Loading...
HomeMy WebLinkAboutA011.01 DEMO 1 DEMO 2 DEMO 2 DEMO 4 DEMO 3 DEMO 2 DEMO 5 DEMO FLEX OFFICE 108 MECH 107 BREAK 109 RESTROOM 110 OFFICE 106 OFFICE 105 WORK 111 OFFICE 104 CLOSET 105A VAULT 112 VESTIBULE 100 LOBBY 101 TELLERS 113 3 DEMO 3 DEMO 3 DEMO 3 DEMO 3 DEMO 3 DEMO 3 DEMO 3 DEMO 3 DEMO 3 DEMO 7 DEMO 6 DEMO 6 DEMO 6 DEMO 6 DEMO 6 DEMO 7 DEMO 8 DEMO GENERAL DEMOLITION NOTES 1. THOROUGHLY REVIEW THE CONSTRUCTION DOCUMENT SET FOR ADDITIONAL DEMOLITION COORDINATION. VERIFY CONFLICTING ITEMS WITH THE ARCHITECT PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK. 2. DEMOLITION IS TO BE CLEAN, COMPLETE, AND IN A MANNER SUITABLE TO ACCEPT NEW FINISHES AND SURFACES. SEE ARCHITECTURAL DRAWINGS FOR DESCRIPTION OF NEW MATERIALS. 3. CONTRACTOR TO VERIFY LOCATIONS OF DUCTWORK AND PIPING PENETRATIONS THROUGH EXISTING WALLS AND ABOVE CEILINGS PRIOR TO MAKING OPENING. 4. OPENINGS IN THE EXISTING BUILDING WHICH REMAIN AFTER PIPING, DUCTWORK, AND OTHER PENETRATIONS HAVE BEEN REMOVED AND WHICH ARE NOT BEING REUSED AS A PART OF THE BUILDING RENOVATION ARE TO BE INFILLED FLUSH WITH THE SAME MATERIAL AS THE SURROUNDING WALL. 5. WHEN DEMOLITION CAUSES OR EXPOSES DAMAGE TO THE FLOOR SLAB, WALLS, CEILINGS, OR ROOF THE CONTRACTOR SHALL REPAIR SUCH CONDITIONS AND MAKE THEM SUITABLE FOR FINAL CONSTRUCTION. 6. IF ANY MATERIAL IS ENCOUNTERED THAT IS SUSPECTED TO CONTAIN ASBESTOS DO NOT DISTUB AND IMMEDIATELY CONTACT THE OWNER FOR REMEDIATION. 7. THE CONTRACTOR IS TO FOLLOW AND OBEY ALL FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, AND HAZARDOUS WASTE LAWS ETC.. CONTRACTOR IS TO OBTAIN ALL NECESSARY PERMITS, RELEASES, AND AUTHORIZATIONS BEFORE PERFORMING DEMOLITION WORK. 8. ALL CONTRACTORS ARE TO CONDUCT NON- STRUCTURAL EXPLORATORY DEMOLITION TO DETERMINE STRUCTURAL EFFECT ON ALL PLANNED DEMOLITION AND CONFIRM WITH THE STRUCTURAL ENGINEER BEFORE ANY DEMOLITION OCCURS. 9. WALLS TO BE REMOVED SHALL BE REMOVED IN FULL UNLESS NOTED OTHERWISE. REMOVE TO SUBFLOOR MATERIAL, ALL FLOOR ATTACHMENTS, AND GRIND SMOOTH REMAINING ITEMS FLUSH WITH EXISTING FINISH FLOOR. PATCH AND FILL ANY VOIDS LEFT BY REMOVAL OF EXISTING WALL WITH EXISTING FINISH FLOOR. 10. FOR DOORS TO BE REMOVED THE CONTRACTOR SHALL REMOVE DOOR, DOOR FRAME, DOOR HARDWARE, ASSOCIATED ANCHORING, AND ALL ASSOCIATED TRANSOMES AND/OR SIDELITES AND GLAZING COMPLETE UNLESS NOTED OTHERWISE. 11. ANY FLOOR MATERIALS THAT ARE INDICATED TO BE REMOVED SHALL BE REMOVED TO SOUND SUB-BASE MATERIAL AND ARE TO BE FREE OF GLUES, FASTENERS AND FILLERS. 12. FURNISH AND INSTALL TEMPORARY BARRICADES AND HANDRAILS AT ALL OPENINGS DURING DEMOLITION AND CONSTRUCTION. 13. THESE DRAWINGS WERE DEVELOPED FROM A VISUAL SURVEY OF THE EXISTING CONDITIONS. THE AVAILABLE ORIGINAL ARCHITECTURAL AND STRUCTURAL DRAWINGS HAVE BEEN USED FOR LOCATION OF STRUCTURAL SUPPORTS. THE INFORMATION REFLECTED IN THOSE DRAWINGS DOES NOT GUARANTEE THAT ALL THE AS-BUILT CONDITIONS HAVE BEEN REPRESENTED. ALL EXISTING CONDITIONS, ELEVATIONS, AND DIMENSIONS ARE TO BE VERIFIED IN FIELD BY THE CONTRACTOR OR SUBCONTRACTORS PRIOR TO CONSTRUCTION OR FABRICATION. 