No preview available
HomeMy WebLinkAboutKimley-Horn - Indianapolis - Bid Set 5.26.2021_A0.61© DLR GroupRevisions -ALL PROJECT COMMUNICATION TO BE SENT TO MARK REED/MONICA BATES, NOT AOR.5/25/2021 3:31:29 PMC:\Revit\_2020\KH Indianapolis Expansion CD's v_20_hgriffo.rvt23-21100-00 5.26.2021 BID/PERMIT GENERAL NOTES A0.61250 E. 96TH ST. #580INDIANAPOLIS, IN 46240INDIANAPOLIS, INDIANA1. ALL WORK SHALL CONFORM TO THE LATEST EDITIONS OF LOCAL BUILDING, PLUMBING, MECHANICAL, ELECTRICAL, & ENERGY CODES. SEE DRAWING INDEX SHEET FOR APPLICABLE CODES AND ANY OTHER LOCAL GOVERNING AGENCIES. 2. THE EXISTING FACILITIES INCLUDING, BUT NOT LIMITED TO SANITARY FACILITIES, DRINKING FOUNTAINS, AND ELEVATORS ON ALL FLOORS, COMPLY WITH ACCESSIBILITY REQUIREMENTS. 3. THE EXISTING PATH OF TRAVEL FROM THE DESIGNATED HANDICAP PARKING SPACES AND THE PUBLIC SIDEWALK PROVIDES A FREE AND UNOBSTRUCTED PASSAGE FOR ACCESS TO AND EGRESS FROM THE AREA OF WORK. NO NEW WORK TO EXISTING PARKING GARAGE/STRUCTURE IS INCLUDED IN THIS SCOPE OF WORK 5. LIGHT AND CONTROL SWITCHES SHALL BE MOUNTED NOT MORE THAN 4'-0" ABOVE THE FLOOR OR WORKING PLATFORM OR PER CURRENT ACCESSIBILITY REQUIREMENTS. 6. FLOORS OR LANDINGS LOCATED AT A DOORWAY SHALL BE NOT MORE THAN 1/2" LOWER THAN THE TOP OF THE THRESHOLD, WHICH SHALL HAVE A 1/4" MAXIMUM VERTICAL EDGE AND A CHANGE IN LEVEL NOT GREATER THAN 1:2. 7. A CLEAR AND LEVEL AREA SHALL BE PROVIDED ON EACH SIDE OF EXIT DOORS WITH A LENGTH OF AT LEAST 60" IN THE DIRECTION OF THE DOOR SWING AND AT LEAST 48" IN THE OPPOSITE DIRECTION, MEASURED AT RIGHT ANGLES THE DOOR IN ITS CLOSED POSITION. CONTRACTOR TO ADVISE DLR GROUP OF ANY CONDITION NOT MEETING THESE REQUIREMENTS PRIOR TO CONSTRUCTION. BUILDING DEPARTMENT NOTES 1. PROVIDE FIRE-RESISTANT RATED CONSTRUCTION AS REQUIRED. COMPLY WITH LOCAL CODE REQS. 2. FIRE-RESISTANT-RATED CONSTRUCTION SHALL COMPLY WITH LOCAL CODE REQUIREMENTS. 3. THROUGH PENETRATIONS AND MEMBRANE PENETRATIONS OF HORIZONTAL ASSEMBLIES AND FIRE- RESISTANCE-RATED WALL ASSEMBLIES TO COMPLY WITH LOCAL CODE REQUIREMENTS. 4. OPENING ASSEMBLIES INTO FIRE-RESISTANT-RATED CONSTRUCTION TO COMPLY WITH LOCAL CODE REQS. PROVIDE THE REQUIRED FIRE RESISTANCE RATING TO DOOR, AND WINDOW ASSEMBLIES, OPENING INTO FIRE RATED WALLS. 5. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC WITHIN 75 FEET TRAVEL DISTANCE AND AT LEAST (1) PER 3,000 SF, TO ALL PORTIONS OF THE BUILDING ON EACH FLOOR AND ANY ADDITIONAL FIRE EXTINGUISHERS AS REQUIRED BY FIRE DEPARTMENT FIELD INSPECTOR. FIRE EXTINGUISHERS SHALL ALSO BE PROVIDED DURING CONSTRUCTION. 6. EXTEND AND MODIFY SPRINKLER & LIFE-SAFETY SYSTEMS AS REQUIRED BY CONSTRUCTION. CONTRACTOR SHALL SUBMIT PLANS FOR APPROVAL AND SEPARATE PERMIT DIRECTLY TO THE DEPARTMENT OF BUILDING AND SAFETY, PRIOR TO INSTALLATION. 7. THE PATH OF TRAVEL TO AND WITHIN EXITS IN THIS TENANT SPACE SHALL BE IDENTIFIED BY EXIT SIGNS CONFORMING TO THE REQUIREMENTS OF LOCAL CODE. EXIT SIGNS SHALL BE READILY VISIBLE FROM ANY DIRECTION OF APPROACH. 8. EXIT SIGNS SHALL BE LOCATED AS NECESSARY TO CLEARLY INDICATE THE DIRECTION OF EGRESS TRAVEL. NO POINT SHALL BE MORE THAN 100 FEET FROM THE NEAREST VISIBLE SIGN. PROVIDE AS REQUIRED. ADVISE DLR GROUP OF ADDITIONAL EXIT SIGNS. EXIT SIGNS SHALL BE ELECTRICALLY ILLUMINATED AND THE LIGHT SOURCE SHALL BE ENERGIZED FROM SEPARATE CIRCUITS. ILLUMINATION SHALL NORMALLY BE PROVIDED BY THE PREMISES WIRING SYSTEMS. IN THE EVENT OF THIS SYSTEM'S FAILURE, ILLUMINATION SHALL BE AUTOMATICALLY PROVIDED FROM AN EMERGENCY SYSTEM. EMERGENCY LIGHTING SHALL GIVE A VALUE OF FIVE FOOTCANDLES PER THE LOCAL CODE. WHENEVER THE BUILDING IS OCCUPIED, EXIT SIGNS SHALL BE LIT SO THAT THEY ARE CLEARLY VISIBLE. 9. WHERE EXTERNALLY ILLUMINATED EXIT SIGNS ARE PROVIDED, SIGNAGE AND ILLUMINATION SHALL COMPLY WITH THE LOCAL CODE. 10. ALL INTERIOR FINISHES SHALL CONFORM WITH THE LOCAL CODE REQUIREMENTS. 11. INTERIOR WALL AND CEILING FINISHES SHALL COMPLY WITH THE LOCAL CODE REQUIREMENTS. 12. ACOUSTICAL CEILING SYSTEMS THAT ARE PART OF FIRE-RESISTANCE-RATED CONSTRUCTION SHALL COMPLY WITH THE LOCAL CODE REQUIREMENTS. 13. EXITS, EXIT LIGHTS, FIRE ALARM STATIONS, HOSE CABINETS AND EXTINGUISHER LOCATIONS SHALL NOT BE CONCEALED. 