Loading...
HomeMy WebLinkAboutC111.0_2020-266_P_G1.1.SPTBM#4 = 810.78HARROWGATE ADDITIONP.B . 2 , P G . 2 0 3 - 2 0 5LOT 59LOT 60LOT 61LOT 62ADJOINER11112222224224420.0'25.0'40.0'25.0'40.0'25.0'20.0'9.0' 126.0' 11.0' 25.0' 20.0'12446.5'5.5'555557EXISTINGCROSSWALK15.0'R45.0'R10.0'R10.0'R5.0 'R5.0'R4.5'R4.5'R4.5'R5.0'R5.0 'R5.0'R20.0'222236±23.3' 9.0' 9.0' TYP.42.0'48.0'21.6'PROPERTY LINER5.5'R5.5'TYP. 72.0'153.0'22.0'1210141488232312141756.0'2150.0'336.5'18.5'15.0'83309003060INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! CONSULTANTPROJECT NUMBER: TLF-2020-266CARMEL CLAY SCHOOLSPROJECT ISSUE DATE: 10.14.2020DRAWN BY: HHWREV.NO.DESCRIPTIONDATETAC10/14/2020ACONSTRUCTION DOCUMENTSWWW.FHAI.COMARCHITECT317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC.CARMEL HIGHSCHOOL520 E MAIN STREETCARMEL, IN 46032PARKING LOTADDITION19700317No.RESPONSE TO TAC COMMENTS11/25/2020BSITE KEYNOTESMEDIUM DUTY ASPHALT PAVEMENT (SEE DETAIL ON SHEET G5.1)STRAIGHT CONCRETE CURB (SEE DETAIL ON SHEET G5.1)CONCRETE WALK (SEE DETAIL ON SHEET G5.1)MONOLITHIC CURB AND WALK (SEE DETAIL ON SHEET G5.1)ADA ACCESSIBLE CURB RAMP TYPE "H" (SEE DETAIL ON SHEET G5.1)ADA ACCESSIBLE CURB RAMP TYPE "G" (SEE DETAIL ON SHEET G5.1)PAINTED PEDESTRIAN CROSSWALK(CROSSWALK PAINT AND PATTERN TO MATCH EXISTING)ADA ACCESSIBLE CONCRETE RAMP WITH HANDRAILS (SEE DETAIL ON SHEET G5.1)12345678PROPOSED SITE LEGENDMEDIUM DUTY ASPHALT PAVEMENTPARKING SUMMARYG1.1SITE PLAN1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDEDBY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALLSUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECTAREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTHPRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TOTHE ENGINEER.4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT.5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIREDFOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSEDDEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVEWITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TOWITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TOTHE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THECONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THECITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTINGCONDITION OF THE RIGHT-OF-WAY.GENERAL NOTES