HomeMy WebLinkAboutKimley-Horn - Indianapolis - Bid Set 5.26.2021_A3.1REF.F.E.C.H1CDN UPDN UP REF.LIMIT OF WORK1. CONTRACTOR TO PERFORM FIELD INSPECTION OF EXISTING HVAC EQUIPMENT, VAV BOXES, FAN POWERED BOXES, LIEBERT (PRECISION COOLING UNITS) AND DUCTWORK PRIOR TO CONSTRUCTION. CONTRACTOR SHALL PROVIDE SEPARATE ESTIMATE TO BUILDING OWNER FOR ANY REPAIRS NECESSARY TO THE HVAC SYSTEM NOT INCLUDED IN SCOPE OF WORK. CONTRACTOR WILL BE RESPONSIBLE FOR ANY REPAIRS DUE TO DAMAGE DURING SUBSEQUENT DEMOLITION OR CONSTRUCTION. 2. DIMENSIONS SHOWN ARE FROM FACE OF WALL TO CENTERLINE OF LIGHT FIXTURE (U.N.O) 3. FURNISH/INSTALL LIGHT FIXTURES AS SCHEDULED, UNLESS NOTED OTHERWISE IN LIGHT FIXTURE SCHEDULE, THROUGHOUT TENANT'S LEASE SPACE. ALL WIRING WITHIN TENANT'S LEASE SPACE IS THE RESPONSIBILITY OF THE CONTRACTOR. 4. REFER TO MEP/AV PLANS FOR ADDITIONAL COORDINATION. 5. PROVIDE STENCILING ABOVE LAY-IN CEILING USING THE FOLLOWING VERBIAGE: "FIRE AND SMOKE BARRIER-PROTECT ALL OPENINGS". STENCILS SHALL BE LOCATED ON BOTH SIDES OF RATED PARTITIONS AND PLACED EVERY 6'-0" O.C. 6. PRIOR TO ORDERING FIXTURES, CONTRACTOR SHALL VERIFY ADEQUATE DEPTH BETWEEN CEILING GRID AND ANY OBSTRUCTIONS IN PLENUM THAT WOULD PREVENT INSTALLATIONS AND NOTIFY ARCHITECT IMMEDIATELY. 7. THERMOSTATS SHALL BE LOCATED FREE AND CLEAR OF FURNITURE SYSTEMS. 8. SHOULD CONFLICT ARISE BETWEEN LIGHT FIXTURE LAYOUT AND FIRE PROTECTION SYSTEM, PLUMBING SYSTEM, EXIT SIGNS OR MECHANICAL EQUIPMENT, LIGHT FIXTURE LAYOUT SHALL TAKE PRECEDENCE. ADJUSTMENT OF CONFLICTING ELEMENTS SHALL BE MADE IN SUCH A WAY AS TO MAINTAIN ENGINEERING DESIGN INTENT/CODE COMPLIANCE. NOTIFY ARCHITECT OF SUCH CONFLICTS. 9. REFER TO REFLECTED CEILING PLAN FOR CEILING HEIGHTS. REFERENCE TO WALL TYPES FOR WALL TO CEILING CONDITIONS. 10. CONTRACTOR SHALL FURNISH AND INSTALL ALL LIGHTS, SWITCHES, EMERGENCY DEVICES AND HVAC EQUIPMENT & SHALL PERFORM ALL WORK AS SHOWN ON OR IMPLIED ON ALL PLANS. 11. LIGHT SWITCH INDICATES LOCATION ONLY. CONTRACTOR TO VERIFY QUANTITY OF LIGHT FIXTURES PER CIRCUIT AND QUANTITY OF SWITCHES REQUIRED. PROVIDE AND INSTALL ADDITIONAL SWITCHES AS REQUIRED. 12. CIRCUITING INDICATED IS FOR SWITCHING PURPOSES ONLY, AT INDIVIDUAL ROOMS, LIGHTS WITHIN THAT ROOM ARE TO BE CIRCUITED TO THE SWITCH INDICATED FOR THAT ROOM. 13. CONTRACTOR TO VERIFY ALL EXISTING FIXTURES, BALLASTS, AND LIGHTS ARE IN OPERABLE CONDITION. CLEAN LENSES AND REPLACE LAMPS, BALLASTS, AND LENSES AS REQUIRED. ALL LAMPS SHALL BE CONSISTENT IN COLOR THROUGHOUT. 