14. EXISTING EXIT PATH LIGHTING OF ONE FOOTCANDLE SHALL BE PROVIDED AT STAIRWAY, HALLWAY, EXIT PASSAGEWAY, AND EGRESS TO A PUBLIC WAY WHENEVER THE BUILDING IS OCCUPIED PER LOCAL CODE. 15. FIRE AND/OR SMOKE DAMPER ASSEMBLIES, INCLUDING SLEEVES, AND INSTALLATION PROCEDURES SHALL BE APPROVED BY THE BUILDING INSPECTOR PRIOR TO INSTALLATION. 16. MINIMUM EXIT CORRIDOR WIDTH SHALL BE PER LOCAL CODE REQUIREMENTS. 17. ALL CONTROLLED ACCESS DEVICES (I.E. CARD READER) AND DOOR HARDWARE SHALL BE AN APPROVED COMPONENT OF THE LIFE-SAFETY SYSTEM EGRESS. 18. ALL DOORS IN THE MEANS OF EGRESS SHALL COMPLY WITH THE LOCAL CODE REQUIREMENTS. 19. SHAFT ENCLOSURES SHALL COMPLY WITH THE LOCAL CODE REQUIREMENTS. 20. DOORS SHALL BE 3'-0" IN WIDTH MINIMUM, AND 7'-0" IN HEIGHT, MINIMUM. 21. ALL DOORS IN THE MEANS OF EGRESS SHALL COMPLY WITH THE LOCAL CODE REQUIREMENTS. 22. EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING AN OCCUPANT LOAD OF 50 OR MORE, OR A GROUP "H" OCCUPANCY PER THE LOCAL CODE REQUIREMENTS. 23. EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY, TOOL, OR SPECIAL KNOWLEDGE OR EFFORT. SPECIAL LOCKING DEVICES SHALL BE OF AN APPROVED TYPE PER THE LOCAL CODE REQUIREMENTS. 24. KEY-LOCKING HARDWARE MAY BE USED ON THE MAIN EXIT WHEN THE MAIN EXIT CONSISTS OF A SINGLE DOOR OR PAIR OF DOORS IF THERE IS A READILY VISIBLE, DURABLE SIGN ON OR ADJACENT TO THE DOOR STATING "THIS DOOR MUST REMAIN UNLOCKED DURING BUSINESS HOURS". 25. DOORS AND FRAMES OF FIRE ASSEMBLIES ARE TO HAVE PERMANENTLY AFFIXED LABELS FOR THE FIRE RATING. 26. SPRINKLERS: THE CONTRACTOR SHALL SUBMIT THE SPRINKLER LAYOUT (INDICATING LOCATIONS AND TYPE OF ALL SPRINKLER HEADS) TO DLR GROUP, FOR REVIEW, BEFORE BUILDING DEPARTMENT SUBMITTAL OR FABRICATION OF PIPING. SPRINKLER LAYOUT DRAWINGS SHALL BE SUBMITTED IN THE FORM OF A REFLECTED CEILING PLAN, INDICATING OTHER PERTINENT ITEMS TO BE INSTALLED IN THE CEILING (I.E., LIGHT FIXTURES, SPEAKERS, H.V.A.C. DIFFUSERS, EXIT SIGNS, ETC.). ALL SPRINKLER HEADS IN GYPSUM BOARD CEILINGS, SOFFITS, ETC., SHALL BE A FULLY CONCEALED TYPE U.O.N. WITH COVERPLATE TO MATCH FINISH ON ADJACENT GYPSUM BOARD CEILING. ALL CONFLICTS SHALL BE INDICATED ON THE SUBMITTED SHOP DRAWINGS. 27. THE FIRE PROTECTION WORK SHALL BE PERFORMED ON A DESIGN-BUILD BASIS. THE DESIGN-BUILD FIRE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ALL MODIFICATIONS TO THE EXISTING FIRE SPRINKLER SYSTEM TO MEET ALL APPLICABLE LOCAL AND STATE CODE REQUIREMENTS. SPRINKLER HEADS SHALL BE DROPPED INTO ALL SUSPENDED CEILING AREAS. UPGRADE OF EXISTING SYSTEM SHALL CONFORM WITH EXISTING/PROPOSED BUILDING OCCUPANCY CLASSIFICATION. 28. THE FIRE EXTINGUISHERS WILL BE INSTALLED PER LOCAL AND STATE FIRE CODES. 29. ANY COMMON AREAS OUTSIDE TENANT SCOPE OF WORK FOUND TO BE DEFICIENT SHALL BE BROUGHT UP TO CODE BY LANDLORD, AT NO COST TO TENANT. FIRE DEPARTMENT NOTES 1. CONTRACTOR TO VERIFY AT BID TIME IF EXISTING PIPES, HVAC OR ANY OTHER ITEM NEEDS TO BE RELOCATED TO ACCOMMODATE THE PROPOSED DESIGN. IF SO, THESE RELOCATIONS SHOULD BE IDENTIFIED IN THE BID TO BE ACCEPTED OR REJECTED BY ARCHITECT. CHANGE ORDERS FOR THESE KINDS OF RELOCATIONS AT ACCESSIBLE CEILINGS WILL NOT BE ACCEPTED DURING CONSTRUCTION. 2. BY ENTERING INTO AN AGREEMENT WITH THE CLIENT, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE JOB SITE, FAMILIARIZED HIMSELF WITH EXISTING CONDITIONS, AND NOTED IN WRITING AND PROVIDED TO DLR GROUP/OWNER ANY DISCREPENCIES WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. EXISTING CONDITION NOTES 1. ALL EXISTING WATER PIPES TO BE WRAPPED PER STATE AND LOCAL CODES. ALL EXISTING PIPE INSTALLATION TO BE REMOVED & REPLACED, U.O.N. NEW INSTALLMENT TO INCLUDE FINISHED QUALITY TAPED JOINTS & ELBOWS WITH IDENTIFICATION SIGNS MTD. ON THE TOP SIDE OF THE PIPE. DLR GROUP TO APPROVE SAMPLE BEFORE THE COMMENCEMENT OF THE ENTIRE SCOPE OF WORK. 2. ALL EXISTING PLUMBING BEING ABANDONED SHALL BE CAPPED AS PER STATE AND LOCAL CODES BEHIND EXISTING FINISHED SURFACES. 3. THE PLUMBING CONTRACTOR SHALL NEVER LOCATE WATER LINES ABOVE A SUITE'S I.T./SERVER ROOM(S). THE PLUMBING CONTRACTOR SHALL REMOVE AND/OR RELOCATE ALL WATER LINES ABOVE THE SUITE'S I.T./SERVER ROOM(S) AND PROVIDE WATER DETECTION ALARMS AND PANS BELOW ANY WATER LINES THAT CANNOT BE RELOCATED. 4. THE PLUMBING CONTRACTOR SHALL SUBMIT CUT SHEETS OF ALL NEW FIXTURES, FITTINGS, AND ACCESSORIES TO DLR GROUP FOR REVIEW. 5. THE PLUMBING CONTRACTOR SHALL COORDINATE AND INSTALL HIS WORK IN ACCORDANCE WITH MANUFACTURERS' SPECIFICATIONS. 6. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL VALVES AS REQUIRED FOR THE PROPER CONTROL OF THE PIPING AND APPARATUS INSTALLED AS PART OF THIS PROJECT SO THAT ANY FIXTURE OR LINE MAY BE CUT OFF AND REPAIRED WITHOUT INTERFERENCE OR INTERRUPTION OF SERVICE TO THE REMAINDER OF THE BUILDING. 7. BEFORE COVERED UP OR BUILT-IN, ALL PIPING SHALL BE TESTED AND INSPECTED AS REQUIRED BY THE AUTHORITIES HAVING JURISDICTION. 8. CONTRACTOR SHALL PROVIDE & COORDINATE LOCATION OF FLOOR DRAINS AT RESTROOMS, SHOWER ROOMS, JANITOR CLOSETS. PLACE DRAIN @ ℄OF FLOORING TILE. PLUMBING NOTES 1. CONTRACTOR SHOULD NOT SCALE DRAWINGS, ALL NOTED DIMENSIONS GOVERN. LARGE SCALE DETAILS GOVERN OVER SMALLER SCALE DETAILS. 2. ALL REQUIRED PERMITS AND LICENSES SHALL BE OBTAINED AND PAID FOR BY THE CONTRACTOR. 3. AT THE TIME OF BID SUBMITTAL, THE CONTRACTOR SHALL ADVISE DLR GROUP, IN WRITING, OF ANY SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY TO THE COMPLETION OF CONSTRUCTION. 4. IMMEDIATELY AFTER BEING AWARDED THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE WHICH SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE JOB SITE AT ALL TIMES. 5. THE CONTRACTOR SHALL VERIFY THE REQUIRED LOCATIONS AND INCLUDE IN BASE BID ALL RELATED COSTS FOR ALL NECESSARY FRAMELESS ACCESS PANELS (IN PARTITIONS, FLOORS OR CEILINGS). THE CONTRACTOR SHALL COORDINATE WITH DLR GROUP BEFORE INSTALLATION. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY UTILITIES (POWER, LIGHTING, WATER AND RESTROOM FACILITIES) TO THE JOB SITE FOR USE BY ALL CONSTRUCTION TRADES, INCLUDING THOSE NOT A SUBCONTRACTOR TO THE GENERAL CONTRACTOR. CONTRACTOR TO PROVIDE PROTECTION AS REQUIRED. ANY DAMAGE TO THESE FACILITIES SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 7. ALL CONTRACTORS SHALL CONTACT BUILDING MANAGEMENT TO DETERMINE THE BUILDING OWNER'S RULES FOR CONSTRUCTION, DELIVERIES, CONSTRUCTION TASKS TO BE PERFORMED OUTSIDE REGULAR BUSINESS HOURS ONLY, AND ANY OTHER SPECIAL BUILDING REQUIREMENTS WHICH WILL AFFECT THE WORK. IF OVERTIME WORK IS REQUIRED BY ANY TRADE, APPROVAL (INCLUDING COST APPROVAL) MUST BE OBTAINED PRIOR TO THE EXECUTION OF ANY WORK. THE GENERAL INTENT IS THAT ALL WORK EXCEPT FOR NOISE-GENERATING CONSTRUCTION SHALL BE PERFORMED ON REGULAR TIME. 8. THE CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET OF CONSTRUCTION DRAWINGS ON SITE DURING ALL CONSTRUCTION PHASES FOR THE USE OF ALL TRADES. THE CONTRACTOR SHALL SEE THAT ALL SUBCONTRACTORS RECEIVE COMPLETE SETS OF CONSTRUCTION DRAWINGS, AT ALL TIMES DURING THE PROGRESS OF THE JOB (I.E. REVISIONS) ON A TIMELY BASIS, OR ASSUME FULL RESPONSIBILITY FOR COORDINATION OF WORK WHEN COMPLETE SETS ARE NOT AVAILABLE TO SUBCONTRACTORS. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL WORK AND MATERIALS IN CONFORMANCE WITH ANY CODE OR CODES OF FEDERAL, STATE, COUNTY OR MUNICIPALITY HAVING JURISDICTION OVER SUCH WORK. ALL APPLICABLE REQUIREMENTS IN THESE REGULATIONS SHALL BE FOLLOWED THE SAME AS IF NOTED ON THE DRAWINGS. CONFLICTS BETWEEN WORK SET FORTH ON THE DRAWINGS AND BUILDING CODES, LAWS OR REGULATIONS NOTED BY THE GENERAL CONTRACTOR SHALL BE SUBMITTED TO DLR GROUP FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK. 10. THE CONTRACTOR SHALL, AT ALL TIMES, KEEP PREMISES FREE FROM ALL ACCUMULATION OF DEBRIS CAUSED BY HIS OPERATIONS. AT THE COMPLETION OF THE WORK, SHALL CLEAN ALL GLASS AND WOOD SURFACES AND LEAVE THE WORK "BROOM CLEAN." SHALL ALSO CLEAN ALL LIGHT FIXTURES. 11. THE GENERAL CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND OTHER ITEMS NECESSARY FOR THE COMPLETION OF ALL WORK SHOWN, CALLED FOR, OR REASONABLY IMPLIED BY THE CONTRACT DOCUMENTS EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE. 12. WHERE WORK OR EQUIPMENT IS INDICATED AS N.I.C., SUCH WORK AND/OR EQUIPMENT SHALL BE PROVIDED BY OTHERS. CONTRACTOR SHALL COORDINATE AND COOPERATE TO EFFECT SUCH INSTALLATION. 13. ALL REQUESTS FOR CLARIFICATION OF THESE DRAWINGS SHALL BE DIRECTED TO DLR GROUP CONFLICTS ARISING BETWEEN DETAILS AND/OR PLANS SHALL BE BROUGHT TO THE ATTENTION OF DLR GROUP FOR CLARIFICATION IN WRITING BY THE CONTRACTOR BEFORE PROCEEDING WITH THE WORK. 14. ALL WORK ON DRAWINGS SHALL BE PERFORMED IN CONFORMANCE WITH REQUIREMENTS OF THE LEASE WORK LETTER AND BUILDING STANDARD SPECIFICATIONS, U.O.N. