATION(S)
F1
3'-0"
3'-4"
2" 2"REFER TO DOOR SCHED. 2" F2
9'-4"
EQ. 2" REFER TO DOOR SCHED.2"2"
38" TEMPERED
GLASS
EQ. EQ.
3'-4"
AT BUTTGLAZE
TRANSITION, PROVIDE
CLEAR POLYMER
STRIPS IN LIEU OF
SILICONE SEALANT.
NO SILICONE
PERMITTEDREFER TO DOOR SCHED.D1
3'-0"1'-0" 8"7" 7"REFER TO DOOR SCHED.3'-0"
D2 D3
14" TEMPERED
GLASS, WOOD
FLUSH BEAD
STAINED TO
MATCH DOOR
3'-0"
SLIDING DOOR
HARDWARE
AS SCHEDULED,
TOP TRACK
36"W x 82"H
DRYWALL
WRAPPED
OPENING
REFER TO DOOR SCHED.DOOR SCHEDULE
#DOOR + FRAME DIMENSIONS DOOR FRAME HARDWARE REM.
01 R1,R3
02
03
04 R3
05
07
08
09
10
11
12 R3
13
14
15 R2
16 R2
17 R2
18 R2
19 R2
DOOR SCHEDULE
INTERIOR DETAILS
A211
TYPICAL ALL SINGLE LOCATIONS,
CASEWORK NOTES
CL CLOSER
CH COAT HOOK
CR CARD READER BY TENANT (N.I.C.)
DB DEADBOLT
DL DUMMY LEVER
EL ELECTROMAGNETIC LOCK (PER IBC 2012)
ES ELECTRIC STRIKE BY TENANT (N.I.C.)
FP FOOT PULL - STEP N PULL HANDS FREE DOOR OPENER SNPE-B
H HOLD OPEN
KP KICK PLATE
KS KICK STOP
OL OFFICE LOCKSET
PH PANIC HARDWARE
PL PRIVACY LOCKSET
PP PUSH/PULL- PROVIDE ONE POST MOUNT PULL ON EACH SIDE OF
DOOR (TOTAL COUNT 2), ROCKWOOD #RM3302, 628 CLEAR
ANODIZED FINISH.
PS PASSAGE LATCHSET
PV PIVOT HINGE
RL ROLLER LATCHES
SL STOREROOM LOCKSET
TS TOP STRIKES
HARDWARE LEGEND
DESCRIPTIONDATE
ISSUE
04.01.21 REVIEW SET
04.07.21 PERMIT SET
04.08.21 CONSTRUCTION SET
REVISIONS
DESCRIPTIONMARK DATE DB
04.12.21 JR A121 REV
04.26.21 JR A131 REV
05.10.21 JR REVISIONS
2
3
THIS DRAWING, AND THE IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF SCHOTT DESIGN.450 E. 96th StreetIndianapolis, IN 46240p: 317.387.1700PROJECT NUMBER
DRAWN BYPROJ. MGR PSI SERVICES11590 MERIDIAN CROSSING | SUITE 220CARMEL, IN 46032JRACM
2020.313
2ND FLOOR
1
DOOR/FRAME TYPES
0 2'4'1'
ELEVATION - BREAK 107
A211
2
NOT TO SCALE
RISER DIAGRAM
A211
1
R1. FINISH TENANT SIDE OF DOOR AND FRAME TO MATCH SUITE
STANDARD STAIN COLOR. FINISH CORRIDOR SIDE OF DOOR AND
FRAME TO MATCH BUILDING STANDARD STAIN COLOR IN PUBLIC
CORRIDORS.
R2. PROVIDE 36" W X 82"H DRYWALL OPENING WITH WALL MOUNTED
HARDWARE REQUIRED FOR SLIDING "BARN" DOOR ASSEMBLY.
PROVIDE HAGER ECONESTOGA9457-72 BARN DOOR HARDWARE WITH
BURNS 2524A 8" PULL SET, FLAT BLACK FINISH. PROVIDE BOTTOM
CATCH AND STOP AS REQUIRED. CONTRACTOR TO PROVIDE CUT
SHEETS FOR TENANT APPROVAL PRIOR TO ORDERING. DESIGN INTENT
IS FOR MOUNTING HARDWARE TO BE ABOVE DOOR OPENING AND
DOOR TO EXTEND TO FLOOR. ENSURE THAT CLEAR OPENING IS
MINIMUM OF 34" WHEN DOOR IS FULLY OPEN. CONTRACTOR TO
WORK WITH SDI TO ENSURE THIS INTENT IS MET.
R3. PROVIDE SEPARATE PRICE FOR FULL FLUSH BEAD LIGHT KIT AT. DESIGN
INTENT IS FOR DOOR TO MATCH DOOR STYLE "D2."
REMARKS
DOOR/FRAME NOTES
1. REUSE DOORS FROM DECONSTRUCTION WHERE POSSIBLE; TOUCH UP
EXISTING DOOR STAIN AS REQUIRED. PROVIDE NEW BUILDING STANDARD
DOORS MATCHING EXISTING VENEER AS REQUIRED. STAIN NEW DOORS TO
MATCH EXISTING. PRE-MACHINE NEW DOORS FOR CYLINDRICAL
LOCKSETS.
