Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Kimley-Horn - Indianapolis - Bid Set 5.26.2021_A1.1
REF.F.E.C.F.E.C.F.E.C. DN UPDN UP LIMIT OF WORKAREA NOT IN CONTRACT (NIC) EXISTING PARTITION TO BE DEMOLISHED EXISTING PARTITION TO REMAIN EXISTING DOOR TO BE DEMOLISHED EXISTING DOOR TO REMAIN ACOUSTIC CEILING SYSTEM TO BE DEMOLISHED, GRID & TILE LIGHT FIXTURE TO BE DEMOLISHED EXISTING CEILING MOUNTED LIGHT FIXTURE TO BE DEMOLISHED LIGHT FIXTURE TO BE DEMOLISHED DIMENSION (FACE TO FACE, TYPICAL) EXISTING POWER OUTLET, COMMUNICATION OUTLET, AND LIGHT SWITCH TO REMAIN EXISTING POWER OUTLET, COMMUNICATION OUTLET AND LIGHT SWITCH TO BE DEMOLISHED NO DEMOLITION WORK IN THIS AREA 5' - 0" S DEMOLITION PLAN LEGEND 1. DEMOLISH WALLS, DOOR FRAMES, MILLWORK AND SOFFITS AS INDICATED ON PLAN. REMOVE EXISTING WALL COVERING, FLOORING AND BASE AS WELL AS WALL FASTENERS, REVEALS, NAILS, ETC. AT AREAS TO RECEIVE NEW FINISHES AS SPECIFIED ON FINISH PLAN. 2. CONTRACTOR TO FIELD VERIFY THE EXACT QUANTITY, SIZE AND LOCATIONS OF ALL WORK TO BE DEMOLISHED. DEMOLITION DRAWINGS ARE INTENDED TO SHOW LIMITS AND EXTENT OF DEMOLITION WORK ONLY. 3. NO DEMOLITION SHALL OCCUR AT ANY BASE BUILDING WALLS, PLUMBING, MECHANICAL OR ELECTRICAL SYSTEMS UNLESS SPECIFICALLY CALLED OUT ON THE DRAWINGS. 4. COLUMN FURRINGS ARE NOT TO BE DEMOLISHED UNLESS NOTED SPECIFICALLY ON THE PLANS. ALL DEMOLITION TO WALLS COMMON WITH COLUMN FURRING SHOULD BE REMOVED DOWN TO THE LIMITS OF THE COLUMN WRAP. PROVIDE M ATCHING CONSTRUCTION TO CLOSE ANY OPENINGS IN THE EXISTING COLUMN FURRING CAUSED BY DEMOLITION. 5. NO DEMOLITION IS TO TAKE PLACE OUTSIDE THE LIMITS OF THESE DRAWINGS UNLESS SPECIFICALLY CALLED OUT. 6. THE CONTRACTOR SHALL FURNISH ALL SHORING, BRACING, AND PATCHING NECESSARY AND REQUIRED FOR THE PROPER SUPPORT AND SAFETY OF ALL EXISTING WALLS, FLOORS, CEILINGS AND UTILITIES THAT ARE TO REMAIN AND AFFECTED BY DEMOLITION INCLUDED IN THIS SCOPE OF WORK. 7. SALVAGE DOORS AND FRAMES FOR RE-USE AS INDICATED ON DOOR SCHEDULE. VERIFY QUANTITY AND DOOR SWINGS OF EXISTING DOORS TO BE REUSED IN MEETING REQUIREMENTS OF THE DOOR SCHEDULE. VERIFY DISPOSITION OF BALANCE OF DOORS/FRAMES WITH LANDLORD. REFER TO PROJECT D EMOLITION NOTES FOR ADDITIONAL SALVAGE ITEMS. 8. ELECTRICAL AND DATA/COMMUNICATIONS OUTLETS TO BE REMOVED ARE TO HAVE CABLING/CONDUIT TAKEN BACK TO ORIGINAL PANELS AND OUT OF PLENUM SPACE. PATCH/REPAIR WALLS AT LOCATIONS WHERE OUTLETS AND SWITCHES ARE TO BE REMOVED. REFER POWER/COMMUNICATIONS PLAN & RCP FOR LOCATIONS. PREPARE WALLS TO RECEIVE NEW FINISHES. CAP/FILL AND PROVIDE FIRE SEAL FOR CORE DRILLS AT FLOOR POKE-THRU'S AS REQUIRED. 9. CAP/SEAL ANY UNUSED PLUMBING AND PROVIDE FLOOR FILL AND FIRE SEAL AT ALL REMOVED CORE DRILLS. 10. ALL SALVAGEABLE MATERIALS SCHEDULED TO BE DEMOLISHED, SUCH AS DOORS, FRAMES, HARDWARE, MILLWORK, AND OTHER RE-USABLE ITEMS ARE TO BE RETURNED TO BUILDING STOCK. COORDINATE ALL SALVAGE AND STORAGE OF THESE ITEMS WITH BUILDING MANAGEMENT. 