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ACQUAINT HIMSELF WITH ALL SUCH SPECIFICATIONS AND REGULATIONS WHETHER OR NOT LISTED ON DRAWINGS AND/OR INCLUDED HEREIN. 15. NO EXTRA WORK OR CHARGE SHALL BE MADE UNLESS A WRITTEN COUNTERSIGNED ORDER FROM THE OWNER, SIGNED OR COUNTERSIGNED BY DLR GROUP, OR A WRITTEN ORDER FROM DLR GROUP, IS OBTAINED. THIS ORDER SHALL STATE THAT THE TENANT HAS AUTHORIZED THE EXTRA WORK OR CHARGE, AND NO CLAIM FOR ANY ADDITIONAL SUM SHALL BE VALID UNLESS SO OFFERED AND PRESENTED AS DESCRIBED ABOVE. 16. GENERAL CONTRACTOR IS RESPONSIBLE FOR REVIEWING AND VERIFYING DEMOLITION PLANS IN RELATION TO STRUCTURAL AND/OR CONSTRUCTION DRAWINGS. DLR GROUP IS TO BE NOTIFIED OF ANY CONFLICTS, DISCREPANCIES OR PROBLEMS. 17. GENERAL CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL MENTIONED EQUIPMENT FOR THE PANTRIES AS REQUIRED U.O.N. VERIFY WITH DLR GROUP 18. GENERAL CONTRACTOR WILL BE HELD FULLY RESPONSIBLE FOR ALL COORDINATION OF SCOPE OF WORK BETWEEN ARCHITECTURAL & ENGINEERING DWGS. THE MOST COSTLY SCOPE OF WORK WILL BE ASSUMED @ NON-COORDINATED ISSUES. GENERAL CONTRACTOR TO COORDINATE WITH DLR GROUP TO RESOLVE CONFLICTS PRIOR TO THE COMMENCEMENT OF THE WORK. 19. THE BUILDING VENTILATION SYSTEM MAY UTILIZE THE ABOVE CEILING AREA AS A RETURN AIR PLENUM. ALL WALL TYPES MUST ALLOW UNOBSTRUCTED AIR RETURN THROUGH THE PLENUM. CONTRACTOR SHALL CONFIRM IF SMOKE / FIRE DAMPERS WILL BE REQUIRED AT FIRE RATED WALLS AND IF TRANSFER DUCTS ARE SUFFICIENT AT NON-FIRE RATED WALLS. 20. UNLESS COMMON AREA IS EXCLUDED FROM THE SCOPE OF WORK, CONTRACTOR IS RESPONSIBLE TO PROVIDE ELEVATOR LOBBY & EQUIPMENT AS REQUIRED TO BE CODE COMPLIANT. CONTRACTOR TO PROVIDE NEW HANDICAP SIGNAGE AT ALL ELEVATOR CAB LOCATIONS INSIDE AND OUT IN THE IMMEDIATE AREA AROUND THE SYSTEM IF REQUIRED BY PROJECT. 21. CONTRACTOR TO PROVIDE SIGNS: "WARNING ALARMED DOOR" AT ALL FIRE EXIT DOORS IN STAIR SHAFTS IF REQUIRED BY PROJECT. 22. CONTRACTOR TO RECESS ELEVATOR SILLS (TYPICAL) IN CONCRETE SLAB AS REQUIRED TO OBTAIN CONTINUOUS FLOOR SURFACE IF REQUIRED BY PROJECT 23. THE GENERAL CONTRACTOR, SUBCONTRACTOR, OR TENANT'S VENDOR MUST CERTIFY THAT ALL MATERIALS AND EQUIPMENT USED OR INSTALLED ON THIS JOB ARE FREE OF ANY ASBESTOS CONTAINING MATERIALS ("ACM") OR POLYCHLORINATED BIPHENYL ("PCB'S"). 24. PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE FOLLOWING DOCUMENTS MUST BE SUBMITTED TO THE LANDLORD: A. CONTRACTOR'S INSURANCE CERTIFICATE. B. A COPY OF BUILDING PERMIT. C. A COPY OF CONTRACT AGREEMENT BETWEEN TENANT/LANDLORD & CONTRACTOR. D. A COMPLETE PROJECT TEAM DIRECTORY WITH EMERGENCY PHONE NUMBERS. E. A PROJECT SCHEDULE NOTING CRITICAL PATH ITEMS AND TARGET COMPLETION DATE. 25. G.C. SHALL HAVE A FIELD OFFICE WITH A TABLE & CHAIRS FOR WEEKLY MEETINGS. CONTRACTOR WILL BE REQUIRED TO HAVE A LAPTOP WITH AN E-MAIL CONNECTION. CONTRACTOR WILL BE REQUIRED TO TAKE WEEKLY DIGITAL PHOTOS OF THE PROJECT AT LOCATIONS SELECTED BY DLR GROUP PHOTOS WILL BE DISTRIBUTED WEEKLY. 26. CONTRACTOR IS RESPONSIBLE FOR WEEKLY PROJECT MEETING MINUTES WHICH SHALL REFLECT THE ISSUES RELATED TO THE PROJECT, INCLUDING ACTION ITEMS WITH DUE DATES. 27. ALL INDOOR FURNITURE PLACED IN THE ATRIUM AREA MUST HAVE THE MATERIALS FROM WHICH THEY ARE MADE APPROVED BY THE FIRE DEPARTMENT, IF REQUIRED BY PROJECT. 28. ARCHITECTURAL DRAWINGS, AS PART OF THE CONTRACT DOCUMENTS, INDICATE INFORMATION SUFFICIENT TO CONVEY DESIGN INTENT, AND DO NOT INDICATE MEANS AND/OR METHODS OF CONSTRUCTION. CONSTRUCTION MEANS AND METHODS USED TO DELIVER THE DESIGN INTENT ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND/OR THEIR SUB-CONTRACTORS. PERFORM CONSTRUCTION MEANS, METHODS, SEQUENCES, TECHNIQUES AND PROCEDURES COMPLYING WITH NATIONAL, STATE AND LOCAL BUILDING CODES AND SAFETY ORDINANCES. 29. CONTRACTOR TO PROVIDE CODE COMPLIANT FIRE STOPPING @ ALL NEW FLOOR PENETRATIONS THROUGHOUT WITH PATCH TO MAINTAIN EXISTING FIRE RATING OF FLOOR SLAB. 30. WITHIN AREA OF WORK, CONTRACTOR SHALL SURVEY ALL EXISTING FINISHED SURFACES TO REMAIN SUCH AS CORNER BEADS, STOPS, CEILING GRID & TILES, PLASTER CEILING, FINISHED FLOOR SLABS, ETC. FOR CHIPS, CRACK HOLES, DAMAGED SURFACES, AND ANY OTHER DEFECTS CAUSING AN APPEARANCE DIFFERENT FROM A NEW FIRST CLASS FINISHED REPAIRING, THEN CONTRACTOR SHALL REMOVE EXISTING AND INSTALL NEW SURFACES TO THE SATISFACTION OF DLR GROUP 31. CONTRACTOR IS RESPONSIBLE TO VERIFY STRUCTURAL SLAB SUPPORT CAPABILITY AS REQUIRED AT NEW FILE ROOMS FOR ALL STRUCTURAL DESIGN-BUILD JOBS. NOTIFY DLR GROUP WHETHER STRUCTURAL REINFORCEMENT IS NECESSARY OR NOT. 32. ALL EXTERIOR GLASS MULLIONS SHALL BE CLEANED AND HOLES REPAIRED. 33. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL CONSTRUCTION CLEANUP, CLEANING OF ALL INTERIOR GLASS SURFACES AND SHALL PROVIDE OFFICE CLEANUP SERVICE(S) (CARPET, WOOD SURFACES, ETC.) FOR THE LAST MINUTE CLEANUP AT ODD HOURS (EVENINGS, WEEKENDS, ETC.). ARRANGEMENTS SHALL BE MADE TO HAVE ALL EXTERNAL WINDOW SURFACES CLEANED WITHIN TWO (2) WEEKS OF MOVE-IN/OCCUPANCY. THE G.C. SHALL COORDINATE ALL CLEANUP WITH BUILDING REPRESENTATIVES AND DLR GROUP 34. UPON COMPLETION OF THE JOB, THE GENERAL CONTRACTOR SHALL SUBMIT CERTIFICATES OF INSPECTION OF SATISFACTORY COMPLETION TO DLR GROUP. 35. GENERAL CONTRACTOR SHALL PROVIDE A FINAL PUNCH LIST FOR DLR GROUP'S APPROVAL. THREE (3) COPIES OF THE CLOSE-OUT PACKAGE INCLUDING AS-BUILT DWGS, WARRANTIES ETC. AT PROJECT COMPLETION. 36. THIS SET OF DOCUMENTS IS FOR INTERIOR DESIGN CONSTRUCTION ONLY. REFER TO SHELL AND CORE DOCUMENTS PROVIDED BY THE LANDLORD FOR INFORMATION PERTAINING TO THE EXISTING BUILDING. GENERAL NOTES 1. REFER TO DEMOLITION PLAN FOR EXTENT OF DEMOLITION WORK. 2. INSTALL TEMPORARY WALK-OFF CARPET AT ALL ENTRANCES TO THE JOB SITE. CARPET IS TO BE KEPT DAMP AT ALL TIMES. 3. CONTRACTOR IS RESPONSIBLE TO TAKE ALL PRECAUTIONS TO RESTRICT ACCESS TO DANGEROUS AREAS BY OUTSIDE PERSONNEL. TO THIS END, BARRIERS AND SIGNS SHALL BE ERECTED THROUGHOUT DEMOLITION AND CONSTRUCTION. 4. CONTRACTOR SHALL REPAIR IMMEDIATELY ANY DAMAGE DONE TO THE BUILDING ELEMENTS DUE TO DEMOLITION & CONSTRUCTION TO AVOID DISRUPTION OF BUSINESS AND/OR FURTHER DETERIORATION. DAMAGE TO THE BUILDING ELEMENTS WILL BE CONSIDERED FULLY REPAIRED ONLY AFTER AN APPROVAL BY THE BUILDING MANAGEMENT AND DLR GROUP IS OBTAINED. ANY DAMAGE OCCURRING TO THE CONCRETE SLAB SHALL BE REPAIRED TO DUPLICATE THE ORIGINAL CONSTRUCTION. (APPLIES TO DAMAGE DONE TO WOOD FLOORS AS WELL). 5. CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE REMOVAL FROM THE JOB SITE OF ALL VARIOUS VENDOR DEBRIS (CONSTRUCTION MATERIALS /WASTE /WRAPPING/PACKAGES, ETC.). DURING THE ENTIRE COURSE OF THE PROJECT, WITH PARTICULAR ATTENTION TO SAME DURING LAST WEEK(S) OF THE JOB, DURING FURNITURE/EQUIPMENT INSTALLATION AND IMMEDIATELY PRIOR TO MOVE-IN. (THIS SHALL INCLUDE REMOVALS OF PACKAGING FROM TELEPHONE/COMM. & FURNITURE VENDORS). THE G.C. SHALL MAKE AVAILABLE SAME SERVICE SUBSEQUENT TO MOVE-IN AND TO COORDINATE EXPECTED REMOVALS AS JOB APPROACHES MOVE-IN. 6. CONTRACTOR TO VERIFY IF ANY DEMOLISHED WALLS OR COLUMN FURRINGS CONTAIN MECHANICAL OR PLUMBING & ADVISE DLR GROUP PRIOR TO DEMO. 7. SAVE AND STORE ALL LIGHT FIXTURES, EXIT SIGNS, DOOR ASSEMBLIES & HARDWARE FOR RE-USE, OR TO BE STORED BY BLDG. MANAGEMENT, U.O.N. 8. ALL PARTITIONS, FLOORS, CEILINGS, AND ADJACENT SURFACES SHALL BE PATCHED OR REPAIRED AS REQUIRED FOR FINISH APPLICATIONS. PATCHED AND REPAIRED SURFACES SHALL BE EQUAL TO NEW. THE CONTRACTOR SHALL ADVISE DLR GROUP OF ANY EXISTING CONSTRUCTION WHICH IS NOT LEVEL AND PLUMB (WITHIN INDUSTRY STANDARDS) BEFORE START OF CONSTRUCTION. FLOOR PREP SHOULD THEREFORE BE INCLUDED IN THE JOB BID. 10. ALL TRADES TO INSPECT EXISTING SITE CONDITIONS PRIOR TO SUBMITTING BIDS. CONTRACTOR TO NOTIFY DLR GROUP OF ANY CONFLICTS WITH THE WORK. 11. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS NOT TO BE CONSIDERED A RECORD DRAWING OF EXISTING CONDITIONS. 12. REMOVE EXISTING PARTITIONS, DOORS, FRAMES, HARDWARE, MILLWORK, AT AREAS INDICATED ON PLAN. PROVIDE ADEQUATE PROTECTION OF ADJACENT SURFACES NOT INCLUDED IN THE DEMOLITION. 13. CONTRACTOR TO WALK JOBSITE AND INCLUDE REMOVAL OF OTHER MISC. ITEMS NOT SHOWN AND ARE NOT RETAINED OR REUSED IN THE CONSTRUCTION PLAN. 14. REMOVE ABANDONED ELECTRICAL CONDUIT, J-BOX, PANELS, FIXTURES, WIRING, ETC., AT PARTITIONS TO BE REMOVED. WIRING AND CONDUIT SHALL BE REMOVED TO POINT OF ORIGIN OR TO THE FIRST ITEM UNAFFECTED BY THE REMOVAL. CONDUIT WHICH IS BURIED OR OTHERWISE INACCESSIBLE SHALL BE ABANDONED. IN SUCH CASES, CONTRACTOR SHALL PULL ALL WIRE FROM CONDUIT, CUT BACK CONDUIT FLUSH WITH FINISHED FACE AND FILL ALL OPENINGS. 