14. CONTRACTOR SHALL PROVIDE AND RELOCATE FIRE PROTECTION DEVICES AS REQUIRED, I.E.: FIRE ALARMS, DETECTORS, SPEAKERS, STROBES, 24 HOUR EMERGENCY LIGHTS, ETC. CONTRACTOR TO PROVIDE AND INSTALL ALL EMERGENCY WARNING SYSTEMS PER ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODE REQUIREMENTS. ALL EMERGENCY WARNING SYSTEMS SHALL INCLUDE BOTH AUDIBLE AND VISUAL ALARM DEVICES THAT COMPLY WITH ADA TITLE III. 15. RE-USED CEILING DIFFUSER/RETURN AIR GRILLS SHALL BE CLEANED, PAINTED AS REQUIRED TO MATCH ALL NEW DEVICES IN CEILING. 16. CONTRACTOR TO FIELD VERIFY PRIOR TO START OF CONSTRUCTION AND COORDINATE LOCATIONS OF NEW AND EXISTING HVAC EQUIPMENT WITH LIGHT FIXTURES SHOWN. CONTRACTOR IS RESPONSIBLE FOR ANY RELOCATION OF HVAC EQUIPMENT IN THEIR SCOPE OF WORK AND CONTRACT. NOTIFY ARCHITECT OF ANY CONFLICTS. PROVIDE THERMOSTATS 48" TO HIGHEST OPERABLE PART AS REQUIRED PER MECHANICAL PLAN. 17. CONTRACTOR IS RESPONSIBLE FOR TEST AND BALANCE OF HVAC AS REQUIRED PER NEW PARTITION LAYOUT AND IS TO PROVIDE ARCHITECT AND PROPERTY MANAGEMENT WITH NEW AIR BALANCE REPORT FROM AN APPROVED INDEPENDENT NEBB CERTIFIED HVAC CONTRACTOR PRIOR TO SUBSTANTIAL COMPLETITION. 18. CONTRACTOR TO RELOCATE EXISTING SPRINKLER HEADS AS REQUIRED PER CODE IN AREAS AFFECTED BY DEMOLITION/ CONSTRUCTION. SPRINKLER HEADS ARE TO BE CENTERED IN CEILING TILE. FIRE SPRINKLER CONTRACTOR IS RESPONSIBLE FOR PROVIDING NEW CALCULATIONS AND DRAWINGS AS A DEFERRED SUBMITTAL PRIOR TO COMMENCING ANY SPRINKLER WORK. 19. PROVIDE EXIT LIGHTS AS INDICATED ON THE MEP DRAWINGS. CONTRACTOR TO VERIFY QUANTITY AND LOCATIONS OF 24 HOUR EMERGENCY LIGHTS AND EXIT LIGHTS REQUIRED BY BUILDING INSPECTOR. EXIT SIGNS SHALL BE LOCATED IN DIRECTION OF TRAVEL TO NEAREST FIRE EXIT. EXIT SIGN DIRECTIONAL INDICATIONS IN DIRECTION OF NEAREST FIRE EXIT. 20. ALL NEW DOWN LIGHTS AND WALL WASHER GROUPINGS ARE TO BE ON SEPARATE CIRCUITS, UNLESS NOTED OTHERWISE. REFER TO ENGINEERED LIGHTING PLAN. 21. ALL NEW OR RELOCATED LIGHT FIXTURES ARE TO BE CENTERED IN CEILING TILE, UNLESS NOTED OTHERWISE. 22. IF MEP DRAWINGS ARE NOT PROVIDED, CONTRACTOR IS TO "DESIGN-BUILD" HVAC MECHANICAL SYSTEMS AS REQUIRED TO ACHIEVE REQUIRED DESIGN & CFM REQUIREMENTS PER ASHRAE & BUILDING STANDARDS. ALL DIFFUSERS, DUCTWORK, VAV BOXES, & THERMOSTATS ARE TO BE RELOCATED AND/OR PROVIDED NEW AS REQUIRED. FLEXIBLE DUCT IS NOT TO EXCEED 5'-0" IN LENGTH. 