Loading...
HomeMy WebLinkAboutC011.0_2020-266_P_GD1.1.DPTBM#4 = 810.78HARROWGATE ADDITIONP.B . 2 , P G . 2 0 3 - 2 0 5LOT 59LOT 60LOT 61LOT 62ADJOINER44551152233666788899910101010111111111212131414SFSFSFSFCONSTRUCTIONENTRANCESILT FENCE (TYP.)SEDIMENT BAG INLETPROTECTION (TYP.)SF SF SF SFSFSFSF SF SF SF SF SFSF SFSFSF309003060INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! CONSULTANTPROJECT NUMBER: TLF-2020-266CARMEL CLAY SCHOOLSPROJECT ISSUE DATE: 10.14.2020DRAWN BY: HHWREV.NO.DESCRIPTIONDATETAC10/14/2020ACONSTRUCTION DOCUMENTSWWW.FHAI.COMARCHITECT317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC.CARMEL HIGHSCHOOL520 E MAIN STREETCARMEL, IN 46032PARKING LOTADDITION19700317No.RESPONSE TO TAC COMMENTS11/25/2020BGD1.1DEMOLITION PLANDEMOLITION LEGENDAPPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVALAPPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVALAPPROXIMATE LIMITS OF TREE PROTECTION FENCING(SEE DETAIL ON SHEET L2.1) DEMOLITION KEYNOTES1.REMOVE ASPHALT PAVEMENT FULL DEPTH2.REMOVE EXISTING LIGHT POLE AND RELATED FOUNDATION3.REMOVE EXISTING UNDERGROUND ELECTRICAL LINE4.REMOVE EXISTING CONCRETE CURB5.PAVEMENT SAWCUT LINE6.REMOVE EXISTING TREE7.REMOVE EXISTING YARD DRAIN AND PLUG END OF PIPE8.REMOVE EXISTING CABLE FENCE AND RELATED WOOD POSTS9.PROTECT EXISTING STORM STRUCTURE TO REMAIN IN PLACE10.PROTECT EXISTING STORM SEWER LINE TO REMAIN IN PLACE11.PROTECT EXISTING WATER LINE TO REMAIN IN PLACE12.PROTECT EXISTING ELECTRICAL LINE TO REMAIN IN PLACE13.PROTECT EXISTING FIBER OPTIC LINE TO REMAIN IN PLACE14.TREE PROTECTION FENCINGDEMOLITION NOTE:DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TODEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THECONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATEALL ITEMS WHICH INTERFERE NEW CONSTRUCTION.1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDEDBY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALLSUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECTAREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTHPRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TOTHE ENGINEER.4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVEDSTORM WATER MANAGEMENT PERMIT.5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THERESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIREDFOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSEDDEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVEWITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TOWITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TOTHE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THECONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THECITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTINGCONDITION OF THE RIGHT-OF-WAY.GENERAL NOTESEROSION CONTROL LEGENDSF