HomeMy WebLinkAboutC320.0_2020-266_M_G3.2.ECSF
SF
SF
206002040INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! CONSULTANTPROJECT NUMBER: TLF-2020-266CARMEL CLAY SCHOOLSPROJECT ISSUE DATE: 10.14.2020DRAWN BY: HHWREV.NO.DESCRIPTIONDATETAC10/14/2020ACONSTRUCTION DOCUMENTSWWW.FHAI.COMARCHITECT317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC.CARMEL HIGHSCHOOL520 E MAIN STREETCARMEL, IN 46032PARKING LOTADDITION19700317No.EROSION CONTROL PLAN - PAVING AT MURRAY FIELDG3.2EROSION CONTROL PLANEROSION CONTROL LEGENDSFEROSION CONTROL NOTES1.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MY BE REQUIRED BYTHE INSPECTOR.2.DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORKAREAS IN AN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORELEAVING THE SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHERPAVED AREAS.3.ALL PROPOSED EROSION AND SEDIMENT CONTROL SHALL BE IN CONFORMANCEWITH CHAPTER 600 OF THE CITY OF CARMEL STORMWATER TECHNICALSTANDARDS MANUAL, LATEST EDITION. DISCREPANCIES BETWEEN THE PLANSAND THE MANUAL SHALL NOT ALLEVIATE THE CONTRACTOR FROM ADHERING TOTHE REQUIREMENTS AS SET FORTH IN THE MANUAL.1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDEDBY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALLSUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECTAREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTHPRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TOTHE ENGINEER.4.SEE EROSION CONTROL DETAIL ON SHEET G4.2GENERAL NOTES