Loading...
HomeMy WebLinkAboutA011.6MATERIAL FINISH LEGEND ACT-1 P-1 [ TYPICAL CEILINGS ] PAINT (EGGSHELL) SHERWIN WILLIAMS, SPECIFIC SHADE OF WHITE TO BE SELECTED BY ARCHITECT FROM MANUFACTURER'S FULL RANGE. P-2 [ TYPICAL WALL ] PAINT (EGGSHELL) SHERWIN WILLIAMS, SW 6169 SEDATE GRAY. P-3 P-4 CPT-1 [ ACCENT ] PAINT (EGGSHELL) SHERWIN WILLIAMS, COLOR TO BE MATCH PANTONE 653C (FORUM BLUE). FG-1 ENTRANCE / WALK-OFF CARPETING. MILLIKEN QUADRUS ORBIT BRUSH - COLOR: BOUNDARY QUARTER-TURN INSTALLATION. B-1 CARPET TILE. MILLIKEN OUT OF THE SHADOWS - SPLICE. COLOR: SP312 NOCTURNE. QUARTER-TURN INSTALLATION. CPT-2 SS-1 [ LOBBY COUNTERTOPS ] SOLID SURFACE COUNTERTOPS, CORIAN GRAYLITE. [ METAL DOORS AND FRAMES ] PAINT (SEMI-GLOSS) SHERWIN WILLIAMS, SW 7075 WEB GRAY. CTG-1 CLEAR TEMPERED GLASS WD-1 4" RUBBER COVE BASE. JOHNSONITE BASEWORKS - 20 CHARCOAL PL-2 PL-1 [ TELLER STATION PANELS ] PLASTIC LAMINATE, NEVAMAR SILVER ALU METALX [ WOOD DOORS + MILLWORK CABINETS ] MARSHFIELD WOOD DOORS - PLAIN SLICED WHITE MAPLE, STAINED SAFFRON. [ COUNTERTOPS + CABINETS ] PLASTIC LAMINATE, NEVAMAR WROUGHT IRON S6054T ACOUSTICAL CEILING TILE. MATCH EXISTING TILE IN BRANCH. WHITE LAMINATED GLASS RFT-1 [ RESILIENT FLOOR TILE ] ARMSTRONG, PRODUCT TO BE SELECTED. GENERAL FINISH NOTES 1. REFER TO FINISH PLAN, ROOM FINISH SCHEDULE, INTERIOR ELEVATIONS, AND REFLECTED CEILING PLANS FOR FINISH INFORMATION. 2. MATERIAL INFORMATION IS GIVEN WHEREVER POSSIBLE ON THE INTERIOR SHEETS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT SO THAT THE CORRECT MATERIAL IS INSTALLED. 3. REFER TO THE SPECIFICATIONS FOR EACH MATERIAL SELECTION. 4. ALL MATERIALS ARE TO BE INSTALLED USING THE MANUFACTURER'S RECOMMENDED ADHESIVES. 5. GYP. BD. WALLS AND SOFFITS TO RECEIVE A LEVEL FOUR (4) FINISH UNLESS NOTED OTHERWISE. 6. WALLS ARE TO BE PAINTED P-2 UNLESS NOTED OTHERWISE. 7. GYP. BD. BULKHEADS AND CEILINGS ARE TO BE PAINTED P-1 UNLESS NOTED OTHERWISE. 8. BULKHEADS, SOFFITS, AND FUR-DOWNS ARE TO BE FINISHED WITH THE SAME MATERIAL AND/OR COLOR ON ALL FACES AS SPECIFIED UNLESS NOTED OTHERWISE. 9. THERE SHALL NOT BE PAINT CONDITIONS THAT OCCUR CAUSING FINISH OR COLOR TO CHANGE ON AN OUTSIDE CORNER UNLESS NOTED OTHERWISE. IF THIS CONDITION OCCURS BRING THIS TO THE ARCHITECT'S ATTENTION IMMEDIATELY. 10. WALL GRILLES, CEILING DIFFUSERS, AND FIRE EXTINGUISHER CABINETS ARE TO BE FINISHED IN THE SAME MATERIAL AS THE ADJACENT WALL MATERIAL. 11. TRANSITIONS, REDUCER STRIPS, AND THRESHOLDS TO BE LOCATED AT CENTERLINE OF DOOR WHEN IN CLOSED POSITION. 12. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT DOORS UNLESS NOTED OTHERWISE. 13. FLOORING MATERIAL SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION. TRANSITIONS, IF NEEDED, ARE ALSO TO BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION. 14. CARPET SEAMS TO BE LOCATED AT CENTERLINE OF DOOR IN CLOSED POSITION. 15. CARPET TILE TO BE QUARTER TURNED UNLESS NOTED OTHERWISE. 16. FLOORING TO BE INSTALLED PERPENDICULAR TO ROOM WALLS UNLESS NOTED OTHERWISE. 17. RUBBER TRANSITIONS AND METAL TRANSITIONS TO OCCUR BETWEEN DIFFERENT MATERIALS AND ARE TO BE SELECTED BY ARCHITECT FROM MANUFACTURER'S FULL RANGE OF PRODUCTS. 18. REQUIRED FLOORING UNDERLAYMENTS ARE TO BE PROVIDED AND INSTALLED BY THE FLOORING CONTRACTOR. NOT F O R CON S T R U C TI O N See Drawing CERTIFICATION 626 North Illinois Street Indianapolis, Indiana 46204 Phone: (317) 635-5030 Website: www.browningday.com Checked By: Scale: Issue Date: Drawn By: Project No.: Owner 6/16/2021 4:19:04 PM \\bdmd.local\UEM\UserShare\kthompson\Documents\FORUM_Carmel Reno_kthompson.rvtA5.01 Room Finish and Material Schedules 21I010 Author Checker 6/15/21 FORUM Credit Union Branch Renovation 2259 E 116th Street, Carmel, IN 46032 Construction Documents 11313 USA Parkway Fishers, IN 46038 Phone: (317) 558-6000 Website: www.forumcu.com FORUM Credit Union 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 Phone: (317) 781-6200 Website: www.circledesigngroup.com Circle Design Group MEP Engineer ROOM FINISH SCHEDULE Room Number Room Name Floor Finish Base Finish Wall Finish Ceilings Additional Information Ceiling Finish 1st Floor 100 VESTIBULE CPT-2 B-1 P-2 - 101 LOBBY CPT-1 B-1 P-2/P-3 ACT-1 SEE ELEVATIONS FOR ACCENT PAINT LOCATIONS 104 OFFICE CPT-1 B-1 P-2/P-3 ACT-1 105 OFFICE CPT-1 B-1 P-2/P-3 ACT-1 105A CLOSET CPT-1 B-1 - - 106 OFFICE CPT-1 B-1 P-2/P-3 ACT-1 107 MECH - - - - 108 FLEX OFFICE CPT-1 B-1 P-2/P-3 ACT-1 109 BREAK RFT-1 B-1 - - FLOORING TO BE SELECTED 110 RESTROOM RFT-1 B-1 - - FLOORING TO BE SELECTED 111 WORK CPT-1 B-1 P-2 ACT-1 112 VAULT CPT-1 B-1 - - 113 TELLERS CPT-1 B-1 P-2/P-3 ACT-1 115 OFFICE CPT-1 B-1 P-2/P-3 ACT-1 REVISION SCHEDULE Rev. # Revision Description Issue Date 07/06/21