HomeMy WebLinkAboutKimley-Horn - Indianapolis - Bid Set 5.26.2021_A0.61© DLR GroupRevisions -ALL PROJECT
COMMUNICATION
TO BE SENT TO
MARK REED/MONICA BATES,
NOT AOR.5/25/2021 3:31:29 PMC:\Revit\_2020\KH Indianapolis Expansion CD's v_20_hgriffo.rvt23-21100-00
5.26.2021
BID/PERMIT
GENERAL NOTES
A0.61250 E. 96TH ST. #580INDIANAPOLIS, IN 46240INDIANAPOLIS, INDIANA1. ALL WORK SHALL CONFORM TO THE LATEST EDITIONS OF LOCAL BUILDING, PLUMBING, MECHANICAL,
ELECTRICAL, & ENERGY CODES. SEE DRAWING INDEX SHEET FOR APPLICABLE CODES AND ANY OTHER
LOCAL GOVERNING AGENCIES.
2. THE EXISTING FACILITIES INCLUDING, BUT NOT LIMITED TO SANITARY FACILITIES, DRINKING FOUNTAINS, AND
ELEVATORS ON ALL FLOORS, COMPLY WITH ACCESSIBILITY REQUIREMENTS.
3. THE EXISTING PATH OF TRAVEL FROM THE DESIGNATED HANDICAP PARKING SPACES AND THE PUBLIC SIDEWALK
PROVIDES A FREE AND UNOBSTRUCTED PASSAGE FOR ACCESS TO AND EGRESS FROM THE AREA OF
WORK. NO NEW WORK TO EXISTING PARKING GARAGE/STRUCTURE IS INCLUDED IN THIS SCOPE OF WORK
5. LIGHT AND CONTROL SWITCHES SHALL BE MOUNTED NOT MORE THAN 4'-0" ABOVE THE FLOOR OR
WORKING PLATFORM OR PER CURRENT ACCESSIBILITY REQUIREMENTS.
6. FLOORS OR LANDINGS LOCATED AT A DOORWAY SHALL BE NOT MORE THAN 1/2" LOWER THAN THE TOP
OF THE THRESHOLD, WHICH SHALL HAVE A 1/4" MAXIMUM VERTICAL EDGE AND A CHANGE IN LEVEL NOT
GREATER THAN 1:2.
7. A CLEAR AND LEVEL AREA SHALL BE PROVIDED ON EACH SIDE OF EXIT DOORS WITH A LENGTH OF AT
LEAST 60" IN THE DIRECTION OF THE DOOR SWING AND AT LEAST 48" IN THE OPPOSITE DIRECTION,
MEASURED AT RIGHT ANGLES THE DOOR IN ITS CLOSED POSITION. CONTRACTOR TO ADVISE DLR
GROUP OF ANY CONDITION NOT MEETING THESE REQUIREMENTS PRIOR TO CONSTRUCTION.
BUILDING DEPARTMENT NOTES
1. PROVIDE FIRE-RESISTANT RATED CONSTRUCTION AS REQUIRED. COMPLY WITH LOCAL CODE REQS.
2. FIRE-RESISTANT-RATED CONSTRUCTION SHALL COMPLY WITH LOCAL CODE REQUIREMENTS.
3. THROUGH PENETRATIONS AND MEMBRANE PENETRATIONS OF HORIZONTAL ASSEMBLIES AND FIRE-
RESISTANCE-RATED WALL ASSEMBLIES TO COMPLY WITH LOCAL CODE REQUIREMENTS.
4. OPENING ASSEMBLIES INTO FIRE-RESISTANT-RATED CONSTRUCTION TO COMPLY WITH LOCAL CODE REQS.
PROVIDE THE REQUIRED FIRE RESISTANCE RATING TO DOOR, AND WINDOW ASSEMBLIES, OPENING INTO FIRE
RATED WALLS.
5. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC WITHIN 75
FEET TRAVEL DISTANCE AND AT LEAST (1) PER 3,000 SF, TO ALL PORTIONS OF THE BUILDING ON EACH
FLOOR AND ANY ADDITIONAL FIRE EXTINGUISHERS AS REQUIRED BY FIRE DEPARTMENT FIELD INSPECTOR.
FIRE EXTINGUISHERS SHALL ALSO BE PROVIDED DURING CONSTRUCTION.
6. EXTEND AND MODIFY SPRINKLER & LIFE-SAFETY SYSTEMS AS REQUIRED BY CONSTRUCTION. CONTRACTOR
SHALL SUBMIT PLANS FOR APPROVAL AND SEPARATE PERMIT DIRECTLY TO THE DEPARTMENT OF BUILDING
AND SAFETY, PRIOR TO INSTALLATION.
7. THE PATH OF TRAVEL TO AND WITHIN EXITS IN THIS TENANT SPACE SHALL BE IDENTIFIED BY EXIT SIGNS
CONFORMING TO THE REQUIREMENTS OF LOCAL CODE. EXIT SIGNS SHALL BE READILY VISIBLE FROM
ANY DIRECTION OF APPROACH.
8. EXIT SIGNS SHALL BE LOCATED AS NECESSARY TO CLEARLY INDICATE THE DIRECTION OF EGRESS TRAVEL.
NO POINT SHALL BE MORE THAN 100 FEET FROM THE NEAREST VISIBLE SIGN. PROVIDE AS REQUIRED.
ADVISE DLR GROUP OF ADDITIONAL EXIT SIGNS. EXIT SIGNS SHALL BE ELECTRICALLY ILLUMINATED AND THE
LIGHT SOURCE SHALL BE ENERGIZED FROM SEPARATE CIRCUITS. ILLUMINATION SHALL NORMALLY BE
PROVIDED BY THE PREMISES WIRING SYSTEMS. IN THE EVENT OF THIS SYSTEM'S FAILURE, ILLUMINATION
SHALL BE AUTOMATICALLY PROVIDED FROM AN EMERGENCY SYSTEM. EMERGENCY LIGHTING SHALL GIVE A
VALUE OF FIVE FOOTCANDLES PER THE LOCAL CODE. WHENEVER THE BUILDING IS OCCUPIED, EXIT SIGNS SHALL
BE LIT SO THAT THEY ARE CLEARLY VISIBLE.
9. WHERE EXTERNALLY ILLUMINATED EXIT SIGNS ARE PROVIDED, SIGNAGE AND ILLUMINATION SHALL COMPLY
WITH THE LOCAL CODE.
10. ALL INTERIOR FINISHES SHALL CONFORM WITH THE LOCAL CODE REQUIREMENTS.
11. INTERIOR WALL AND CEILING FINISHES SHALL COMPLY WITH THE LOCAL CODE REQUIREMENTS.
12. ACOUSTICAL CEILING SYSTEMS THAT ARE PART OF FIRE-RESISTANCE-RATED CONSTRUCTION SHALL
COMPLY WITH THE LOCAL CODE REQUIREMENTS.
13. EXITS, EXIT LIGHTS, FIRE ALARM STATIONS, HOSE CABINETS AND EXTINGUISHER LOCATIONS SHALL NOT BE
CONCEALED.