23. ALL NEW SWITCHES TO BE MOUNTED 48" TO HIGHEST OPERABLE PART TO COMPLY WITH ADA TITLE III REQUIREMENTS. 24. ALL NEW OUTLET RECEPTACLES AND COVER PLATES SHALL BE AS SPECIFIED ON SHEET A0.6 UNDER SECTION 26 00 00 ELECTRICAL UNLESS NOTED OTHERWISE. RETROFIT ALL EXISTING NON- STANDARD RECEPTACLES AND COVER PLATES TO MATCH NEW SPECIFIED RECEPTACLES AND COVER PLATES. 25. ALL EXISTING HVAC SHALL BE BROUGHT INTO COMPLIANCE WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES (INCLUDING, BUT NOT LIMITED TO) WRAPPING DUCTS WITH INSULATION. 26. CONTRACTOR SHALL ENSURE THAT ALL LIGHTING & MECHANICAL SYSTEMS COMPLY W/ THE REQUIREMENTS OF THE INTERNATIONAL ENERGY CONSERVATION CODE AS ADOPTED BY LOCAL CODE. 27. CONTRACTOR SHALL FIELD VERIFY EXISTING THERMOSTATS THROUGHOUT LIMIT OF WORK. WHEN ELECTRONIC DIGITAL CONTROLLED T-STAT IS TO BE USED, REFER TO BUILDING STANDARDS. REFER SPECIFICATION SHEETS FOR DETAIL SPECS. 28. AUDIBLE AND VISUAL ALARM DEVICES SHALL BE INSTALLED IN ALL COMMON USE EMPLOYEE WORK AREAS, INCLUDING BUT NOT LIMITED TO STORAGE ROOMS, WORK ROOMS, BREAK ROOMS, MEETING ROOMS, CONFERENCE ROOMS, ETC AND SHALL COMPLY WITH ALL STATE REGULATIONS. UNLESS NOTED OTHERWISE, ALL AUDIBLE AND VISUAL ALARM DEVICES SHALL BE WHITE WITH RED LETTERING AND CEILING MOUNTED. REFLECTED CEILING PLAN GENERAL NOTES REFLECTED CEILING PLAN LEGEND CEILING TYPES GWB, GYPSUM BOARD CEILING ACT-1; 2X2 XXX X-XX CEILING TYPE CEILING HEIGHT REFER TO FINISH SCHEDULE FOR CEILING SPECIFICATIONS. 24" X 24" LIGHT FIXTURE REFER TO LIGHTING SCHEDULE FOR SPECIFICATION SQUARE DOWNLIGHT REFER TO LIGHTING SCHEDULE FOR SPECIFICATION LIGHT FIXTURE TYPES EXIT SIGNAGE, BLDG STD LIGHT SWITCH LOCATION DIMMABLE LIGHT SWITCH LOCATION ROOM OCCUPANCY SENSOR WIRELESS ACCESS POINTS, REFER TO LOW VOLTAGE PLANS 24" X 48" LIGHT FIXTURE REFER TO LIGHTING SCHEDULE FOR SPECIFICATION 4 7/8" STANDARD WALL - FLOOR TO CEILING W/ ACOUSTIC INSULATION TEGULAR CEILING SHOWN FOR REFERENCE ONLY REFER TO SPECIFICATIONS FOR SPECIFIED CEILING J-MOLD EDGE TRIM TYP. ALL LOCATIONS FULL BATT INSULATION IN ALL WALL CAVITIES BRACING TO STRUCTURE ABOVE (E) STRUCTURE ABOVE, TYP. (N.I.C.) ACOUSTIC BATT INSULATION ABOVE FINISH CEILING 3'-0" ON EACH SIDE OF WALL REF. RCPEQ EQ CONFERENCE 512 OPEN 509 OFFICE 503 OPEN 507 OFFICE 513 OFFICE 514 OFFICE 502 OFFICE 501 OFFICE 510 OFFICE 511 UC A A A A A A A H1 H1 