Loading...
ElevationsDIMENSIONAL FIBERGLASS SHINGLES W/ 154 FELT OVER 1/2" EXT. SHEATHING 4" x 12" ALUM. 12 () 2x4 BUILD-UP SOFFIT VENTS SEE PLANS 0DETERMINED BY ® 8'-0" O.C. ROOF PITCH 2x4 2x2 6" PREFINISHED ALUM. GUTTER (SLOPE TO DRAIN) I/2" GYP. BOARD W/ ASPHALT 12" OHTEXTURED FINISH e� I 1 SHINGLES .. IX6 FASCIA BOARD 8n2 BLOWN -IN INSULATION IX6 GUTTER BOARD (R-38) IX6 FRIEZE BOARD HARDI-BOARD 12° OVERHANG 9'-I I/8" 2ND FLOOR PLATE HEIGHT PERFORATED SOFFIT (2) 2X4 TOP PLATE _ T STUD WALL TYP. 1/2" GYP. BOARD 6 -Ir wlNDow HEADER HEIGHT IX6 FRIEZE BOARD (2) 2XI2 WINDOW HEADER WINDOW LAP SIDING 2X4 STUDS AT 16" O.C. ED GATT. INSUL. (R-19) ASPHALT 4 MILSHINGLES 1� . VAPOR BARRIER 3 I/2" EXT. HIGH °R" 8/12 SECOND FLOOR HEIGHT INSUL. SHEATHING 3/4DECKING " PLYWOOD FLR II 1/8' TJI JOISTS 9'-I 1/8" IST FLOOR PLATE HEIGHT TJI JOIST AT 14" O.C. Ix12 POPLAR SKIRTBOARDS Oo 8" WINDOW HEADER HEIGHT 2x12 WOOD STRINGERS �Oo SIDING 2x12 RIM JST. (2) 2X4 TOP PLATE 1 I/8" PARTIAL BOARD ❑ I/2" EXT. HIGH "R" 2X4 STUDS AT 16" O.C. TREAD CAPS o�0 OQ INSUL SHEATHING 4 11T. VAPOR BARRIER �10" TREAD Ll �-j �o�] 0 I" NOSING B 0'-0' FIRST FLOOR HEIGHT LAP SIDING <o oho 0 0 _ o e o 0 � a � � -� � O p o II l/8° TJI JOISTS TOP OF FOUNDATION WALL (2) 2x4 DOOR T-6• WINDOW HEADER HEIGHT GATT. INSUL. (R-I9) HEADER ® 6'-8" A.F.F. _ LEFT ELEVATION R I G H T ELEVATION 1/2" GYP. BOARD WOOD DOOR IX6 TRIM BOARD I/2" GYP. BOARD 2X4 BOTTOM PLATE SCALE: /8"4-0" SCALE: /8"-1'-0" � / BRICK SILL 3/4" PLYWOOD FLR. 2x12 RIM JST. DECKING I/2" DRYWALL�- 9'-lo 1/8" BASEMENT SLAB TJI JOIST AT 19" O.C. Ix12 POPLAR SKIRTBOARDS MASONRY STONE W/ 2x12 WOOD STRINGERS I" AIR SPACE 2x4 TREATED TOP 1 I/8" PARTIAL BOARD PLATE ANCHOR BOLT TREAD CAPS �10" TREAD g 2 - - BATT. INSUL. f R-ID I" NOSING 8/12 I/2 GYP. BOARDcl 9'-0" X 8" CONTINUOUS (2) 2x4 DOOR = CONC. WALL ac HEADER D C-8" A.F.F. WOOD DOOR 2x4 STUDS El C O.C. ------ ------ -- - - - - - - - - - WATER PROOFING -1/2" GYP. BOARD 2x4 TREATED PLATE PEA FILL 4" CONC SLAB OVER 4" CONC SLAB COMPACTED FILL I/T DRYWALL 7777 6" PERFORATED ..... ASPHALT DRAIN 6" DRAIN TILE SHINGLES