Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S103_Bid Addendum No. 1
A B C D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A.1 B.1 C.1 AREA A AREA B 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 9" 60' - 0" 9"10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 20' - 0" 20' - 0"150' - 0" 9"ELEV OPNG J1 J1 L1 STAIR OPNG 6" W12X16 W12X16 W12X16 W12X16 W36X135 W18X40B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2B2 AA AH2 H2 H5H5 H2 H5H5 SW2 SW2 MO L1J1 J1 W2 W3 W2 W2 W3 W2 W2 1.5 2.5 H10 H9 H9 H9 H10 SW2 SW2 C7 W16X31 10 S202 10 S202 10 S202 10 S202 10 S202 10 S202 10 S202 11 S202 TYP 11 S202 TYP 11 S202 TYP 16 S201 16 S20117 S201 16 S201 16 S201 16 S201 21 S202 C23 S202 TYP @ BM 12 S202 SIM22 S202 SIM8 S202 8 S202 7 S202TYP 7 S202 TYP SEE 5/S202 1 SIM 16 S201 SIM 29 S202 1 20 S202 21 S202 12 S202 TYP 30 S202 1 26 S202 1 A B C D 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 A.1 B.1 C.1 AREA A AREA B 9" 180' - 0"10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0"10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" J1 J1 L1 STAIR OPNG W12X16 W36X135W12X16 W12X16 6" 5' - 10 5/8" 19' - 4 3/8"3 13/16"B2B2 B2 B2 B2B2 B2B2 B2B2 B2B2 B2B2 B2B2 B2B2 B2B2 B2B2 B2B2 B2B2 B2B2 B2 B2B2 B2 H5ASW2 MO A ASW2 SW2 W2 W3 W2 W1 H10 11 S202 TYP 11 S202 TYP 11 S202 TYP 11 S202 TYP 23 S202 TYP @ BM 21 S202 17 S201 10 S202 7 S202TYP 16 S201 3 SIDES 8 S202 8 S202 29 S202 1 26 S202 27 S202 SIM 24 S202 24 S202 12 S202 TYP 16 S202 SIM 7 S202 TYP 1 SEE 5/S202 B2 B2 H10H9 1 H5 10 S202 7 S202 7 S202 FINISHED FLOOR ELEVATION (FFE) = 124'-0". TOP OF BEAM ELEVATION (TBE) AND DECK BEARING ELEVATION = 123'-7" UNO. SEE SHEET S102 FOR TYPICAL FLOOR FRAMING NOTES AND KEYNOTES. 1. 2. 3. THIRD FLOOR FRAMING PLAN NOTES: Phone: 763.425.9960 Fax: 763.425.9958 5279 Kyler Avenue NE Albertville, MN 55301 SOLUTIONS, P.A. STRUCTURAL INNOVATIVE Email: isspa@isseng.com Web: www.isseng.comISSISSISSPAISSPAPAPA REVISIONS: DRAWN BY DATE ISSUED CHECKED BY Scope Drawings These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of work. PROJECT NUMBER: 618 East Market Street Indianapolis, Indiana 46202 phone 317/264.8162 a x i s a r c h . c o m CLIENT 8-27-2020 JMW MJV 08/27/2020 S103 THIRD FLOOR FRAMING PLAN 86220CARMELExtra Space Storage155 CARMEL DRIVE, CARMEL, INWeihe Engineers 10505 N. College Avenue Brad Schoeff - Sr. Project Manager PH: 317-846-6611 Innovative Structural Solutions, P.A. 5279 Kyler Avenue, NE PH: 763-425-9960 Gooderum & Associates Engineering 874 Cheltenham Way PH: 317-506-8151 Indianapolis, IN 46280 Albertville, MN 55301 Avon, IN 46123 Extra Space Storage 9000 Keystone Crossing, Ste. 660 Jim Adams Indianapolis, IN 46240 PH: 317-663-8648 CIVIL ENGINEER STRUCTURAL ENGINEER MEP ENGINEER N N 1/8" = 1'-0"S103 1 THIRD FLOOR FRAMING PLAN - AREA A 1/8" = 1'-0"S103 2 THIRD FLOOR FRAMING PLAN - AREA B # DESCRIPTION DATE 1 BID ADDEN. 001 10/13/2020 07/14/21