C C C C C C C C C C A A A A A A A A A A A A A A A A A A A A A B A A A A A A B A B TYP. UNO ACT-1 8' -5" 1 TYP. THROUGHOUT LIMIT OF WORK 2 3 OPEN 508 15 A7.1 57 A3.1 TYP. 4 5 53 A7.1 OFFICE 505 HUDDLE 504 OFFICE 506 15 A7.1 4 EQ E Q B B B B UC 53 A7.1 C LINE OF VERTICAL FRAME IN ELEVATION CEILING EDGE TRIM TYP. ALL LOCATIONS 3 5/8" METAL STUD FRAMING REFER TO ALLOWABLE HEIGHTS CHART FOR GUAGE AND SPACING CONTINUOUS ACOUSTIC MASTIC AT TOP TRACK; SLIP TRACK AS REQUIRED REF. RCP (E) CONC. DECK ABOVE (N.I.C.) ACOUSTIC BATT INSULATION ABOVE FINISH CEILING 4'-0" ON EACH SIDE OF WALL TEGULAR CEILING SHOWN FOR REFERENCE ONLY REFER TO SHEET A3.1 FOR SPECIFIED CEILING © DLR GroupRevisions -ALL PROJECT COMMUNICATION TO BE SENT TO MARK REED/MONICA BATES, NOT AOR.5/25/2021 3:31:49 PMC:\Revit\_2020\KH Indianapolis Expansion CD's v_20_hgriffo.rvt23-21100-00 5.26.2021 BID/PERMIT REFLECTED CEILING PLAN A3.1250 E. 96TH ST. #580INDIANAPOLIS, IN 46240INDIANAPOLIS, INDIANALIGHTING FIXTURE SCHEDULE.. TYPE FIXTURE INFORMATION LAMP COMMENTSMANUFACTUER CATALOG NUMBER DESCRIPTION A LSI INDUSTRIES LPEC24-LED-60L-UNV-DIM1-35 RECESSED LED 2' X 4' TROFFER LED/3500K/80 +CRI RECESSED IN CEILING TILE. 'AE' IS AN EMERGENCY FIXTURE PLACED BY MEP B LSI INDUSTRIES LPEC22-LED-55L-UNV-DIM1-35 RECESSED LED 2' X 2' TROFFER LED/3500K/80 +CRI C GOTHAM EVO-SQ-35/15-6AR-LSS-MVOLT-EZ10-TR W6 6" SQUARE DOWNLIGHT RECESSED IN CENTER OF CEILING TILE LED H1 EUREKA CYCLE 4800-36-LED-35-120-DV-RDP-AC-60-WHM DECORATIVE FIXTURE LED UC LITHONIA RAZ-24IN-30K-90CRI-(BLANK)-RAZTRAN S24MVOLT-RAX ERC UNDER CABINET LED 1. ALL EMERGENCY FIXTURES TO BE INTEGRATED INTO THE LIGHT FIXTURES. NO "FROG EYES". REFER TO MEP FOR LOCATIONS 2. GENERAL CONTRACTOR AND CEILING CONTRACTOR TO REFER TO DETAIL #56 THIS SHEET FOR ABOVE CEILING INSULATION REQUIRED AT ALL PARTITIONS NOT SCHEDULED TO GO TO DECK. 3. CONTRACTOR TO PROVIDE HOUSE AIR (SUPPLY) AND RETURN IN EACH PRIVATE OFFICE AND TENANT SERVER ROOM. 4. CEILING GRID/LIGHTING TO BE CENTERED OVER FURNITURE. COODINATE WITH FURNITURE VENDOR. 5. ALIGN NEW GRID/TILE WITH EXISTING AND CONTINUE LIGHTING FIXTURE LAYOUT FROM EXISTING OPEN OFFICE SPACE INTO NEW SCOPE OF WORK. 13612 24 48 PLAN NORTH TRUE NORTH KEYED NOTES SCALE: 3" = 1'-0"A3.1 56 CEILING INSULATION SECTIONNOTE: REFER TO ELECTRICAL PLANS FOR COORDINATION AND ADDITIONAL REQUIREMENTS SCALE: 3" = 1'-0"A3.1 57 HEADER AT VIA FRONT (P20) SECTION. 07/19/21