15. ALL ABANDONED SYSTEMS, I.E. PIPING, DUCTWORK, CABLING, ETC. ARE TO BE REMOVED TO POINT OF ORIGIN AND CAPPED. 16. SEE DEMOLITION NOTES PREPARED BY MEP/ ENGINEERS FOR ADDITIONAL INFORMATION AND REQUIREMENTS FOR DEMOLITION OF ELECTRICAL, HEATING, VENTILATING, AIR CONDITIONING, VOICE/DATA, ETC. ITEMS AS WELL AS COORDINATION OF DEMOLITION ITEMS. 17. EXISTING EXTERIOR WINDOW TREATMENT TO REMAIN U.O.N. PROTECT DURING DEMO / CONSTRUCTION. 18. CONTRACTOR TO PROVIDE FLOOR AND SLAB PATCH AT FLOOR FOR ALL PENETRATIONS. 19. ALL EQUIPMENT AND MATERIAL WHICH IS IN OPERATING CONDITION WHEN REMOVED, SHALL BE MAINTAINED AS SUCH AND RETURNED AS PER OWNER'S REQUIREMENTS. 20. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE IDENTIFICATION, ABATEMENT AND PROPER DISPOSAL OF ANY AND ALL ASBESTOS/TOXIC MATERIALS THAT MAY EXIST AT THE JOB SITE. DEMOLITION NOTES 1. GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND REQUEST CLARIFICATION FROM DLR GROUP, REGARDING DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS BEFORE COMMENCING ANY WORK. 2. CONTRACTOR TO SNAP/SPRAY LOCATION OF ALL FIXTURES, WALLS, MILLWORK, OUTLETS, LIGHTS, ETC. FOR DLR GROUP APPROVAL PRIOR TO ANY CONSTRUCTION STARTING. ONCE DLR GROUP APPROVES ALL LAYOUTS, THEN CONTRACTOR CAN PROCEED WITH THE PROJECT. DLR GROUP SHALL BE NOTIFIED OF ANY DEVIATION FROM DIMENSIONS OR CLEARANCES INDICATED ON PLANS REQUIRED DUE TO FIELD CONDITIONS. 3. PARTITIONS ARE DIMENSIONED FROM FINISH TO FINISH, U.O.N. CENTER LINE OF PARTITION TO ALIGN WITH CENTER LINE OF MULLION WHERE OCCURS, U.O.N. 4. ALL "HOLD" DIMENSIONS MUST BE MAINTAINED. 5. ALL PARTITIONS SHOWN AS "ALIGN" ARE TO BE SMOOTH AND FLUSH WITH EXISTING CONSTRUCTION. 6. ALL DIMENSIONS OF GLASS PARTITIONS ARE GIVEN FROM CENTERLINE TO CENTERLINE, U.O.N. 7. ALL PARTITIONS SHALL BE ANCHORED PER MANUFACTURERS' SPECIFICATIONS AND AS REQUIRED BY APPLICABLE BUILDING CODES. FOR PARTIAL HEIGHT OR CEILING HEIGHT PARTITIONS, TOP TRACK OF FRAMING TO BE SECURELY ATTACHED TO STRUCTURE ABOVE WITH METAL STUD KICKERS EVERY 4'-0" ON CENTER IN ALTERNATING DIRECTIONS AT 45 DEGREES FOR LATERAL SUPPORT PER CODE REQUIREMENTS. 8. PARTITIONS EXTENDING TO THE SLAB, SHALL BE SEALED TO THE SLAB, PERIMETER WALLS AND AROUND PENETRATIONS TO FORM THE PLENUM. 9. AT ALL POINTS WHERE PARTITIONS INTERSECT WINDOW MULLIONS, SOUND DEADENING MATERIAL IS TO BE INSTALLED WITHIN CONVECTOR PLENUM. PROVIDE NEOPRENE GASKET WITH 2045 SHEET METAL CAP. CONNECTION SHALL HAVE THE SAME IF NOT GREATER STC RATING AS THE PARTITION ASSEMBLY OR PER REFERENCED DETAIL. 10. PROVIDE METAL CORNER BEADS AT ALL DRYWALL PARTITION CORNERS AND ENDS. 11. WHERE REQUIRED, PROVIDE FURRING OR MINIMUM ADDITIONAL PARTITION THICKNESS WITH CONTINUOUS INSULATION FOR PLUMBING WALLS. 12. ALL PTD./MTL. GYP. BD. WALL/CEILING REVEALS SHALL BE CONTINUOUS WITH WELDED AND MITERED CONNECTIONS TYPICAL. 13. ALL ROUGH AND FINISHED CARPENTRY, INCLUDING WOOD BLOCKING, WOOD DOORS, DOOR AND WINDOW FRAMES WILL BE FIRE RETARDANT TREATED AS REQUIRED TO COMPLY WITH THE REQUIREMENTS OF THE BUILDING CODE AND OTHER APPLICABLE CODES FOR COMBUSTIBILITY FLAME SPREAD RATING. 14. WHERE METAL STUD FRAMING ADJOINS METAL DUCTS OR PIPES, OR WHERE TWO METALS ARE AFFIXED TO EACH OTHER, THE GENERAL CONTRACTOR WILL PROVIDE INSULATING MATERIAL BETWEEN SO THAT NO VIBRATION OR NOISE WILL BE TRANSMITTED. ALL LOCATIONS ARE TO BE BROUGHT TO DLR GROUP'S ATTENTION. 15. CONTRACTOR TO PROVIDE SOUND RESISTANT SEALANT AT WHEREVER CONDUIT, J-BOXES, PLUMBING PIPES, ETC. OCCUR. PIERCE ACOUSTICAL PARTITIONS OR CEILINGS. CONTRACTOR TO OBTAIN "EQUAL TO" STC/NRC RATINGS AT PARTITIONS WITH NO PIERCING. 16. AT ALL RATED PARTITIONS AND PARTITIONS OR BAFFLES EXTENDING TO THE FLOOR STRUCTURE ABOVE WILL BE SCALED TO THAT STRUCTURE, TO PERIMETER WALLS AND AROUND ANY PENETRATIONS SUCH AS PIPES OR DUCTS. WHERE A DUCT OR OTHER CONSTRUCTION RUNS PARALLEL WITH A RATED PARTITION, OFFSET THAT PARTITION ABOVE THE CEILING AROUND THE CONSTRUCTION TO MAINTAIN THE FIRE RATING. ALL SUCH CONDITIONS SHOULD BE IDENTIFIED ON THE COORDINATION DRAWINGS AND SUBMITTED TO THE DLR GROUP FOR APPROVAL. 17. ALL GYPSUM WALL BD. USED WILL BE 5/8" FIRE CODE TYPE "X" BY U.S.G., U.O.N. 18. GENERAL CONTRACTOR TO SCAR PATCH ALL CORE WALLS AND PERIMETER BASE BUILDING WALLS SCARRED FROM DEMOLITION OR EXISTING CONDITIONS AS REQUIRED. 