Loading...
HomeMy WebLinkAboutC011.0_2020-266_P_GD1.1.DPTBM#4 = 810.78 HARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 59 LOT 60 LOT 61 LOT 62 ADJOINER 4 4 5 5 1 1 5 2 2 3 3 6 6 6 7 8 8 8 9 9 9 10 10 10 10 11 11 11 11 12 12 13 14 14 S F SF SF SFCONSTRUCTION ENTRANCE SILT FENCE (TYP.) SEDIMENT BAG INLET PROTECTION (TYP.)SFSFSFSF SF SF SFSFSFSFSFSFS F SF SF SF30 900 30 60 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! CONSULTANT PROJECT NUMBER: TLF-2020-266 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 10.14.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC 10/14/2020A CONSTRUCTION DOCUMENTS WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL 520 E MAIN STREET CARMEL, IN 46032 PARKING LOT ADDITION 19700317 No. RESPONSE TO TAC COMMENTS 11/25/2020B GD1.1 DEMOLITION PLAN DEMOLITION LEGEND APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL APPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL APPROXIMATE LIMITS OF TREE PROTECTION FENCING (SEE DETAIL ON SHEET L2.1) DEMOLITION KEYNOTES 1. REMOVE ASPHALT PAVEMENT FULL DEPTH 2. REMOVE EXISTING LIGHT POLE AND RELATED FOUNDATION 3. REMOVE EXISTING UNDERGROUND ELECTRICAL LINE 4. REMOVE EXISTING CONCRETE CURB 5. PAVEMENT SAWCUT LINE 6. REMOVE EXISTING TREE 7. REMOVE EXISTING YARD DRAIN AND PLUG END OF PIPE 8. REMOVE EXISTING CABLE FENCE AND RELATED WOOD POSTS 9. PROTECT EXISTING STORM STRUCTURE TO REMAIN IN PLACE 10. PROTECT EXISTING STORM SEWER LINE TO REMAIN IN PLACE 11. PROTECT EXISTING WATER LINE TO REMAIN IN PLACE 12. PROTECT EXISTING ELECTRICAL LINE TO REMAIN IN PLACE 13. PROTECT EXISTING FIBER OPTIC LINE TO REMAIN IN PLACE 14. TREE PROTECTION FENCING DEMOLITION NOTE: DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. GENERAL NOTES EROSION CONTROL LEGEND SF 07/21/21