Loading...
HomeMy WebLinkAboutM101TT GRILLE AND DIFFUSER SCHEDULE B 24" X 24" SQUARE CONE DIFFUSER ROUND NECK PRICE SCD J 1/2" X 1/2" X 1/2" EGG CRATE GRILLE PRICE 80 EX EXISTING GRILLE/DIFFUSER BALANCE TO CFM LISTED SPECIAL NOTES & FINISHES GRILLE SLOT/LINEAR DIFFUSER DESCRIPTION TYPE TYPE NECK SIZE DIFFUSER CFM TYPE CFM NO. OF SLOTS - LENGTH CFM SIZE TYPE TYPE DRAWING LEGEND LINEAR BAR DIFFUSER WIDTH - LENGTH CFM MANUFACTURER & MODEL NUMBER F-2 F-1 F-2 2 F-1 1 6ø B 6ø 100 EX 6ø 120 EX 6ø 120 EX 8ø 190 EX 6ø 130 EX 6ø 150EX6ø 150 EX 8ø 275 EX 8ø 245 J 24/12 3 EX 6ø 100 EX 6/6 60 4 10ø GENERAL HVAC NOTES: A. REFERENCE SHEET M-000 FOR HVAC SYMBOLS, LEGENDS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES. B. EXISTING DUCTWORK SHOWN FOR REFERENCE ONLY BASED ON EXISTING DRAWINGS. SIZES AND ROUTING HAVE NOT BEEN FIELD VERIFIED. C. REBALANCE DIFFUSERS TO CFM INDICATED. JOINING AND ATTACHING FLEXIBLE DUCT SPECIFICATION: A. METALLIC FLEXIBLE DUCT SHALL BE ATTACHED USING A MINIMUM OF THREE #3 SHEET METAL SCREWS EQUALLY SPACED AROUND THE DUCTS CIRCUMFERENCE; DUCTS LARGER THAN 12"Ø SHALL HAVE A MINIMUM OF FIVE #8 SHEET METAL SCREWS. SCREWS SHALL BE LOCATED AT LEAST 1/2" FROM THE DUCT END. B. NON-METALLIC FLEXIBLE DUCT SHALL BE SECURED TO THE SLEEVE OR COLLAR USING A DRAW BAND. IF THE DUCT COLLAR EXCEEDS 12"Ø, THE DRAW BAND MUST BE POSITIONED BEHIND A BEAD ON THE METAL COLLAR. C. INSULATION AND VAPOR BARRIERS PRESENT ON FACTORY-FABRICATED DUCTS SHALL BE FITTED OVER THE CORE CONNECTION AND SHALL BE SUPPLEMENTALLY SECURED WITH A DRAW BAND. D. FLEXIBLE DUCT SEALING SHALL BE A CLASS "B" SEAL FOR LOW PRESSURE SUPPLY. RECTANGULAR SUPPLY DUCTSPIN-IN FITTING W/VOLUME DAMPER FLEX DUCT-MAXIMUM 6'-0" LENGTH AND NO MORE THAN ONE (1) 90° BEND. SQUARE TO ROUND FITTING CEILING SUPPLY DIFFUSER 90° METAL ELBOW TYPICAL AT ALL DIFFUSER CONNECTIONS TYPE J GRILLE -SEE FLOOR PLANS FOR SIZE. INTERNALLY LINED DUCTWORK SEE FLOOR PLANS FOR DUCT SIZE.8".4' LONG See Drawing CERTIFICATION 626 North Illinois Street Indianapolis, Indiana 46204 Phone: (317) 635-5030 Website: www.browningday.com Checked By: Scale: Issue Date: Drawn By: CDG No.: Owner 6/18/21 10:56:57 AM C:\Users\cmikaitis\Documents\21028-R20-Forum-Carmel_MEP_CMikaitis.rvtH-101 FIRST FLOOR HVAC PLAN 21028 CJM RW 06/18/21 FORUM Credit Union Branch Renovation 2259 E 116th Street, Carmel, IN 46032 Construction Documents 11313 USA Parkway Fishers, IN 46038 Phone: (317) 558-6000 Website: www.forumcu.com FORUM Credit Union 9229 Delegates Row Suite 150 Indianapolis, IN 46240 Phone: (317) 781-6200 Website: www.circledesigngroup.com Circle Design Group MEP Engineer 1/4" = 1'-0" FIRST FLOOR HVAC PLAN1 N 0 8'4'2' SHEET PLAN NOTES 1 RELOCATED THERMOSTAT MOUNTED AT 48" AFF. EXTEND CONTROL WIRING AS NECESSARY. PROVIDE CLEAR LOCKABLE COVER. 2 CONNECT TO EXISTING DUCTWORK AT THIS LOCATION. 3 24/6 INTERNALLY LINED DUCT OPEN TO CEILING PLENUM. 4 INSTALL NEW DUCTWORK, BALANCE DAMPER, AND TRANSITION FROM EXISTING PER SMACNA STANDARDS. NOT TO SCALE Typical Supply Diffuser Installation Detail2 NOT TO SCALE Air Transfer Duct Detail3 REVISION SCHEDULE Rev. # Revision Description Issue Date 07/06/21