Loading...
HomeMy WebLinkAboutS009VALID FOR 1 PERMIT ONLY U.N.O.REMARKS DRWNCHKD DATESCALE: COPYRIGHT ENGINEERING EXPRESS®C:\Users\eric\Engineering Express\Production - Documents\Projects\20-25436 Aluminum Louvered Roof\WP\20-25436j Louvered Roof MPS (IBC).dwg07/30/2020 - 9:01am eric -- - - -- - - 7/22/20RWN EPR 05/11/20RWN EPR 2018 IBC UPDATE 08/24/18TSB RWN INIT ISSUE (AS 18-5654) POST TYPE DESIGN PRESSURE (UPLIFT) UPLIFT PER FOOTER MID 16 psf 2560 lb 18 psf 2880 lb 20 psf 3200 lb 25 psf 4000 lb 30 psf 4800 lb CORNER 16 psf 1280 lb 18 psf 1440 lb 20 psf 1600 lb 25 psf 2000 lb 30 psf 2400 lb POST TYPE DESIGN PRESSURE (UPLIFT) UPLIFT PER FOOTER MID 16 psf 3072 lb 18 psf 3456 lb 20 psf 3840 lb 25 psf 4800 lb 30 psf 5760 lb CORNER 16 psf 1536 lb 18 psf 1728 lb 20 psf 1920 lb 25 psf 2400 lb 30 psf 2880 lb PHOTOCOPIES NOT TO BE USED FOOTER SCHEDULE FOOTER SCHEDULE NOTES: 1.FOOTERS SHALL BE 3000 PSI MINIMUM CONCRETE, BEARING ON SOIL WITH A MINIMUM BEARING CAPACITY OF 2000 PSF AS VERIFIED BY OTHERS. 2.IN LIEU OF THE FOOTERS DETAILED HEREIN, POSTS MAY BE ANCHORED TO EXISTING CONCRETE SLABS DESIGNED AND VERIFIED BY OTHERS TO SUPPORT THE CANOPY SYSTEM AS DETAILED HEREIN. 3.FOOTERS SHALL HAVE THE MINIMUM REINFORCEMENT INDICATED IN THE FOOTER REINFORCEMENT DETAIL. 4.THESE SCHEDULES PROVIDE ONLY THE REQUIRED FOOTER SIZES, BEAM SPANS AND PURLIN SPANS SHALL NOT EXCEED THE MAXIMUM ALLOWABLE SPANS NOTED IN THEIR RESPECTIVE DESIGN SCHEDULES. 5.ALL REINFORCEMENT SHALL BE DEFORMED BARS OF INTERMEDIATE GRADE NEW BILLET STEEL CONFORMING TO CURRENT REQUIREMENTS OF ASTM A615, GRADE 60 (U.O.N.), FREE FROM OIL, LOOSE SCALE AND LOOSE RUST AND BENT, LAPPED, PLACED, SUPPORTED AND FASTENED ACCORDING TO THE "ACI DETAILING MANUAL" (SP-66) AND THE "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" (ACI 318). 6.MINIMUM REINFORCING STEEL CLEAR COVERAGE SHALL BE AS FOLLOWS. (PER ACI 318) 6.1. FOOTING: TOP, SIDES, BOTTOM = 1 12" MIN. INSTALLED ON A SMOOTH LEVEL SURFACES ONLY. MAINTAIN 3" IF NOT IN SMOOTHFORM. 7.ALLOW 3 DAYS CURE TIME BEFORE INSTALLING ANCHORS INTO CONCRETE. 8.ALL CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS AND RECOMMENDATIONS OF ACI 318 "SPECIFICATION FOR STRUCTURAL CONCRETE FOR BUILDINGS". CONCRETE HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000PSI AT 28 DAYS. A CERTIFICATE OF MANUFACTURER'S MIX AND STRENGTH IS TO BE PROVIDED TO THE INSPECTOR UPON REQUEST. NO WATER TO BE ADDED AFTER TRUCK LEAVES PLANT WITHOUT APPROVAL OF ENGINEER OR PLANT ENGINEER. PLANT CONTROL IS REQUIRED. MAXIMUM MIX TIME AT POINT OF DEPOSIT IS 90 MINUTES. 