19. GENERAL CONTRACTOR TO PROVIDE 1/8" WIDE BUTT JOINTS AT ALL GLASS TO GLASS CONNECTIONS AND MITERED GLASS AT ALL GLASS TO GLASS CORNERS, U.O.N.. GENERAL CONTRACTOR TO PROVIDE CLEAR SILICONE @ ALL GLASS JOINTS AS DIRECTED IN THE FIELD BY DLR GROUP, U.O.N. 20. CONTRACTOR IS RESPONSIBLE TO COORDINATE DEPTH OF FIRE EXTINGUISHER CABINET WITH NEW PARTITIONS. CONTRACTOR TO THICKEN SPECIFIED PARTITION AS REQUIRED TO INSTALL CABINET CORRECTLY AS MANUFACTURED RECOMMENDS. CONTRACTOR TO THICKEN PARTITION AS REQUIRED TO HOLD NEW CABINET. PARTITIONS TO BE THICKENED FOR ENTIRE LENGTH OF WALL. 21. ALL SURFACES SCHEDULED TO RECEIVE WALL COVERING MUST BE LEVEL "5" FINISH. 22. CONTRACTOR SHALL PROVIDE A MINIMUM OF LEVEL "4" FINISH ON ALL GYP. BD. WALLS PRIOR TO PAINTED FINISH APPLICATION. NEW PARTITIONS SHALL BE APPROVED FOR FINISH BY DLR GROUP AS REQUIRED PRIOR TO PAINTING. CONTRACTOR TO PUT IN WRITING AND NOTIFY DLR GROUP IF THEY ARE PROVIDING A FINISHED LEVEL LESS THAN "4". 23. CONTRACTOR SHALL PROVIDE TEMPERED GLASS AS REQUIRED BY CODE AT SCHEDULED GLASS PARTITIONS. 24. THE GENERAL CONTRACTOR WILL DOUBLE UP METAL STUDS AT ALL DOORS AND WINDOW OPENINGS UNLESS OTHERWISE NOTED. 25. PROVIDE WATER RESISTANT GYPSUM BOARD IN ALL TOILET ROOMS AND SHOWER ROOMS. IF THE TOILET ROOMS OR SHOWER ROOMS PROPOSED 3/8" THK OR MORE STONE WALL TILES, THEN CONTRACTOR SHALL PROVIDE CEMENT ROCK WALL BOARD IN LIEU OF WATER RESISTANT GYPSUM BOARD. 26. G.C. SHALL SUPPLY ALL RETURN AIR OPENINGS IN SLAB TO SLAB PARTITIONS ABOVE CEILINGS AS REQUIRED BY ENGINEERING DRAWINGS. ALL OPENINGS IN DEMISING AND SOUND-ATTENUATED PARTITIONS SHALL HAVE SOUND BOOTS AND ALL OPENINGS IN FIRE-RATED PARTITIONS SHALL HAVE FIRE DAMPERS AS REQUIRED BY LOCAL BUILDING CODES. CONTRACTOR SHALL COORDINATE WITH ENGINEERING DRAWINGS AND INFORM DLR GROUP OF DISCREPANCIES PRIOR TO BIDDING. 27. CONTRACTOR SHALL COORDINATE WITH FURNITURE VENDOR TO SIGN OFF ON WALL LAYOUT LAYOUT WHERE NEW/RELOCATED SYSTEMS FURNITURE OCCURS. 28. AT RESTROOMS, CONTRACTOR SHALL INCREASE SIZE STUD DEPTHS (3 5/8" MIN.) AND SPACING TO ACCOMMODATE PLUMBING FIXTURES & ACCESSORIES (I.E. TOILET DISPENSER). 29. CONSTRUCT NEW PARTITIONS AS CALLED OUT ON PLAN. PROVIDE AND INSTALL NEW DOORS, FRAMES AND HARDWARE. 30. PROVIDE MIN. FURRING AT ALL EXPOSED COLUMNS. U.O.N. PREP ALL EXISTING COLUMNS AS REQUIRED TO RECEIVE NEW SPECIFIED FINISHES. 31. CONTRACTOR SHALL PROVIDE BRACING FOR ALL DEMOUNTABLE FURNITURE SYSTEM WALLS AS REQUIRED PER CODE. REFER TO FURNITURE PLANS COORDINATE WITH FURNITURE PROVIDER FOR LOCATION OF DEMOUNTABLE WALLS. 32. PENETRATIONS TO EXISTING RATED CORE WALL, ELEVATOR, STAIR, MECHANICAL/PLUMBING SHAFT WALLS ARE NOT ALLOWED. FURRING PARTITIONS NEED TO BE SPECIFIED FOR ELECTRICAL AND DATA/COMMUNICATIONS OUTLETS AT CORE WALLS WITH THE EXCEPTION OF MECHANICAL ROOM WALLS. PARTITION NOTES 1. FABRICATION MATERIALS OF METAL SUSPENSION SYSTEMS FOR ACOUSTICAL TILE AND LAY-IN PANEL CEILINGS SHALL CONFORM WITH LOCAL CODE REQUIREMENTS. 2. REWORK EXISTING FIRE/LIFE SAFETY DEVICES AS REQUIRED AND SHALL BE FILED UNDER SEPARATE PERMIT. 3. CEILING CONTRACTOR SHALL PROVIDE ALL NECESSARY BRIDGING, BLOCKING, CUTOUTS, AND GROUNDS REQUIRED FOR THE INSTALLATION OF ALL LIGHTING FIXTURES, SPEAKERS, DIFFUSERS, GRILLS, REGISTERS, ACCESS PANELS, SPECIAL MILLWORK, ETC. AS INDICATED ON OR REQUIRED BY THE DRAWINGS. 4. THE GENERAL CONTRACTOR & CEILING CONTRACTOR SHALL CLOSELY COORDINATE THEIR WORK WITH THAT OF THE ELECTRICAL, H.V.A.C., PLUMBING, TELEPHONE AND MILLWORK CONTRACTORS, WHEREVER THEIR RESPECTIVE WORK IS CONTIGUOUS. NO EXTRAS WILL BE APPROVED FOR CUTTING, PATCHING OR REPLACING OF BROKEN TILES. 5. ALL EXHAUST FANS SHALL BE SILENT RUNNING AND HAVE A MINIMUM 8'-0" LONG DUCT BETWEEN THE RETURN AIR GRILLE AND THE FAN MOTOR. DUCT SHALL BE LINED WITH 1" THICK FIBERGLASS LINER: AN EQUIVALENT LENGTH OF GLASS FIBER FLEXIBLE DUCT IS ACCEPTABLE. DO NOT LOCATE FAN MOTOR ABOVE CEILING OF ROOM SERVED BY FAN. LOCATE MOTORS ABOVE CORRIDOR OR OPEN AREA CEILINGS. COORDINATE EXACT LOCATION WITH DLR GROUP BEFORE INSTALLATION. 6. WHERE CEILINGS ARE SPECIFIED TO BE FIRE-RATED CONSTRUCTION, ALL RECESSED LIGHT FIXTURES AND SPEAKERS SHALL BE BOXED OUT ABOVE THE CEILING WITH A FIRE-RATED ENCLOSURE EQUAL TO THE RATING OF THE CEILING. 