HOOKED TO SUMP PUMP T T en2 21" X 8" CONTINUOUS T-I I/8' 2ND FLOOR PLATE HEIGHT I O FOOTING 6'-II" WINDOW HEADER HEIGHT (� / 2 8 / 12 &4 L L F r T I O N ASPHALT SHINGLES � 'A_n1 L: I/ -I -I V 1'1 3AIN'Ra03,T� IIralII 1)1­r-ILL: I/ V -I \/ FRONT ELEVATION SCALE: 1/4=1-0 SECOND FLOOR HEIGHT 1-8° WINDOW HEADER HEIGHT 0'-0• FIRST FLOOR HEIGHT T-6° WINDOW HEADER HEIGHT - 9'-10 1/8' BASEMENT SLAB 9'-1 1/8" 2ND FLOOR PLATE HEIGHT C-II" WINUUW HEAUEK HEIUH I �Cr r1AIn GI /)/)D ul=1r-uT 1-1 1/0 11) 1 r1-VVK t l-A I C 1-it:iu-f I T-8" WINDOW HEADER HEIGHT IX6 CORNER BOARD I" REVEAL SOLDIER COURSE n'-n° E12ST PI nnP 1-11=Ir.WT II 1/0 111 JV10 10 TOP OF FOUNDATION WALL I. VERIFY ALL TYPES AND SIZES OF WINDOW UNITS AND DOORS WITH BUILDER. NOTIFY BUILDER OF ANY DISCREPANCIES. 2. VERIFY LOCATIONS, TYPES AND SIZES OF VENTS AND EXTERIOR TRIM WITH BUILDER. 3. ALL ROOF, CHIMNEY AND WALL INTERSECTIONS SHALL BE FLASHED WITH ALUMINUM OR BETTER MATERIAL. SQUARE FOOTAGE TABLE FOUNDATION TOTAL SQUARE FOOTAGE =INISHED SQUARE FOOTAGE '1ECH./STORAGE SQUARE FOOTAGE ::RAWL SPACE FIRST FLOOR =INISHED SQUARE FOOTAGE :aARAGE SQUARE FOOTAGE 3ACK PORCH SQUARE FOOTAGE =RONT PORCH SQUARE FOOTAGE SECOND FLOOR 1661 IF 1382 IF 279 IF 0 IF 1710 IF 1112 IF 328 IF 249 IF =INISHED SQUARE FOOTAGE 820 SF JNFINISHED SQUARE FOOTAGE 0 SF TOTAL FINISH SQ. FT. 3912 SF TOTAL SQUARE FOOTAGE 4191 SF **NOTE** IT IS THE BUILDER/ OWNERS RESPONSIBILITY TO VERIFY THE PROPER AIR SPACE BETWEEN ALL BRICK AND WOOD WALLS WITH HOUSE WRAP, TO PREVENT WATER INFILTRATION. BUILDER/ OWNER SHOULD SEEK THE ASSISTANCE OF A QUALIFIED ENGINEER FOR THE PROPER SIZING OF ALL STRUCTURAL HEADERS, RAFTERS, SUPPORT BEAMS, LAMINATED BEAMS, JOISTS, FOOTINGS, ETC. IT IS THE BUILDER/ OWNER RESPONSIBILITY TO VERIFY ALL DIMENSIONS 8 DESICzN OF THESE DOCUMENTS FOR ACCURACY. 0 m LH U 0 LH z O — U (s) LLL — LuLLI -� i-- LLl (L LLI _ 1--H U LH J--H O Lu } U �q z Q O � zLu _ cn Lu m W �zO 0 < U <� z ac Lu0-� �C)< U z F w Fn 0 U Lu w J 0 \0 -4 Q s \0 W z 0@ w a-4z o,1(D z Z J-a U � Jw� a >Za JO=� m� W J I, Z a I,� < = w T— o SHEET NO A-1 OF 4 DATE 6/16/21 DUJN NO 10