9.THESE TABLES REPRESENT EMPIRICAL UPLIFT CALCULATIONS FOR FOOTING SIZES BASED ON STANDARD WEIGHT (150PCF) CONCRETE. THEY NEGLECT THE BENEFIT OF SKIN FRICTION AND OTHER BENEFICIAL SURCHARGE LOADING. NO WARRANTY, EXPRESSED OR IMPLIED, IS CONTAINED HEREIN AS TO ANY INFORMATION OTHER THAN THAT WHICH IS PUBLISHED HEREIN. FOR ADDITIONAL FOOTING OPTIONS: SINGLE BEAM: DOUBLE BEAM: NOTE: UPLIFT PER FOOTER FORCES SHOWN ABOVE INCLUDE A 50% REDUCTION IN TOTAL FORCE TO ACCOUNT FOR LOUVER SURFACE AREA EXPOSED TO WIND WHEN IN THE FULLY OPENED POSITION. TO UTILIZE THESE VALUES, LOUVERS SHALL BE FULLY OPENED BEFORE ANY NAMED STORM OR SIMILAR HIGH-WIND EVENT. IF NOT, THE UPLIFT PER FOOTER FORCES SHOWN ABOVE SHALL BE DOUBLED BEFORE USE.18" TYP.DEPTH PERDESIGN SCHEDULE3KSI CONCRETE FOOTING PER FOOTING SCHEDULE. POST MAY BE EMBEDDED DIRECTLY INTO CONCRETE AS AN ALTERNATIVE TO SURFACE MOUTNING. PROVIDE 18" EMBEDMENT & A KEY HOLE FOR 1#5 REBAR 12" LONG, TYP. POST, TYP. WIDTH PER DESIGN SCHEDULE POST EMBED DETAIL NTS ELEVATION SEE PAD FOOTING DIMENSIONS H, I, J ALUMINUM COLUMN & CONNECTION PER SEPARATE DETAIL. PLACE OVER MIDDLE 13 OF FOOTING CLOSEST TO CENTER SEE PAD FOOTING DIMENSIONS H, I, J PAVERS TO BE OVERLAID AFTER PLACEMENT OF POST (IF APPLICABLE) PAD FOOTING DESIGNATIONS H, I, J DIMENSIONS: 24" X 24" X 16" DEEP HORIZONTAL STEEL: (2) #5 BARS EACH WAY T & B VERTICAL STEEL: (4) #3 STIRRUPS DIMENSIONS: 36" X 36" X 24" DEEP HORIZONTAL STEEL: (3) #5 BARS EACH WAY T & B VERTICAL STEEL: (6) #3 STIRRUPS DIMENSIONS: 40" X 40" X 36" DEEP HORIZONTAL STEEL: (4) #5 BARS EACH WAY T & B VERTICAL STEEL: (8)#3 VERTICAL STIRRUPS H I J SEE REINFORCING STEEL REQUIREMENTS BELOW VOLUME, CUFT NOTE: SIMILAR EQUIVALENT FOOTING SIZES MAY BE USED PROVIDED CUFT, ACI STEEL PLACEMENT, & FOOTING DEPTHS ARE AS SPECIFIED/FOLLOWED & FROST DEPTH IS MET. TOP OF FOOTINGS SHALL BE AT GRADE OR BELOW 5.33 18.00 33.33 HOST STRUCTURE COLUMN SPACING A COLUMN SPACING B TRIB SPAN3= 1/2(B) TRIB. SPAN1= 1/2(A) TRIB. SPAN2= 1/2(A+B) CONCRETE PAD PER TABLE REQUIRED UNDER ALL COLUMNS ROOF SPAN(SOIL, PAVERS, OR OTHER SURFACE) PAD FOOTING LAYOUT / DETAILS (VALUES ARE TO OVERHANG) THIS OPTION TYPICALLY USED FOR OPEN STRUCTURES TABLE 1: FOOTING ALLOWABLE UPLIFT FOOTING TYPE ALLOWABLE UPLIFT FOR AVERAGE ON-CENTER COLUMN SPACING, LB (SEE CALCULATIONS ON THIS PAGE) UPLIFT PER FOOTER H I J PAD PAD 479 1619 2999 PAD VISIT ECALC.IO/FOOTING FOR ENGINEER-CERTIFIED ORIGINALS, HELPFUL TOOLS & RESOURCES & SITE-SPECIFIC ORDERING VISIT ENGINEERINGEXPRESS.COM/STORE FOR MORE MANUFACTURER MASTER PLANS TO USE WITH THIS DOCUMENT THIS DOCUMENT IS ONLY VALID WITH ORIGINAL ENGINEER CERTIFICATION 1.F.S. AGAINST UPLIFT OF 1.67 HAS BEEN APPLIED TO ALL LOADS. 2.TABLES CAN ALSO BE USED WITH INTERMEDIATE CARRY BEAM. USE TOTAL ROOF SPAN WHEN SOLVING FOR INTERMEDIATE FOOTING & SPAN FROM CARRY BEAM TO END OF ENCLOSURE FOR OUTER FOOTING. 3.AT 2000PSF SOIL BEARING PRESSURE, GRAVITY DOES NOT GOVERN IN ANY CASE. ENSURE PROPER COMPACTION & EMBEDMENT FOR FROST & HEAVE REQUIREMENTS. SITE SPECIFIC ENGINEERING REQUIRED FOR ANY VALUES, SIZES, CONCRETE TYPES, OR SOIL BEARING PRESSURES NOT COINCIDING WITH LIMITS OF CORRESPONDING MASTER PLAN SHEETS AND THIS MASTER PLAN. TABLE 1 DESIGN NOTES SEE DETAILS ON THIS PAGE POST BASE ATTACHMENT - FOOTER OPTION 05/04/2021 06/29/21