7. ALL SPRINKLER HEADS SHALL BE FULLY CONCEALED, RECESSED SPRINKLER HEADS IN BOTH SHEET ROCK AND ACOUSTIC CEILINGS. SPRINKLER HEAD COVERS SHALL BE FACTORY SPRAYED TO MATCH ADJACENT CEILING FINISH. ALL SPRINKLER HEADS ARE TO BE MTD. IN THE CENTER OF ACOUSTIC CEILING TILES. AT SHEET ROCK CEILINGS GENERAL CONTRACTOR TO VERIFY WITH DLR GROUP IN THE FIELD THEIR EXACT LOCATION BEFORE INSTALLATION. 8. CEILINGS IN CLOSETS OR BEHIND FASCIAS SHALL BE OF SAME HEIGHT AND MADE OF THE SAME MATERIAL AND FINISH AS THAT OF ADJOINING SPACES U.O.N. 9. THE GENERAL CONTRACTOR SHALL PROVIDE THE OWNER WITH 5% OF ADDITIONAL CEILING TILES TO MATCH NEW INSTALLED TILES. 10. ALL CEILING MOUNTED EXIT SIGNS ARE TO BE MOUNTED IN THE CENTER OF CEILING TILE. 11. CONTRACTOR TO PROVIDE ALL FRAMELESS ACCESS PANELS @ NEW/EXISTING PAINTED GYP. BD. CEILINGS THROUGHOUT. CONTRACTOR TO CONFIRM EXACT MOUNTING LOCATION OF ACCESS PANELS WITH ARCHITECT PRIOR TO LOCATION. 12. CONTRACTOR TO RELAMP ALL EXISTING TO REMAIN FIXTURES WITH BULBS THAT ARE CONSISTENT WITH BUILDING STANDARD TEMPERATURE. CONTRACTOR TO CONFIRM LAMP TEMPERATURE PRIOR TO REPLACING. CONTRACTOR TO REPLACE ALL EXISTING FIXTURES NOT WORKING & CLEAN ALL EXISTING LIGHT LENSES THROUGHOUT WORK AREAS. REPLACE ALL BALLASTS NOT WORKING PROPERLY. 13. CONTRACTOR TO PATCH ALL EXISTING FIREPROOFING THROUGHOUT WITH PATCHES TO MATCH THE CONSISTENCY OF THE EXISTING FIREPROOFING. 14. CONTRACTOR TO CENTER ALL ACOUSTICAL TILE CEILING ASSEMBLIES IN AS NOTED THROUGHOUT WITH EQUAL/EQUAL SPACING BETWEEN WALL LAYOUTS, U.O.N. 15. ALL TRADES TO INSPECT EXISTING SITE CONDITIONS PRIOR TO SUBMITTING BIDS. CONTRACTOR TO NOTIFY DLR GROUP OF ANY CONFLICTS WITH THE WORK. 16. CONTRACTOR TO CONFIRM THAT ALL LIGHT FIXTURES ARE UL APPROVED. 17. RECESSED DOWNLIGHTS AND WALLWASHERS TO BE CENTERED WITHIN 2'x2' ACOUSTIC CEILING TILE U.O.N. 18. SWITCHING/ OCCUPANCY SENSORS AND LIGHTING IS SHOWN FOR LOCATION ONLY. ALL LIGHTING SHALL CONFORM TO TITLE 24 REQUIREMENTS. 19. ALL FIRE/LIFE/SAFETY EQUIPMENT AND SPRINKLER HEADS SHALL BE CENTERED WITHIN 2'x2' ACOUSTIC CEILING TILE. 20. ALL EXIT LIGHTING TO BE CONNECTED TO BUILDING'S EMERGENCY ELECTRICAL CIRCUIT SYSTEM. 21. REFER TO MEP DRAWINGS FOR RELOCATION OR RECONFIGURATION OF EXISTING BUILDING RISERS, DUCTS OR PIPING IN RENOVATED AREAS. 22. REWORK H.V.A.C. AS REQUIRED PER DESIGN-BUILD ENGINEERING OR MECHANICAL ENGINEER CONSULTANT'S DRAWINGS. 23. GENERAL CONTRACTOR TO VERIFY EXIT SIGN LOCATIONS WITH FIRE INSPECTOR AND ADD NEW AS REQUIRED. 24. REWORK ALL EXISTING SPRINKLER SYSTEM AS REQUIRED. THIS WORK TO BE FILED UNDER SEPARATE PERMIT, PROVIDE CONCEALED HEADS AT GYP. BD. CEILING, TYP. 25. REPAINT ALL EXISTING DIFFUSERS AND RETURN SUPPLY GRILLS TO MATCH CEILING WHITE FINISH AS REQUIRED U.O.N. 26. VERIFY THERMOSTAT CONTROL LOCATIONS WITH DLR GROUP PRIOR TO INSTALLATION. 27. CONTRACTOR TO CAULK CEILING TILE AT ALL WALL TRANSITIONS TO CONCEAL GAPS. 28. CONTRACTOR TO PITCH DRYWALL CEILING AT SHOWER ROOMS FOR MOISTURE RUNOFF. 29. CONTRACTOR TO THOROUGHLY CLEAN ALL LIGHT FIXTURES JUST PRIOR TO MOVE-IN AND REMOVE ALL STICKERS. CEILING NOTES 1. H.V.A.C. CONTRACTOR SHALL SUBMIT DUCTWORK TO DLR GROUP FOR APPROVAL OF SUPPLY DIFFUSER AND RETURN REGISTER, T-STATS AND VAV BOX LOCATIONS BEFORE STARTING WORK. NOTIFY DLR GROUP OF ANY DISCREPANCIES IN CEILING HEIGHTS DUE TO PLACEMENT OF ANY H.V.A.C. COMPONENTS. 2. H.V.A.C. CONTRACTOR SHALL VERIFY ADEQUATE CLEARANCES FOR ALL AIR CONDITIONING UNITS, DUCTWORK, ETC.. AGAINST RECESSED FIXTURES, PIPING, BEAMS, ETC. AND BRING ALL UNWORKABLE CONDITIONS TO THE ATTENTION OF DLR GROUP PRIOR TO THE INSTALLATION OF ANY MECHANICAL EQUIPMENT. 3. H.V.A.C. CONTRACTOR SHALL VERIFY ALL THERMOSTAT, DIFFUSERS AND RETURN REGISTER LOCATIONS WITH DLR GROUP PRIOR TO INSTALLATION. AVOID TV LOCATIONS AND ACCENT WALLS WHERE POSSIBLE. 4. H.V.A.C. CONTRACTOR SHALL VERIFY THAT SITE CONDITIONS AND ENGINEERED MECHANICAL PLANS COINCIDE BEFORE COMMENCING WORK. 5. REFER TO ENGINEER'S DRAWINGS FOR LOCATIONS AND SIZES OF AIR CONDITIONING RELIEF OPENINGS REQUIRED IN PARTITIONS ABOVE CEILINGS. 6. VERIFY NO RETURN AIR GRILL IS WITHIN (1) ONE ACOUSTICAL TILE WITH A LIGHT FIXTURE OR WITHIN (1) ONE ACOUSTICAL TILE TO THE PERIMETER WALL SOFFIT. 7. ALL FRAMELESS, "TAPED TO" LINEAR DIFFUSERS & STANDARD DIFFUSERS SHALL BE SIZED AS REQUIRED TO PREVENT WHITE NOISE OCCURRING. HVAC NOTES NOTE: KIMLEY-HORN BUILD-OUT NOTES AND REQUIREMENTS SHALL COMPLY WITH THE CITY OF INDIANAPOLIS BUILDING STANDARDS CODE. 07/19/21