14. EXISTING EXIT PATH LIGHTING OF ONE FOOTCANDLE SHALL BE PROVIDED AT STAIRWAY, HALLWAY, EXIT
PASSAGEWAY, AND EGRESS TO A PUBLIC WAY WHENEVER THE BUILDING IS OCCUPIED PER LOCAL CODE.
15. FIRE AND/OR SMOKE DAMPER ASSEMBLIES, INCLUDING SLEEVES, AND INSTALLATION PROCEDURES SHALL
BE APPROVED BY THE BUILDING INSPECTOR PRIOR TO INSTALLATION.
16. MINIMUM EXIT CORRIDOR WIDTH SHALL BE PER LOCAL CODE REQUIREMENTS.
17. ALL CONTROLLED ACCESS DEVICES (I.E. CARD READER) AND DOOR HARDWARE SHALL BE AN APPROVED
COMPONENT OF THE LIFE-SAFETY SYSTEM EGRESS.
18. ALL DOORS IN THE MEANS OF EGRESS SHALL COMPLY WITH THE LOCAL CODE REQUIREMENTS.
19. SHAFT ENCLOSURES SHALL COMPLY WITH THE LOCAL CODE REQUIREMENTS.
20. DOORS SHALL BE 3'-0" IN WIDTH MINIMUM, AND 7'-0" IN HEIGHT, MINIMUM.
21. ALL DOORS IN THE MEANS OF EGRESS SHALL COMPLY WITH THE LOCAL CODE REQUIREMENTS.
22. EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING AN OCCUPANT LOAD OF 50 OR
MORE, OR A GROUP "H" OCCUPANCY PER THE LOCAL CODE REQUIREMENTS.
23. EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY, TOOL, OR SPECIAL
KNOWLEDGE OR EFFORT. SPECIAL LOCKING DEVICES SHALL BE OF AN APPROVED TYPE PER THE LOCAL CODE
REQUIREMENTS.
24. KEY-LOCKING HARDWARE MAY BE USED ON THE MAIN EXIT WHEN THE MAIN EXIT CONSISTS OF A SINGLE
DOOR OR PAIR OF DOORS IF THERE IS A READILY VISIBLE, DURABLE SIGN ON OR ADJACENT TO THE DOOR
STATING "THIS DOOR MUST REMAIN UNLOCKED DURING BUSINESS HOURS".
25. DOORS AND FRAMES OF FIRE ASSEMBLIES ARE TO HAVE PERMANENTLY AFFIXED LABELS FOR THE FIRE
RATING.
26. SPRINKLERS: THE CONTRACTOR SHALL SUBMIT THE SPRINKLER LAYOUT (INDICATING LOCATIONS AND TYPE
OF ALL SPRINKLER HEADS) TO DLR GROUP, FOR REVIEW, BEFORE BUILDING DEPARTMENT SUBMITTAL OR
FABRICATION OF PIPING. SPRINKLER LAYOUT DRAWINGS SHALL BE SUBMITTED IN THE FORM OF A
REFLECTED CEILING PLAN, INDICATING OTHER PERTINENT ITEMS TO BE INSTALLED IN THE CEILING (I.E.,
LIGHT FIXTURES, SPEAKERS, H.V.A.C. DIFFUSERS, EXIT SIGNS, ETC.). ALL SPRINKLER HEADS IN GYPSUM
BOARD CEILINGS, SOFFITS, ETC., SHALL BE A FULLY CONCEALED TYPE U.O.N. WITH COVERPLATE TO MATCH
FINISH ON ADJACENT GYPSUM BOARD CEILING. ALL CONFLICTS SHALL BE INDICATED ON THE SUBMITTED
SHOP DRAWINGS.
27. THE FIRE PROTECTION WORK SHALL BE PERFORMED ON A DESIGN-BUILD BASIS. THE DESIGN-BUILD FIRE
PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ALL MODIFICATIONS TO THE EXISTING FIRE
SPRINKLER SYSTEM TO MEET ALL APPLICABLE LOCAL AND STATE CODE REQUIREMENTS. SPRINKLER HEADS
SHALL BE DROPPED INTO ALL SUSPENDED CEILING AREAS. UPGRADE OF EXISTING SYSTEM SHALL
CONFORM WITH EXISTING/PROPOSED BUILDING OCCUPANCY CLASSIFICATION.
28. THE FIRE EXTINGUISHERS WILL BE INSTALLED PER LOCAL AND STATE FIRE CODES.
29. ANY COMMON AREAS OUTSIDE TENANT SCOPE OF WORK FOUND TO BE DEFICIENT SHALL BE BROUGHT UP TO
CODE BY LANDLORD, AT NO COST TO TENANT.
FIRE DEPARTMENT NOTES
1. CONTRACTOR TO VERIFY AT BID TIME IF EXISTING PIPES, HVAC OR ANY OTHER ITEM NEEDS TO BE
RELOCATED TO ACCOMMODATE THE PROPOSED DESIGN. IF SO, THESE RELOCATIONS SHOULD BE
IDENTIFIED IN THE BID TO BE ACCEPTED OR REJECTED BY ARCHITECT. CHANGE ORDERS FOR THESE
KINDS OF RELOCATIONS AT ACCESSIBLE CEILINGS WILL NOT BE ACCEPTED DURING CONSTRUCTION.
2. BY ENTERING INTO AN AGREEMENT WITH THE CLIENT, THE CONTRACTOR REPRESENTS THAT HE HAS
VISITED THE JOB SITE, FAMILIARIZED HIMSELF WITH EXISTING CONDITIONS, AND NOTED IN WRITING AND
PROVIDED TO DLR GROUP/OWNER ANY DISCREPENCIES WITH THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS.
EXISTING CONDITION NOTES
1. ALL EXISTING WATER PIPES TO BE WRAPPED PER STATE AND LOCAL CODES. ALL EXISTING PIPE
INSTALLATION TO BE REMOVED & REPLACED, U.O.N. NEW INSTALLMENT TO INCLUDE FINISHED QUALITY
TAPED JOINTS & ELBOWS WITH IDENTIFICATION SIGNS MTD. ON THE TOP SIDE OF THE PIPE. DLR GROUP
TO APPROVE SAMPLE BEFORE THE COMMENCEMENT OF THE ENTIRE SCOPE OF WORK.
2. ALL EXISTING PLUMBING BEING ABANDONED SHALL BE CAPPED AS PER STATE AND LOCAL CODES BEHIND
EXISTING FINISHED SURFACES.
3. THE PLUMBING CONTRACTOR SHALL NEVER LOCATE WATER LINES ABOVE A SUITE'S I.T./SERVER ROOM(S).
THE PLUMBING CONTRACTOR SHALL REMOVE AND/OR RELOCATE ALL WATER LINES ABOVE THE SUITE'S
I.T./SERVER ROOM(S) AND PROVIDE WATER DETECTION ALARMS AND PANS BELOW ANY WATER LINES
THAT CANNOT BE RELOCATED.
4. THE PLUMBING CONTRACTOR SHALL SUBMIT CUT SHEETS OF ALL NEW FIXTURES, FITTINGS, AND
ACCESSORIES TO DLR GROUP FOR REVIEW.
5. THE PLUMBING CONTRACTOR SHALL COORDINATE AND INSTALL HIS WORK IN ACCORDANCE WITH
MANUFACTURERS' SPECIFICATIONS.
6. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL VALVES AS REQUIRED FOR THE PROPER
CONTROL OF THE PIPING AND APPARATUS INSTALLED AS PART OF THIS PROJECT SO THAT ANY FIXTURE
OR LINE MAY BE CUT OFF AND REPAIRED WITHOUT INTERFERENCE OR INTERRUPTION OF SERVICE TO
THE REMAINDER OF THE BUILDING.
7. BEFORE COVERED UP OR BUILT-IN, ALL PIPING SHALL BE TESTED AND INSPECTED AS REQUIRED BY THE
AUTHORITIES HAVING JURISDICTION.
8. CONTRACTOR SHALL PROVIDE & COORDINATE LOCATION OF FLOOR DRAINS AT RESTROOMS, SHOWER
ROOMS, JANITOR CLOSETS. PLACE DRAIN @ ℄OF FLOORING TILE.
PLUMBING NOTES
1. CONTRACTOR SHOULD NOT SCALE DRAWINGS, ALL NOTED DIMENSIONS GOVERN. LARGE SCALE
DETAILS GOVERN OVER SMALLER SCALE DETAILS.
2. ALL REQUIRED PERMITS AND LICENSES SHALL BE OBTAINED AND PAID FOR BY THE
CONTRACTOR.
3. AT THE TIME OF BID SUBMITTAL, THE CONTRACTOR SHALL ADVISE DLR GROUP, IN WRITING, OF
ANY SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A
DELAY TO THE COMPLETION OF CONSTRUCTION.
4. IMMEDIATELY AFTER BEING AWARDED THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A
CONSTRUCTION SCHEDULE WHICH SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE
JOB SITE AT ALL TIMES.
5. THE CONTRACTOR SHALL VERIFY THE REQUIRED LOCATIONS AND INCLUDE IN BASE BID ALL
RELATED COSTS FOR ALL NECESSARY FRAMELESS ACCESS PANELS (IN PARTITIONS, FLOORS OR
CEILINGS). THE CONTRACTOR SHALL COORDINATE WITH DLR GROUP BEFORE INSTALLATION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY UTILITIES (POWER,
LIGHTING, WATER AND RESTROOM FACILITIES) TO THE JOB SITE FOR USE BY ALL
CONSTRUCTION TRADES, INCLUDING THOSE NOT A SUBCONTRACTOR TO THE GENERAL
CONTRACTOR. CONTRACTOR TO PROVIDE PROTECTION AS REQUIRED. ANY DAMAGE TO THESE
FACILITIES SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
7. ALL CONTRACTORS SHALL CONTACT BUILDING MANAGEMENT TO DETERMINE THE BUILDING
OWNER'S RULES FOR CONSTRUCTION, DELIVERIES, CONSTRUCTION TASKS TO BE PERFORMED
OUTSIDE REGULAR BUSINESS HOURS ONLY, AND ANY OTHER SPECIAL BUILDING REQUIREMENTS
WHICH WILL AFFECT THE WORK. IF OVERTIME WORK IS REQUIRED BY ANY TRADE, APPROVAL
(INCLUDING COST APPROVAL) MUST BE OBTAINED PRIOR TO THE EXECUTION OF ANY WORK. THE
GENERAL INTENT IS THAT ALL WORK EXCEPT FOR NOISE-GENERATING CONSTRUCTION SHALL
BE PERFORMED ON REGULAR TIME.
8. THE CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET OF CONSTRUCTION
DRAWINGS ON SITE DURING ALL CONSTRUCTION PHASES FOR THE USE OF ALL TRADES. THE
CONTRACTOR SHALL SEE THAT ALL SUBCONTRACTORS RECEIVE COMPLETE SETS OF
CONSTRUCTION DRAWINGS, AT ALL TIMES DURING THE PROGRESS OF THE JOB (I.E. REVISIONS)
ON A TIMELY BASIS, OR ASSUME FULL RESPONSIBILITY FOR COORDINATION OF WORK WHEN
COMPLETE SETS ARE NOT AVAILABLE TO SUBCONTRACTORS.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL WORK AND MATERIALS IN
CONFORMANCE WITH ANY CODE OR CODES OF FEDERAL, STATE, COUNTY OR MUNICIPALITY
HAVING JURISDICTION OVER SUCH WORK. ALL APPLICABLE REQUIREMENTS IN THESE
REGULATIONS SHALL BE FOLLOWED THE SAME AS IF NOTED ON THE DRAWINGS. CONFLICTS
BETWEEN WORK SET FORTH ON THE DRAWINGS AND BUILDING CODES, LAWS OR REGULATIONS
NOTED BY THE GENERAL CONTRACTOR SHALL BE SUBMITTED TO DLR GROUP FOR RESOLUTION
BEFORE PROCEEDING WITH THE WORK.
10. THE CONTRACTOR SHALL, AT ALL TIMES, KEEP PREMISES FREE FROM ALL ACCUMULATION OF
DEBRIS CAUSED BY HIS OPERATIONS. AT THE COMPLETION OF THE WORK, SHALL CLEAN ALL
GLASS AND WOOD SURFACES AND LEAVE THE WORK "BROOM CLEAN." SHALL ALSO CLEAN ALL
LIGHT FIXTURES.
11. THE GENERAL CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND OTHER
ITEMS NECESSARY FOR THE COMPLETION OF ALL WORK SHOWN, CALLED FOR, OR REASONABLY
IMPLIED BY THE CONTRACT DOCUMENTS EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE.
12. WHERE WORK OR EQUIPMENT IS INDICATED AS N.I.C., SUCH WORK AND/OR EQUIPMENT SHALL
BE PROVIDED BY OTHERS. CONTRACTOR SHALL COORDINATE AND COOPERATE TO EFFECT
SUCH INSTALLATION.
13. ALL REQUESTS FOR CLARIFICATION OF THESE DRAWINGS SHALL BE DIRECTED TO DLR GROUP
CONFLICTS ARISING BETWEEN DETAILS AND/OR PLANS SHALL BE BROUGHT TO THE ATTENTION
OF DLR GROUP FOR CLARIFICATION IN WRITING BY THE CONTRACTOR BEFORE PROCEEDING
WITH THE WORK.
14. ALL WORK ON DRAWINGS SHALL BE PERFORMED IN CONFORMANCE WITH REQUIREMENTS OF
THE LEASE WORK LETTER AND BUILDING STANDARD SPECIFICATIONS, U.O.N. IT IS THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ACQUAINT HIMSELF WITH ALL SUCH
SPECIFICATIONS AND REGULATIONS WHETHER OR NOT LISTED ON DRAWINGS AND/OR INCLUDED
HEREIN.
15. NO EXTRA WORK OR CHARGE SHALL BE MADE UNLESS A WRITTEN COUNTERSIGNED ORDER
FROM THE OWNER, SIGNED OR COUNTERSIGNED BY DLR GROUP, OR A WRITTEN ORDER FROM
DLR GROUP, IS OBTAINED. THIS ORDER SHALL STATE THAT THE TENANT HAS AUTHORIZED THE
EXTRA WORK OR CHARGE, AND NO CLAIM FOR ANY ADDITIONAL SUM SHALL BE VALID UNLESS SO
OFFERED AND PRESENTED AS DESCRIBED ABOVE.
