HomeMy WebLinkAboutM101TT
GRILLE AND DIFFUSER SCHEDULE
B 24" X 24" SQUARE CONE DIFFUSER ROUND NECK PRICE SCD
J 1/2" X 1/2" X 1/2" EGG CRATE GRILLE PRICE 80
EX EXISTING GRILLE/DIFFUSER BALANCE TO CFM LISTED
SPECIAL NOTES & FINISHES
GRILLE SLOT/LINEAR DIFFUSER
DESCRIPTION
TYPE
TYPE NECK SIZE
DIFFUSER
CFM
TYPE
CFM
NO. OF SLOTS - LENGTH
CFM
SIZE TYPE TYPE
DRAWING LEGEND
LINEAR BAR DIFFUSER
WIDTH - LENGTH
CFM
MANUFACTURER & MODEL NUMBER
F-2
F-1
F-2
2
F-1
1
6ø
B 6ø
100
EX 6ø
120
EX 6ø
120
EX 8ø
190
EX 6ø
130
EX 6ø
150EX6ø
150
EX 8ø
275
EX 8ø
245
J 24/12
3 EX 6ø
100
EX 6/6
60
4
10ø
GENERAL HVAC NOTES:
A. REFERENCE SHEET M-000 FOR HVAC SYMBOLS, LEGENDS, ABBREVIATIONS
AND ADDITIONAL GENERAL NOTES.
B. EXISTING DUCTWORK SHOWN FOR REFERENCE ONLY BASED ON EXISTING
DRAWINGS. SIZES AND ROUTING HAVE NOT BEEN FIELD VERIFIED.
C. REBALANCE DIFFUSERS TO CFM INDICATED.
JOINING AND ATTACHING FLEXIBLE DUCT SPECIFICATION:
A. METALLIC FLEXIBLE DUCT SHALL BE ATTACHED USING A MINIMUM OF THREE #3 SHEET METAL SCREWS
EQUALLY SPACED AROUND THE DUCTS CIRCUMFERENCE; DUCTS LARGER THAN 12"Ø SHALL HAVE A
MINIMUM OF FIVE #8 SHEET METAL SCREWS. SCREWS SHALL BE LOCATED AT LEAST 1/2" FROM THE DUCT
END.
B. NON-METALLIC FLEXIBLE DUCT SHALL BE SECURED TO THE SLEEVE OR COLLAR USING A DRAW BAND. IF
THE DUCT COLLAR EXCEEDS 12"Ø, THE DRAW BAND MUST BE POSITIONED BEHIND A BEAD ON THE METAL
COLLAR.
C. INSULATION AND VAPOR BARRIERS PRESENT ON FACTORY-FABRICATED DUCTS SHALL BE FITTED OVER THE
CORE CONNECTION AND SHALL BE SUPPLEMENTALLY SECURED WITH A DRAW BAND.
D. FLEXIBLE DUCT SEALING SHALL BE A CLASS "B" SEAL FOR LOW PRESSURE SUPPLY.
RECTANGULAR
SUPPLY DUCTSPIN-IN FITTING
W/VOLUME
DAMPER
FLEX DUCT-MAXIMUM 6'-0"
LENGTH AND NO MORE
THAN ONE (1) 90° BEND.
SQUARE TO
ROUND FITTING
CEILING
SUPPLY
DIFFUSER
90° METAL ELBOW TYPICAL AT
ALL DIFFUSER CONNECTIONS
TYPE J GRILLE -SEE FLOOR
PLANS FOR SIZE.
INTERNALLY LINED DUCTWORK
SEE FLOOR PLANS FOR DUCT SIZE.8".4' LONG
See Drawing
CERTIFICATION
626 North Illinois Street
Indianapolis, Indiana 46204
Phone: (317) 635-5030
Website: www.browningday.com
Checked By:
Scale:
Issue Date:
Drawn By:
CDG No.:
Owner
6/18/21 10:56:57 AM C:\Users\cmikaitis\Documents\21028-R20-Forum-Carmel_MEP_CMikaitis.rvtH-101
FIRST FLOOR HVAC PLAN
21028
CJM
RW
06/18/21
FORUM Credit Union
Branch Renovation
2259 E 116th Street,
Carmel, IN 46032
Construction Documents
11313 USA Parkway
Fishers, IN 46038
Phone: (317) 558-6000
Website: www.forumcu.com
FORUM Credit Union
9229 Delegates Row Suite 150
Indianapolis, IN 46240
Phone: (317) 781-6200
Website: www.circledesigngroup.com
Circle Design Group
MEP Engineer
1/4" = 1'-0"
FIRST FLOOR HVAC PLAN1 N
0 8'4'2'
SHEET PLAN NOTES
1 RELOCATED THERMOSTAT MOUNTED AT 48" AFF. EXTEND CONTROL WIRING
AS NECESSARY. PROVIDE CLEAR LOCKABLE COVER.
2 CONNECT TO EXISTING DUCTWORK AT THIS LOCATION.
3 24/6 INTERNALLY LINED DUCT OPEN TO CEILING PLENUM.
4 INSTALL NEW DUCTWORK, BALANCE DAMPER, AND TRANSITION FROM
EXISTING PER SMACNA STANDARDS.
NOT TO SCALE
Typical Supply Diffuser Installation Detail2
NOT TO SCALE
Air Transfer Duct Detail3
REVISION SCHEDULE
Rev. # Revision Description Issue Date
07/06/21