HomeMy WebLinkAboutA011.5A1.01-A2
A1.01-A2
6
4
7
A1.01-A2
5
OFFICE
115
CPT-1
P-2/P-3
B-1
OFFICE
105
CPT-1
P-2/P-3
B-1
OFFICE
106
CPT-1
P-2/P-3
B-1
FLEX OFFICE
108
CPT-1
P-2/P-3
B-1
MECH
107
BREAK
109
RFT-1
-
B-1
RESTROOM
110
RFT-1
-
B-1
WORK
111
CPT-1
P-2
B-1
VAULT
112
CPT-1
-
B-1
OFFICE
104
CPT-1
P-2/P-3
B-1
VESTIBULE
100
CPT-2
P-2
B-1
TELLERS
113
CPT-1
P-2/P-3
B-1
LOBBY
101
CPT-1
P-2/P-3
B-1
A1.01-A28
PL-2
TELLER COUNTER
TBD - CABINET FINISH
P-3
GENERAL FINISH NOTES
1. REFER TO FINISH PLAN, ROOM FINISH SCHEDULE,
INTERIOR ELEVATIONS, AND REFLECTED CEILING PLANS
FOR FINISH INFORMATION.
2. MATERIAL INFORMATION IS GIVEN WHEREVER POSSIBLE
ON THE INTERIOR SHEETS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO BRING ANY
DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT
SO THAT THE CORRECT MATERIAL IS INSTALLED.
3. REFER TO THE SPECIFICATIONS FOR EACH MATERIAL
SELECTION.
4. ALL MATERIALS ARE TO BE INSTALLED USING THE
MANUFACTURER'S RECOMMENDED ADHESIVES.
5. GYP. BD. WALLS AND SOFFITS TO RECEIVE A LEVEL
FOUR (4) FINISH UNLESS NOTED OTHERWISE.
6. WALLS ARE TO BE PAINTED P-2UNLESS NOTED
OTHERWISE.
7. GYP. BD. BULKHEADS AND CEILINGS ARE TO BE
PAINTED P-1 UNLESS NOTED OTHERWISE.
8. BULKHEADS, SOFFITS, AND FUR-DOWNS ARE TO BE
FINISHED WITH THE SAME MATERIAL AND/OR COLOR ON
ALL FACES AS SPECIFIED UNLESS NOTED OTHERWISE.
9. THERE SHALL NOT BE PAINT CONDITIONS THAT OCCUR
CAUSING FINISH OR COLOR TO CHANGE ON AN OUTSIDE
CORNER UNLESS NOTED OTHERWISE. IF THIS
CONDITION OCCURS BRING THIS TO THE ARCHITECT'S
ATTENTION IMMEDIATELY.
10. WALL GRILLES, CEILING DIFFUSERS, AND FIRE
EXTINGUISHER CABINETS ARE TO BE FINISHED IN THE
SAME MATERIAL AS THE ADJACENT WALL MATERIAL.
11. TRANSITIONS, REDUCER STRIPS, AND THRESHOLDS TO
BE LOCATED AT CENTERLINE OF DOOR WHEN IN
CLOSED POSITION.
12. ALIGN FLOORING TRANSITIONS WITH FINISH BASE
EXCEPT AT DOORS UNLESS NOTED OTHERWISE.
13. FLOORING MATERIAL SHALL BE CENTERED UNDER THE
DOOR IN THE CLOSED POSITION. TRANSITIONS, IF
NEEDED, ARE ALSO TO BE CENTERED UNDER THE
DOOR IN THE CLOSED POSITION.
14. CARPET SEAMS TO BE LOCATED AT CENTERLINE OF
DOOR IN CLOSED POSITION.
15. CARPET TILE TO BE QUARTER TURNED UNLESS NOTED
OTHERWISE.
16. FLOORING TO BE INSTALLED PERPENDICULAR TO ROOM
WALLS UNLESS NOTED OTHERWISE.
17. RUBBER TRANSITIONS AND METAL TRANSITIONS TO
OCCUR BETWEEN DIFFERENT MATERIALS AND ARE TO
BE SELECTED BY ARCHITECT FROM MANUFACTURER'S
FULL RANGE OF PRODUCTS.
18. REQUIRED FLOORING UNDERLAYMENTS ARE TO BE
PROVIDED AND INSTALLED BY THE FLOORING
CONTRACTOR.
SYMBOL LEGEND
MATERIAL FINISH NOTE. SEE SHEET A5-SERIES
OF DRAWINGS AND SPECIFICATIONSP-1
NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
See Drawing
CERTIFICATION
626 North Illinois Street
Indianapolis, Indiana 46204
Phone: (317) 635-5030
Website: www.browningday.com
Checked By:
Scale:
Issue Date:
Drawn By:
Project No.:
Owner
6/16/2021 4:19:03 PM \\bdmd.local\UEM\UserShare\kthompson\Documents\FORUM_Carmel Reno_kthompson.rvtA1.01-F
1st Floor, Finish Plan
21I010
Author
Checker
6/15/21
FORUM Credit Union
Branch Renovation
2259 E 116th Street,
Carmel, IN 46032
Construction Documents
11313 USA Parkway
Fishers, IN 46038
Phone: (317) 558-6000
Website: www.forumcu.com
FORUM Credit Union
9229 Delegates Row, Suite 150
Indianapolis, IN 46240
Phone: (317) 781-6200
Website: www.circledesigngroup.com
Circle Design Group
MEP Engineer
A1.01-F 1/4" = 1'-0"
Floor Plan1 1st Floor Finish Plan
REVISION SCHEDULE
Rev. # Revision Description Issue Date
07/06/21