16. GENERAL CONTRACTOR IS RESPONSIBLE FOR REVIEWING AND VERIFYING DEMOLITION PLANS IN
RELATION TO STRUCTURAL AND/OR CONSTRUCTION DRAWINGS. DLR GROUP IS TO BE NOTIFIED
OF ANY CONFLICTS, DISCREPANCIES OR PROBLEMS.
17. GENERAL CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL MENTIONED EQUIPMENT FOR THE
PANTRIES AS REQUIRED U.O.N. VERIFY WITH DLR GROUP
18. GENERAL CONTRACTOR WILL BE HELD FULLY RESPONSIBLE FOR ALL COORDINATION OF SCOPE
OF WORK BETWEEN ARCHITECTURAL & ENGINEERING DWGS. THE MOST COSTLY SCOPE OF
WORK WILL BE ASSUMED @ NON-COORDINATED ISSUES. GENERAL CONTRACTOR TO
COORDINATE WITH DLR GROUP TO RESOLVE CONFLICTS PRIOR TO THE COMMENCEMENT OF
THE WORK.
19. THE BUILDING VENTILATION SYSTEM MAY UTILIZE THE ABOVE CEILING AREA AS A RETURN AIR
PLENUM. ALL WALL TYPES MUST ALLOW UNOBSTRUCTED AIR RETURN THROUGH THE PLENUM.
CONTRACTOR SHALL CONFIRM IF SMOKE / FIRE DAMPERS WILL BE REQUIRED AT FIRE RATED
WALLS AND IF TRANSFER DUCTS ARE SUFFICIENT AT NON-FIRE RATED WALLS.
20. UNLESS COMMON AREA IS EXCLUDED FROM THE SCOPE OF WORK, CONTRACTOR IS
RESPONSIBLE TO PROVIDE ELEVATOR LOBBY & EQUIPMENT AS REQUIRED TO BE CODE
COMPLIANT. CONTRACTOR TO PROVIDE NEW HANDICAP SIGNAGE AT ALL ELEVATOR CAB
LOCATIONS INSIDE AND OUT IN THE IMMEDIATE AREA AROUND THE SYSTEM IF REQUIRED BY
PROJECT.
21. CONTRACTOR TO PROVIDE SIGNS: "WARNING ALARMED DOOR" AT ALL FIRE EXIT DOORS IN STAIR
SHAFTS IF REQUIRED BY PROJECT.
22. CONTRACTOR TO RECESS ELEVATOR SILLS (TYPICAL) IN CONCRETE SLAB AS REQUIRED TO
OBTAIN CONTINUOUS FLOOR SURFACE IF REQUIRED BY PROJECT
23. THE GENERAL CONTRACTOR, SUBCONTRACTOR, OR TENANT'S VENDOR MUST CERTIFY THAT ALL
MATERIALS AND EQUIPMENT USED OR INSTALLED ON THIS JOB ARE FREE OF ANY ASBESTOS
CONTAINING MATERIALS ("ACM") OR POLYCHLORINATED BIPHENYL ("PCB'S").
24. PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE FOLLOWING DOCUMENTS MUST BE
SUBMITTED TO THE LANDLORD: A. CONTRACTOR'S INSURANCE CERTIFICATE. B. A COPY OF
BUILDING PERMIT. C. A COPY OF CONTRACT AGREEMENT BETWEEN TENANT/LANDLORD &
CONTRACTOR. D. A COMPLETE PROJECT TEAM DIRECTORY WITH EMERGENCY PHONE
NUMBERS. E. A PROJECT SCHEDULE NOTING CRITICAL PATH ITEMS AND TARGET COMPLETION
DATE.
25. G.C. SHALL HAVE A FIELD OFFICE WITH A TABLE & CHAIRS FOR WEEKLY MEETINGS.
CONTRACTOR WILL BE REQUIRED TO HAVE A LAPTOP WITH AN E-MAIL CONNECTION.
CONTRACTOR WILL BE REQUIRED TO TAKE WEEKLY DIGITAL PHOTOS OF THE PROJECT AT
LOCATIONS SELECTED BY DLR GROUP PHOTOS WILL BE DISTRIBUTED WEEKLY.
26. CONTRACTOR IS RESPONSIBLE FOR WEEKLY PROJECT MEETING MINUTES WHICH SHALL
REFLECT THE ISSUES RELATED TO THE PROJECT, INCLUDING ACTION ITEMS WITH DUE DATES.
27. ALL INDOOR FURNITURE PLACED IN THE ATRIUM AREA MUST HAVE THE MATERIALS FROM WHICH
THEY ARE MADE APPROVED BY THE FIRE DEPARTMENT, IF REQUIRED BY PROJECT.
28. ARCHITECTURAL DRAWINGS, AS PART OF THE CONTRACT DOCUMENTS, INDICATE INFORMATION
SUFFICIENT TO CONVEY DESIGN INTENT, AND DO NOT INDICATE MEANS AND/OR METHODS OF
CONSTRUCTION. CONSTRUCTION MEANS AND METHODS USED TO DELIVER THE DESIGN INTENT
ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND/OR THEIR SUB-CONTRACTORS.
PERFORM CONSTRUCTION MEANS, METHODS, SEQUENCES, TECHNIQUES AND PROCEDURES
COMPLYING WITH NATIONAL, STATE AND LOCAL BUILDING CODES AND SAFETY ORDINANCES.
29. CONTRACTOR TO PROVIDE CODE COMPLIANT FIRE STOPPING @ ALL NEW FLOOR PENETRATIONS
THROUGHOUT WITH PATCH TO MAINTAIN EXISTING FIRE RATING OF FLOOR SLAB.
30. WITHIN AREA OF WORK, CONTRACTOR SHALL SURVEY ALL EXISTING FINISHED SURFACES TO
REMAIN SUCH AS CORNER BEADS, STOPS, CEILING GRID & TILES, PLASTER CEILING, FINISHED
FLOOR SLABS, ETC. FOR CHIPS, CRACK HOLES, DAMAGED SURFACES, AND ANY OTHER DEFECTS
CAUSING AN APPEARANCE DIFFERENT FROM A NEW FIRST CLASS FINISHED REPAIRING, THEN
CONTRACTOR SHALL REMOVE EXISTING AND INSTALL NEW SURFACES TO THE SATISFACTION OF
DLR GROUP
31. CONTRACTOR IS RESPONSIBLE TO VERIFY STRUCTURAL SLAB SUPPORT CAPABILITY AS
REQUIRED AT NEW FILE ROOMS FOR ALL STRUCTURAL DESIGN-BUILD JOBS. NOTIFY DLR GROUP
WHETHER STRUCTURAL REINFORCEMENT IS NECESSARY OR NOT.