2. PROVIDE NEW HARDWARE TO MATCH EXISTING ON NEW DOORS. REUSE
EXISTING HARDWARE ON EXISTING DOORS WHERE POSSIBLE. FOR NEW
DOOR HARDWARE, PROVIDE GRADE 2 MINIMUM BUILDING STANDARD.
PROVIDE ADA ACCESSIBLE LEVER HANDLES ON NEW LOCK AND
LATCHSETS.
3. PROVIDE NEW BUILDING STANDARD FRAMES AS REQUIRED. REUSE
EXISTING FROM DEMOLITION WHERE POSSIBLE. IF FRAMES ARE NOT BEING
REPAINTED, TOUCH UP EXISTING FRAMES TO BE REUSED.
4. FRAME ALL DOOR ROUGH OPENINGS 4" FROM ADJACENT WALL
CORNERS UNLESS OTHERWISE NOTED ON PLAN.
5. REFER TO TENANT AND LANDLORD FOR KEYING REQUIREMENTS AND
LOCKSETS.
6. TENANT'S SECURITY VENDOR IS RESPONSIBLE FOR THE SPECIFICATION,
PURCHASE, AND INSTALLATION OF ALL ACCESS CONTROLLED
ELECTRONIC AND/OR MAGNETIC HARDWARE AND ASSOCIATED DEVICES.
ALL SPECIFICATIONS AND INSTALLATIONS MUST COMPLY WITH THE
INDIANA BUILDING CODE, CHAPTER 10, MEANS OF EGRESS.
7. PROVIDE BUTT HINGES ON ALL DOORS AS FOLLOWS:
x 7'-0" HT. TO HAVE 3 HINGES
x GREATER THAN 7'-0" IN HT. TO HAVE 4 HINGES
x FINISH TO MATCH HARDWARE SET
8. PROVIDE (1) SET OF SILENCERS ON ALL DOOR FRAMES UNLESS OTHERWISE
NOTED.
9. PROVIDE WALL STOP (FLOOR STOP WHERE APPLICABLE) AT EACH DOOR
UNLESS OTHERWISE NOTED. PROVIDE BLOCKING BEHIND WALL STOP.
TYPE MATERIAL FINISH TYPE MATERIAL FINISH
-- -- -- PT6 -- -- PT5 CR, ES, SL, CL
-- D1 -- F1 TIMELY CR, ES, SL, CL
3'-0"x7'-0"x134" D1 MDO
CR, ES, SL, CL
EXISTING
NEW
SWING
--
RH
LH
3'-0"x7'-0"x134" D1 MDO PT7 F1 TIMELY RH
PSRELOCATED -- D1 -- F2 TIMELYRH
OL
GENERAL NOTE: CONTRACTOR TO CONFIRM THAT SINKS NOTED IN
ELEVATIONS PROPERLY COORDINATE WITH WIDTH AND DEPTH OF
BASE CABINET PRIOR TO ORDERING.
1. PROVIDE AWI CUSTOM GRADE, FLUSH-OVERLAY CABINETS.
FABRICATE WITH PLASTIC LAMINATE COVERED MDO BOARD AS
NOTED IN ELEVATIONS. COORDINATE QUANTITIES IN ELEVATIONS.
- WHERE 24"D COUNTERTOPS ARE NOTED ON ELEVATIONS,
PROVIDE 23"D BASE CABINETS; WHERE 25"D COUNTERTOPS ARE
NOTED ON ELEVATIONS, PROVIDE 24"D BASE CABINETS
- ALL UPPER CABINETS TO BE 12"D, UNLESS NOTED OTHERWISE
- 4" BASE AT CABINETS TO BE VINYL BASE AS SPECIFIED
- PULLS: MOCKETT DP3B-4 PULLS, FINISH: SATIN CHROME
RELOCATED
NEW
RELOCATED
RELOCATED
RELOCATED
RELOCATED
NEW
RELOCATED
NEW
NEW
NEW
NEW
NEW
NEW
NEW
--
--
--
--
3'-0"x7'-0"x134"
--
3'-0"x7'-0"x134"
3'-0"x7'-0"x134"
3'-0"x7'-0"x134"
3'-0"x7'-0"x134"
3'-0"x7'-0"x134"
3'-0"x7'-0"x134"
3'-0"x7'-0"x134"
LH
LH
RH
LH
LH
--
--
--
--
--
RH
RH
RH
D1
D1
D1
D1
D1
D1
D1
D1
D3
D3
D3
D3
D3
PT7
MDO PT7
--
MDO PT7
MDO PT7
MDO PT7
MDO PT7
MDO PT7
MDO PT7
MDO PT7
--
--
--
--
F1 TIMELY
F1 TIMELY
F1 TIMELY
F1 TIMELY
F1 TIMELY
F1 TIMELY
F2 TIMELY
F1 TIMELY
F1 TIMELY
DRYWALL WRAPPED OPENING
PT5
PT5
PT5
PT5
PT5
PT5
PT5
PT5
PT5
PT5
PT5
PT5
PS
PS
PS
PS
PS
PS
PS
PS
SEE REMARK
SEE REMARK
SEE REMARK
SEE REMARK
SEE REMARK
DRYWALL WRAPPED OPENING
DRYWALL WRAPPED OPENING
DRYWALL WRAPPED OPENING
DRYWALL WRAPPED OPENING
3
3
3
PT6
PT6
PT6
PT6
PT6
PT6
PT6
06/23/21