11. ANY DAMAGE TO REMAINING CONSTRUCTION AND/OR BASE BUILDING ITEMS CAUSED BY THE DEMOLITION PROCESS WILL BE REPAIRED AND/OR REPLACED BY THE CONTRACTOR AT NO COST TO THE TENANT OR LANDLORD. 12. CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF ALL TRASH FROM SITE. COORDINATE TRASH REMOVAL AND DUMPSTER LOCATION WITH BUILDING MANAGER. 13. CONTRACTOR SHALL TAKE REQUIRED MEASURES TO KEEP DUST CAUSED BY DEMOLITION FROM ENTERING ADJACENT LEASE SPACE AND THE OTHER FLOORS AND/OR COMMON AREAS. 14. CONTRACTOR TO PROVIDE PROTECTION TO ALL SURFACES THAT ARE TO REMAIN. 15. EXISTING DUCTWORK TO REMAIN DURING DEMOLITION UNLESS NOTED OTHERWISE. RELOCATION AND/OR REMOVAL OF DUCTWORK, TERMINAL BOXES, AND AIR DEVICES ARE TO BE DETERMINED BY THE HVAC CONTRACTOR AS REQUIRED FOR NEW PARTITION LAYOUT. 16. DEMOLITION OF ALL UNUSED HVAC AND PLUMBING SHOULD GO BACK TO THE SOURCE OF ORIGIN. FOR WASTE LINES INDICATED TO BE CAPPED OR ABANDONED IN PLACE, PRIOR TO ANY MODIFICATION OF THE WASTE LINE, THE CONTRACTOR SHALL VERIFY THAT THERE ARE NO ACTIVE WASTE CONNECTIONS UPSTREAM OF THE DESIGNATED TERMINATION POINT. CONNECTIONS INCLUDING, BUT NOT LIMITED TO, OTHER WASTE LINES, CONDENSATE LINES, ETC. IF OTHER UPSTREAM CONNECTIONS EXIST, NOTIFY ARCHITECT IMMEDIATELY. 17. CONTRACTOR SHALL PROVIDE WALK-OFF CARPET MATS (48'X48") AT ALL ENTRANCE DOORS TO DEMOLITION AREA TO PREVENT TRACKING OF DIRT/DEBRIS ONTO EXISTING FLOORING. 18. CONTRACTOR SHALL PROVIDE PROTECTIVE MATERIAL TEMPORARILY SECURED TO EXISTING WALLS, CORNERS, AND DOOR/JAMBS TO PREVENT DAMAGE TO ALL EXISTING FINISHED/SURFACES TO REMAIN. 19. ANY EXISTING WALLS TO REMAIN, WHERE THE BASE BEING REMOVED IS GREATER THAN 4" IN HEIGHT, CONTRACTOR IS TO SKIM COAT THE WALLS FOR A FLUSH APPEARANCE. DEMOLITION NOTES 1 TYP. THROUGHOUT LIMIT OF WORK 2 3 4 5 © DLR GroupRevisions -ALL PROJECT COMMUNICATION TO BE SENT TO MARK REED/MONICA BATES, NOT AOR.5/25/2021 3:31:38 PMC:\Revit\_2020\KH Indianapolis Expansion CD's v_20_hgriffo.rvt23-21100-00 5.26.2021 BID/PERMIT DEMOLITION FLOOR PLAN A1.1250 E. 96TH ST. #580INDIANAPOLIS, IN 46240INDIANAPOLIS, INDIANA1. CONTRACTOR TO REMOVE ALL EXISTING FLUSH POKE-THRU DEVICES. CAP/FILL AND PROVIDE FIRE SEAL FOR CORE DRILL AT FLUSH POKE-THRU DEVICE AS REQUIRED. 2. CONTRACTOR TO REMOVE EXISTING FLOOR AND BASE FINISHES. PATCH AND REPAIR FLOOR TO CREATE A LEVEL SURFACE FOR NEW FLOOR FINISHES. 1/2" FOR EVERY 10'-0". TYPICAL. 3. CONTRACTOR TO REMOVE EXISTING MILLWORK, SINK AND APPLIANCES. REMOVE EXISTING PLUMBING AND CAP BACK TO SOURCE. COORDINATE WITH MEP. 4. CONTRACTOR TO REMOVE EXISTING FLOOR AND BASE FINISHES AS INDICATED ON PLAN. PATCH AND REPAIR FLOOR TO CREATE A LEVEL SURFACE FOR NEW FLOOR FINISHES. 1/2" FOR EVERY 10'-0". TYPICAL. 5. CONTRACTOR TO REMOVE INDICATED PORTION OF RECEPTION DESK. PROTECT ALL OTHER PORTIONS OF DESK DURING DEMOLITON. 13612 24 48 PLAN NORTH TRUE NORTH KEYED NOTES A. CONTRACTOR TO REMOVE EXISTING FLOOR AND BASE FINISHES. PATCH AND REPAIR FLOOR TO CREATE A LEVEL SURFACE FOR NEW FLOOR FINISHES. 1/2" FOR EVERY 10'-0". TYPICAL. ** PROJECT NOTES APPLY TO ENTIRE LIMIT OF WORK ** PROJECT NOTES 07/19/21