32. ALL EXTERIOR GLASS MULLIONS SHALL BE CLEANED AND HOLES REPAIRED.
33. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL CONSTRUCTION CLEANUP, CLEANING OF ALL
INTERIOR GLASS SURFACES AND SHALL PROVIDE OFFICE CLEANUP SERVICE(S) (CARPET, WOOD
SURFACES, ETC.) FOR THE LAST MINUTE CLEANUP AT ODD HOURS (EVENINGS, WEEKENDS,
ETC.). ARRANGEMENTS SHALL BE MADE TO HAVE ALL EXTERNAL WINDOW SURFACES CLEANED
WITHIN TWO (2) WEEKS OF MOVE-IN/OCCUPANCY. THE G.C. SHALL COORDINATE ALL CLEANUP
WITH BUILDING REPRESENTATIVES AND DLR GROUP
34. UPON COMPLETION OF THE JOB, THE GENERAL CONTRACTOR SHALL SUBMIT CERTIFICATES OF
INSPECTION OF SATISFACTORY COMPLETION TO DLR GROUP.
35. GENERAL CONTRACTOR SHALL PROVIDE A FINAL PUNCH LIST FOR DLR GROUP'S APPROVAL.
THREE (3) COPIES OF THE CLOSE-OUT PACKAGE INCLUDING AS-BUILT DWGS, WARRANTIES ETC.
AT PROJECT COMPLETION.
36. THIS SET OF DOCUMENTS IS FOR INTERIOR DESIGN CONSTRUCTION ONLY. REFER TO SHELL AND
CORE DOCUMENTS PROVIDED BY THE LANDLORD FOR INFORMATION PERTAINING TO THE
EXISTING BUILDING.
GENERAL NOTES
1. REFER TO DEMOLITION PLAN FOR EXTENT OF DEMOLITION WORK.
2. INSTALL TEMPORARY WALK-OFF CARPET AT ALL ENTRANCES TO THE JOB SITE. CARPET IS TO BE KEPT
DAMP AT ALL TIMES.
3. CONTRACTOR IS RESPONSIBLE TO TAKE ALL PRECAUTIONS TO RESTRICT ACCESS TO DANGEROUS
AREAS BY OUTSIDE PERSONNEL. TO THIS END, BARRIERS AND SIGNS SHALL BE ERECTED THROUGHOUT
DEMOLITION AND CONSTRUCTION.
4. CONTRACTOR SHALL REPAIR IMMEDIATELY ANY DAMAGE DONE TO THE BUILDING ELEMENTS DUE TO
DEMOLITION & CONSTRUCTION TO AVOID DISRUPTION OF BUSINESS AND/OR FURTHER DETERIORATION.
DAMAGE TO THE BUILDING ELEMENTS WILL BE CONSIDERED FULLY REPAIRED ONLY AFTER AN
APPROVAL BY THE BUILDING MANAGEMENT AND DLR GROUP IS OBTAINED. ANY DAMAGE OCCURRING
TO THE CONCRETE SLAB SHALL BE REPAIRED TO DUPLICATE THE ORIGINAL CONSTRUCTION. (APPLIES
TO DAMAGE DONE TO WOOD FLOORS AS WELL).
5. CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE REMOVAL FROM THE JOB SITE OF ALL
VARIOUS VENDOR DEBRIS (CONSTRUCTION MATERIALS /WASTE /WRAPPING/PACKAGES, ETC.). DURING
THE ENTIRE COURSE OF THE PROJECT, WITH PARTICULAR ATTENTION TO SAME DURING LAST WEEK(S)
OF THE JOB, DURING FURNITURE/EQUIPMENT INSTALLATION AND IMMEDIATELY PRIOR TO MOVE-IN.
(THIS SHALL INCLUDE REMOVALS OF PACKAGING FROM TELEPHONE/COMM. & FURNITURE VENDORS).
THE G.C. SHALL MAKE AVAILABLE SAME SERVICE SUBSEQUENT TO MOVE-IN AND TO COORDINATE
EXPECTED REMOVALS AS JOB APPROACHES MOVE-IN.
6. CONTRACTOR TO VERIFY IF ANY DEMOLISHED WALLS OR COLUMN FURRINGS CONTAIN MECHANICAL OR
PLUMBING & ADVISE DLR GROUP PRIOR TO DEMO.
7. SAVE AND STORE ALL LIGHT FIXTURES, EXIT SIGNS, DOOR ASSEMBLIES & HARDWARE FOR RE-USE, OR
TO BE STORED BY BLDG. MANAGEMENT, U.O.N.
8. ALL PARTITIONS, FLOORS, CEILINGS, AND ADJACENT SURFACES SHALL BE PATCHED OR REPAIRED AS
REQUIRED FOR FINISH APPLICATIONS. PATCHED AND REPAIRED SURFACES SHALL BE EQUAL TO NEW.
THE CONTRACTOR SHALL ADVISE DLR GROUP OF ANY EXISTING CONSTRUCTION WHICH IS NOT LEVEL
AND PLUMB (WITHIN INDUSTRY STANDARDS) BEFORE START OF CONSTRUCTION. FLOOR PREP SHOULD
THEREFORE BE INCLUDED IN THE JOB BID.
10. ALL TRADES TO INSPECT EXISTING SITE CONDITIONS PRIOR TO SUBMITTING BIDS. CONTRACTOR TO
NOTIFY DLR GROUP OF ANY CONFLICTS WITH THE WORK.
11. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN GENERAL TO PROVIDE THE EXTENT OF
DEMOLITION AND IS NOT TO BE CONSIDERED A RECORD DRAWING OF EXISTING CONDITIONS.
12. REMOVE EXISTING PARTITIONS, DOORS, FRAMES, HARDWARE, MILLWORK, AT AREAS INDICATED ON
PLAN. PROVIDE ADEQUATE PROTECTION OF ADJACENT SURFACES NOT INCLUDED IN THE DEMOLITION.
13. CONTRACTOR TO WALK JOBSITE AND INCLUDE REMOVAL OF OTHER MISC. ITEMS NOT SHOWN AND ARE
NOT RETAINED OR REUSED IN THE CONSTRUCTION PLAN.
14. REMOVE ABANDONED ELECTRICAL CONDUIT, J-BOX, PANELS, FIXTURES, WIRING, ETC., AT PARTITIONS
TO BE REMOVED. WIRING AND CONDUIT SHALL BE REMOVED TO POINT OF ORIGIN OR TO THE FIRST
ITEM UNAFFECTED BY THE REMOVAL. CONDUIT WHICH IS BURIED OR OTHERWISE INACCESSIBLE SHALL
BE ABANDONED. IN SUCH CASES, CONTRACTOR SHALL PULL ALL WIRE FROM CONDUIT, CUT BACK
CONDUIT FLUSH WITH FINISHED FACE AND FILL ALL OPENINGS.
15. ALL ABANDONED SYSTEMS, I.E. PIPING, DUCTWORK, CABLING, ETC. ARE TO BE REMOVED TO POINT OF
ORIGIN AND CAPPED.
16. SEE DEMOLITION NOTES PREPARED BY MEP/ ENGINEERS FOR ADDITIONAL INFORMATION AND
REQUIREMENTS FOR DEMOLITION OF ELECTRICAL, HEATING, VENTILATING, AIR CONDITIONING,
VOICE/DATA, ETC. ITEMS AS WELL AS COORDINATION OF DEMOLITION ITEMS.