14. THE CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS WITH THE CONTRACT DOCUMENTS. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES IN WRITING BEFORE PROCEEDING WITH THE WORK. 15. EXISTING CONSTRUCTION TO REMAIN ARE TO BE PROTECTED DURING THE DEMOLITION AND CONSTRUCTION PROCESS INCLUDING BUT NOT LIMITED TO ALL WALLS (STRUCTURAL AND PARTITION), CEILINGS, FLOORS, DOORS, FINISHES, ETC. 16. DEMOLITION IS TO BE CONDUCTED IN A MEANS THAT DOES NOT DAMAGE THE IMMEDIATELY ADJACENT EXISTING CONSTRUCTION TO REMAIN. ANY DAMAGE INCURRED DURING DEMOLITION TO EXISTING CONSTRUCTION TO REMAIN IS TO BE REPAIRED BACK TO ORIGINAL CONDITION AS PART OF THIS CONTRACT. 17. SALVAGEABLE, TO BE REMOVED DOORS, EQUIPMENT, FIXTURES, ETC. ARE TO BE STOCKPILED IN A DESIGNATED AREA FOR REVIEW BY THE OWNER. 18. CAP ABANDONED CONDUITS AT POINT OF TERMINATION AND MAINTAIN ANY REQUIRED FIRE SEPARATION. 19. CONTRACTOR TO PROVIDE FILTRATION IN THE EXISTING AND OR NEW MECHANICAL SYSTEMS TO ELIMINATE DEMOLITION AND CONSTRUCTION DUST FROM ENTERING ADJACENT PORTIONS OF THE BUILDING. 20. EXISTING 120 VOLT, 208 VOLT, AND 480 VOLT SINGLE AND 3 PHASE POWER, LIGHTING, RECEPTACLES, AND POWER TO EQUIPMENT IS TO BE REMOVED BACK TO SOURCES (PANEL BOARDS), EXCEPT ITEMS INDICATED TO REMAIN. THIS INCLUDES BUT IS NOT LIMITED TO ALL WIRING AND CONDUIT NOT REUSED. PROVIDE FOR CIRCUIT CONTINUITY FOR ITEMS THAT REMAIN. 21. ALL EXISTING LOOSE AND OR FLAKING PAINT THAT IS NOT ENCAPSULATED IN A NEW FINISH IS TO BE SCRAPED, ABRADED, AND/OR SANDED TO A SMOOTH FLAT SURFACE PREPARED TO RECEIVE NEW FINISH. NOT F O R CON S T R U C TI O N See Drawing CERTIFICATION 626 North Illinois Street Indianapolis, Indiana 46204 Phone: (317) 635-5030 Website: www.browningday.com Checked By: Scale: Issue Date: Drawn By: Project No.: Owner 6/16/2021 4:18:48 PM \\bdmd.local\UEM\UserShare\kthompson\Documents\FORUM_Carmel Reno_kthompson.rvtA1.00 Demo Plan 21I010 Author Checker 6/15/21 FORUM Credit Union Branch Renovation 2259 E 116th Street, Carmel, IN 46032 Construction Documents 11313 USA Parkway Fishers, IN 46038 Phone: (317) 558-6000 Website: www.forumcu.com FORUM Credit Union 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 Phone: (317) 781-6200 Website: www.circledesigngroup.com Circle Design Group MEP Engineer A1.00 1/4" = 1'-0" Floor Plan1 1st Floor Demo CODED DEMOLITION NOTES NO. NOTE 1 EXISTING WALLS TO BE REMOVED. GLASS TO BE SALVAGED FOR REUSE. 2 EXISTING MILLWORK TO BE REMOVED. 3 EXISTING FLOOR & BASE FINISH TO BE REMOVED. 4 EXISTING BULKHEAD TO BE REMOVED. 5 SAFE DEPOSIT BOXES TO BE REMOVED. 6 EXISTING DOOR TO BE REMOVED. 7 EXISTING DOOR & FRAME TO BE REMOVED. 8 EXISTING DRIVE THRU TELLER CABINETRY TO REMAIN. REVISION SCHEDULE Rev. # Revision Description Issue Date 07/06/21