17. EXISTING EXTERIOR WINDOW TREATMENT TO REMAIN U.O.N. PROTECT DURING DEMO / CONSTRUCTION.
18. CONTRACTOR TO PROVIDE FLOOR AND SLAB PATCH AT FLOOR FOR ALL PENETRATIONS.
19. ALL EQUIPMENT AND MATERIAL WHICH IS IN OPERATING CONDITION WHEN REMOVED, SHALL BE
MAINTAINED AS SUCH AND RETURNED AS PER OWNER'S REQUIREMENTS.
20. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE IDENTIFICATION, ABATEMENT AND PROPER
DISPOSAL OF ANY AND ALL ASBESTOS/TOXIC MATERIALS THAT MAY EXIST AT THE JOB SITE.
DEMOLITION NOTES
1. GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND
REQUEST CLARIFICATION FROM DLR GROUP, REGARDING DISCREPANCIES BETWEEN DRAWINGS AND FIELD
CONDITIONS BEFORE COMMENCING ANY WORK.
2. CONTRACTOR TO SNAP/SPRAY LOCATION OF ALL FIXTURES, WALLS, MILLWORK, OUTLETS, LIGHTS, ETC.
FOR DLR GROUP APPROVAL PRIOR TO ANY CONSTRUCTION STARTING. ONCE DLR GROUP APPROVES ALL
LAYOUTS, THEN CONTRACTOR CAN PROCEED WITH THE PROJECT. DLR GROUP SHALL BE NOTIFIED OF ANY
DEVIATION FROM DIMENSIONS OR CLEARANCES INDICATED ON PLANS REQUIRED DUE TO FIELD
CONDITIONS.
3. PARTITIONS ARE DIMENSIONED FROM FINISH TO FINISH, U.O.N. CENTER LINE OF PARTITION TO ALIGN WITH
CENTER LINE OF MULLION WHERE OCCURS, U.O.N.
4. ALL "HOLD" DIMENSIONS MUST BE MAINTAINED.
5. ALL PARTITIONS SHOWN AS "ALIGN" ARE TO BE SMOOTH AND FLUSH WITH EXISTING CONSTRUCTION.
6. ALL DIMENSIONS OF GLASS PARTITIONS ARE GIVEN FROM CENTERLINE TO CENTERLINE, U.O.N.
7. ALL PARTITIONS SHALL BE ANCHORED PER MANUFACTURERS' SPECIFICATIONS AND AS REQUIRED BY
APPLICABLE BUILDING CODES. FOR PARTIAL HEIGHT OR CEILING HEIGHT PARTITIONS, TOP TRACK OF
FRAMING TO BE SECURELY ATTACHED TO STRUCTURE ABOVE WITH METAL STUD KICKERS EVERY 4'-0" ON
CENTER IN ALTERNATING DIRECTIONS AT 45 DEGREES FOR LATERAL SUPPORT PER CODE REQUIREMENTS.
8. PARTITIONS EXTENDING TO THE SLAB, SHALL BE SEALED TO THE SLAB, PERIMETER WALLS AND AROUND
PENETRATIONS TO FORM THE PLENUM.
9. AT ALL POINTS WHERE PARTITIONS INTERSECT WINDOW MULLIONS, SOUND DEADENING MATERIAL IS TO BE
INSTALLED WITHIN CONVECTOR PLENUM. PROVIDE NEOPRENE GASKET WITH 2045 SHEET METAL CAP.
CONNECTION SHALL HAVE THE SAME IF NOT GREATER STC RATING AS THE PARTITION ASSEMBLY OR PER
REFERENCED DETAIL.
10. PROVIDE METAL CORNER BEADS AT ALL DRYWALL PARTITION CORNERS AND ENDS.
11. WHERE REQUIRED, PROVIDE FURRING OR MINIMUM ADDITIONAL PARTITION THICKNESS WITH CONTINUOUS
INSULATION FOR PLUMBING WALLS.
12. ALL PTD./MTL. GYP. BD. WALL/CEILING REVEALS SHALL BE CONTINUOUS WITH WELDED AND MITERED
CONNECTIONS TYPICAL.
13. ALL ROUGH AND FINISHED CARPENTRY, INCLUDING WOOD BLOCKING, WOOD DOORS, DOOR AND WINDOW
FRAMES WILL BE FIRE RETARDANT TREATED AS REQUIRED TO COMPLY WITH THE REQUIREMENTS OF THE
BUILDING CODE AND OTHER APPLICABLE CODES FOR COMBUSTIBILITY FLAME SPREAD RATING.
14. WHERE METAL STUD FRAMING ADJOINS METAL DUCTS OR PIPES, OR WHERE TWO METALS ARE AFFIXED TO
EACH OTHER, THE GENERAL CONTRACTOR WILL PROVIDE INSULATING MATERIAL BETWEEN SO THAT NO
VIBRATION OR NOISE WILL BE TRANSMITTED. ALL LOCATIONS ARE TO BE BROUGHT TO DLR GROUP'S
ATTENTION.
15. CONTRACTOR TO PROVIDE SOUND RESISTANT SEALANT AT WHEREVER CONDUIT, J-BOXES, PLUMBING
PIPES, ETC. OCCUR. PIERCE ACOUSTICAL PARTITIONS OR CEILINGS. CONTRACTOR TO OBTAIN "EQUAL TO"
STC/NRC RATINGS AT PARTITIONS WITH NO PIERCING.
16. AT ALL RATED PARTITIONS AND PARTITIONS OR BAFFLES EXTENDING TO THE FLOOR STRUCTURE ABOVE
WILL BE SCALED TO THAT STRUCTURE, TO PERIMETER WALLS AND AROUND ANY PENETRATIONS SUCH AS
PIPES OR DUCTS. WHERE A DUCT OR OTHER CONSTRUCTION RUNS PARALLEL WITH A RATED PARTITION,
OFFSET THAT PARTITION ABOVE THE CEILING AROUND THE CONSTRUCTION TO MAINTAIN THE FIRE
RATING. ALL SUCH CONDITIONS SHOULD BE IDENTIFIED ON THE COORDINATION DRAWINGS AND
SUBMITTED TO THE DLR GROUP FOR APPROVAL.
17. ALL GYPSUM WALL BD. USED WILL BE 5/8" FIRE CODE TYPE "X" BY U.S.G., U.O.N.
18. GENERAL CONTRACTOR TO SCAR PATCH ALL CORE WALLS AND PERIMETER BASE BUILDING WALLS
SCARRED FROM DEMOLITION OR EXISTING CONDITIONS AS REQUIRED.
19. GENERAL CONTRACTOR TO PROVIDE 1/8" WIDE BUTT JOINTS AT ALL GLASS TO GLASS CONNECTIONS AND
MITERED GLASS AT ALL GLASS TO GLASS CORNERS, U.O.N.. GENERAL CONTRACTOR TO PROVIDE CLEAR
SILICONE @ ALL GLASS JOINTS AS DIRECTED IN THE FIELD BY DLR GROUP, U.O.N.
20. CONTRACTOR IS RESPONSIBLE TO COORDINATE DEPTH OF FIRE EXTINGUISHER CABINET WITH NEW
PARTITIONS. CONTRACTOR TO THICKEN SPECIFIED PARTITION AS REQUIRED TO INSTALL CABINET
CORRECTLY AS MANUFACTURED RECOMMENDS. CONTRACTOR TO THICKEN PARTITION AS REQUIRED TO
HOLD NEW CABINET. PARTITIONS TO BE THICKENED FOR ENTIRE LENGTH OF WALL.
21. ALL SURFACES SCHEDULED TO RECEIVE WALL COVERING MUST BE LEVEL "5" FINISH.
22. CONTRACTOR SHALL PROVIDE A MINIMUM OF LEVEL "4" FINISH ON ALL GYP. BD. WALLS PRIOR TO PAINTED
FINISH APPLICATION. NEW PARTITIONS SHALL BE APPROVED FOR FINISH BY DLR GROUP AS REQUIRED
PRIOR TO PAINTING. CONTRACTOR TO PUT IN WRITING AND NOTIFY DLR GROUP IF THEY ARE PROVIDING A
FINISHED LEVEL LESS THAN "4".
23. CONTRACTOR SHALL PROVIDE TEMPERED GLASS AS REQUIRED BY CODE AT SCHEDULED GLASS
PARTITIONS.
24. THE GENERAL CONTRACTOR WILL DOUBLE UP METAL STUDS AT ALL DOORS AND WINDOW OPENINGS
UNLESS OTHERWISE NOTED.
25. PROVIDE WATER RESISTANT GYPSUM BOARD IN ALL TOILET ROOMS AND SHOWER ROOMS. IF THE TOILET
ROOMS OR SHOWER ROOMS PROPOSED 3/8" THK OR MORE STONE WALL TILES, THEN CONTRACTOR SHALL
PROVIDE CEMENT ROCK WALL BOARD IN LIEU OF WATER RESISTANT GYPSUM BOARD.
26. G.C. SHALL SUPPLY ALL RETURN AIR OPENINGS IN SLAB TO SLAB PARTITIONS ABOVE CEILINGS AS
REQUIRED BY ENGINEERING DRAWINGS. ALL OPENINGS IN DEMISING AND SOUND-ATTENUATED
PARTITIONS SHALL HAVE SOUND BOOTS AND ALL OPENINGS IN FIRE-RATED PARTITIONS SHALL HAVE FIRE
DAMPERS AS REQUIRED BY LOCAL BUILDING CODES. CONTRACTOR SHALL COORDINATE WITH
ENGINEERING DRAWINGS AND INFORM DLR GROUP OF DISCREPANCIES PRIOR TO BIDDING.
27. CONTRACTOR SHALL COORDINATE WITH FURNITURE VENDOR TO SIGN OFF ON WALL LAYOUT LAYOUT
WHERE NEW/RELOCATED SYSTEMS FURNITURE OCCURS.
28. AT RESTROOMS, CONTRACTOR SHALL INCREASE SIZE STUD DEPTHS (3 5/8" MIN.) AND SPACING TO
ACCOMMODATE PLUMBING FIXTURES & ACCESSORIES (I.E. TOILET DISPENSER).
29. CONSTRUCT NEW PARTITIONS AS CALLED OUT ON PLAN. PROVIDE AND INSTALL NEW DOORS, FRAMES AND
HARDWARE.
30. PROVIDE MIN. FURRING AT ALL EXPOSED COLUMNS. U.O.N. PREP ALL EXISTING COLUMNS AS REQUIRED TO
RECEIVE NEW SPECIFIED FINISHES.
31. CONTRACTOR SHALL PROVIDE BRACING FOR ALL DEMOUNTABLE FURNITURE SYSTEM WALLS AS REQUIRED
PER CODE. REFER TO FURNITURE PLANS COORDINATE WITH FURNITURE PROVIDER FOR LOCATION OF
DEMOUNTABLE WALLS.
32. PENETRATIONS TO EXISTING RATED CORE WALL, ELEVATOR, STAIR, MECHANICAL/PLUMBING SHAFT WALLS
ARE NOT ALLOWED. FURRING PARTITIONS NEED TO BE SPECIFIED FOR ELECTRICAL AND
DATA/COMMUNICATIONS OUTLETS AT CORE WALLS WITH THE EXCEPTION OF MECHANICAL ROOM WALLS.
PARTITION NOTES
1. FABRICATION MATERIALS OF METAL SUSPENSION SYSTEMS FOR ACOUSTICAL TILE AND LAY-IN PANEL
CEILINGS SHALL CONFORM WITH LOCAL CODE REQUIREMENTS.
2. REWORK EXISTING FIRE/LIFE SAFETY DEVICES AS REQUIRED AND SHALL BE FILED UNDER SEPARATE
PERMIT.
3. CEILING CONTRACTOR SHALL PROVIDE ALL NECESSARY BRIDGING, BLOCKING, CUTOUTS, AND GROUNDS
REQUIRED FOR THE INSTALLATION OF ALL LIGHTING FIXTURES, SPEAKERS, DIFFUSERS, GRILLS,
REGISTERS, ACCESS PANELS, SPECIAL MILLWORK, ETC. AS INDICATED ON OR REQUIRED BY THE
DRAWINGS.
4. THE GENERAL CONTRACTOR & CEILING CONTRACTOR SHALL CLOSELY COORDINATE THEIR WORK WITH
THAT OF THE ELECTRICAL, H.V.A.C., PLUMBING, TELEPHONE AND MILLWORK CONTRACTORS, WHEREVER
THEIR RESPECTIVE WORK IS CONTIGUOUS. NO EXTRAS WILL BE APPROVED FOR CUTTING, PATCHING OR
REPLACING OF BROKEN TILES.
5. ALL EXHAUST FANS SHALL BE SILENT RUNNING AND HAVE A MINIMUM 8'-0" LONG DUCT BETWEEN THE
RETURN AIR GRILLE AND THE FAN MOTOR. DUCT SHALL BE LINED WITH 1" THICK FIBERGLASS LINER: AN
EQUIVALENT LENGTH OF GLASS FIBER FLEXIBLE DUCT IS ACCEPTABLE. DO NOT LOCATE FAN MOTOR
ABOVE CEILING OF ROOM SERVED BY FAN. LOCATE MOTORS ABOVE CORRIDOR OR OPEN AREA
CEILINGS. COORDINATE EXACT LOCATION WITH DLR GROUP BEFORE INSTALLATION.
6. WHERE CEILINGS ARE SPECIFIED TO BE FIRE-RATED CONSTRUCTION, ALL RECESSED LIGHT FIXTURES
AND SPEAKERS SHALL BE BOXED OUT ABOVE THE CEILING WITH A FIRE-RATED ENCLOSURE EQUAL TO
THE RATING OF THE CEILING.
7. ALL SPRINKLER HEADS SHALL BE FULLY CONCEALED, RECESSED SPRINKLER HEADS IN BOTH SHEET
ROCK AND ACOUSTIC CEILINGS. SPRINKLER HEAD COVERS SHALL BE FACTORY SPRAYED TO MATCH
ADJACENT CEILING FINISH. ALL SPRINKLER HEADS ARE TO BE MTD. IN THE CENTER OF ACOUSTIC
CEILING TILES. AT SHEET ROCK CEILINGS GENERAL CONTRACTOR TO VERIFY WITH DLR GROUP IN THE
FIELD THEIR EXACT LOCATION BEFORE INSTALLATION.
8. CEILINGS IN CLOSETS OR BEHIND FASCIAS SHALL BE OF SAME HEIGHT AND MADE OF THE SAME
MATERIAL AND FINISH AS THAT OF ADJOINING SPACES U.O.N.
9. THE GENERAL CONTRACTOR SHALL PROVIDE THE OWNER WITH 5% OF ADDITIONAL CEILING TILES TO
MATCH NEW INSTALLED TILES.
10. ALL CEILING MOUNTED EXIT SIGNS ARE TO BE MOUNTED IN THE CENTER OF CEILING TILE.
11. CONTRACTOR TO PROVIDE ALL FRAMELESS ACCESS PANELS @ NEW/EXISTING PAINTED GYP. BD.
CEILINGS THROUGHOUT. CONTRACTOR TO CONFIRM EXACT MOUNTING LOCATION OF ACCESS PANELS
WITH ARCHITECT PRIOR TO LOCATION.
12. CONTRACTOR TO RELAMP ALL EXISTING TO REMAIN FIXTURES WITH BULBS THAT ARE CONSISTENT WITH
BUILDING STANDARD TEMPERATURE. CONTRACTOR TO CONFIRM LAMP TEMPERATURE PRIOR TO
REPLACING. CONTRACTOR TO REPLACE ALL EXISTING FIXTURES NOT WORKING & CLEAN ALL EXISTING
LIGHT LENSES THROUGHOUT WORK AREAS. REPLACE ALL BALLASTS NOT WORKING PROPERLY.
13. CONTRACTOR TO PATCH ALL EXISTING FIREPROOFING THROUGHOUT WITH PATCHES TO MATCH THE
CONSISTENCY OF THE EXISTING FIREPROOFING.
14. CONTRACTOR TO CENTER ALL ACOUSTICAL TILE CEILING ASSEMBLIES IN AS NOTED THROUGHOUT WITH
EQUAL/EQUAL SPACING BETWEEN WALL LAYOUTS, U.O.N.
15. ALL TRADES TO INSPECT EXISTING SITE CONDITIONS PRIOR TO SUBMITTING BIDS. CONTRACTOR TO
NOTIFY DLR GROUP OF ANY CONFLICTS WITH THE WORK.
16. CONTRACTOR TO CONFIRM THAT ALL LIGHT FIXTURES ARE UL APPROVED.
17. RECESSED DOWNLIGHTS AND WALLWASHERS TO BE CENTERED WITHIN 2'x2' ACOUSTIC CEILING TILE
U.O.N.
18. SWITCHING/ OCCUPANCY SENSORS AND LIGHTING IS SHOWN FOR LOCATION ONLY. ALL LIGHTING SHALL
CONFORM TO TITLE 24 REQUIREMENTS.
19. ALL FIRE/LIFE/SAFETY EQUIPMENT AND SPRINKLER HEADS SHALL BE CENTERED WITHIN 2'x2' ACOUSTIC
CEILING TILE.
20. ALL EXIT LIGHTING TO BE CONNECTED TO BUILDING'S EMERGENCY ELECTRICAL CIRCUIT SYSTEM.
21. REFER TO MEP DRAWINGS FOR RELOCATION OR RECONFIGURATION OF EXISTING BUILDING RISERS,
DUCTS OR PIPING IN RENOVATED AREAS.
22. REWORK H.V.A.C. AS REQUIRED PER DESIGN-BUILD ENGINEERING OR MECHANICAL ENGINEER
CONSULTANT'S DRAWINGS.
23. GENERAL CONTRACTOR TO VERIFY EXIT SIGN LOCATIONS WITH FIRE INSPECTOR AND ADD NEW AS
REQUIRED.
24. REWORK ALL EXISTING SPRINKLER SYSTEM AS REQUIRED. THIS WORK TO BE FILED UNDER SEPARATE
PERMIT, PROVIDE CONCEALED HEADS AT GYP. BD. CEILING, TYP.
25. REPAINT ALL EXISTING DIFFUSERS AND RETURN SUPPLY GRILLS TO MATCH CEILING WHITE FINISH AS
REQUIRED U.O.N.
26. VERIFY THERMOSTAT CONTROL LOCATIONS WITH DLR GROUP PRIOR TO INSTALLATION.
27. CONTRACTOR TO CAULK CEILING TILE AT ALL WALL TRANSITIONS TO CONCEAL GAPS.
28. CONTRACTOR TO PITCH DRYWALL CEILING AT SHOWER ROOMS FOR MOISTURE RUNOFF.
29. CONTRACTOR TO THOROUGHLY CLEAN ALL LIGHT FIXTURES JUST PRIOR TO MOVE-IN AND REMOVE ALL
STICKERS.
CEILING NOTES
1. H.V.A.C. CONTRACTOR SHALL SUBMIT DUCTWORK TO DLR GROUP FOR APPROVAL OF SUPPLY
DIFFUSER AND RETURN REGISTER, T-STATS AND VAV BOX LOCATIONS BEFORE STARTING WORK.
NOTIFY DLR GROUP OF ANY DISCREPANCIES IN CEILING HEIGHTS DUE TO PLACEMENT OF ANY
H.V.A.C. COMPONENTS.
2. H.V.A.C. CONTRACTOR SHALL VERIFY ADEQUATE CLEARANCES FOR ALL AIR CONDITIONING UNITS,
DUCTWORK, ETC.. AGAINST RECESSED FIXTURES, PIPING, BEAMS, ETC. AND BRING ALL
UNWORKABLE CONDITIONS TO THE ATTENTION OF DLR GROUP PRIOR TO THE INSTALLATION OF
ANY MECHANICAL EQUIPMENT.
3. H.V.A.C. CONTRACTOR SHALL VERIFY ALL THERMOSTAT, DIFFUSERS AND RETURN REGISTER
LOCATIONS WITH DLR GROUP PRIOR TO INSTALLATION. AVOID TV LOCATIONS AND ACCENT WALLS
WHERE POSSIBLE.
4. H.V.A.C. CONTRACTOR SHALL VERIFY THAT SITE CONDITIONS AND ENGINEERED MECHANICAL
PLANS COINCIDE BEFORE COMMENCING WORK.
5. REFER TO ENGINEER'S DRAWINGS FOR LOCATIONS AND SIZES OF AIR CONDITIONING RELIEF
OPENINGS REQUIRED IN PARTITIONS ABOVE CEILINGS.
6. VERIFY NO RETURN AIR GRILL IS WITHIN (1) ONE ACOUSTICAL TILE WITH A LIGHT FIXTURE OR
WITHIN (1) ONE ACOUSTICAL TILE TO THE PERIMETER WALL SOFFIT.
7. ALL FRAMELESS, "TAPED TO" LINEAR DIFFUSERS & STANDARD DIFFUSERS SHALL BE SIZED AS
REQUIRED TO PREVENT WHITE NOISE OCCURRING.
HVAC NOTES
NOTE:
KIMLEY-HORN BUILD-OUT NOTES AND
REQUIREMENTS SHALL COMPLY WITH THE
CITY OF INDIANAPOLIS BUILDING STANDARDS
CODE.
07/19/21