Loading...
HomeMy WebLinkAboutC220.0_2020-266_M_G2.2.GPAPPROXIMATE LIMITS OF DISTURBED AREA BENCHMARKS: 20 600 20 40 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! GRADING PLAN LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB EDGE OF PAVEMENT FLOWLINE EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED CURB ELEVATION PROPOSED SURFACE DRAINAGE FLOW ARROW MEG TC BC EP TC BC 750.65 FL CONSULTANT PROJECT NUMBER: TLF-2020-266 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 10.14.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC 10/14/2020A CONSTRUCTION DOCUMENTS WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL 520 E MAIN STREET CARMEL, IN 46032 PARKING LOT ADDITION 19700317 No. RESPONSE TO TAC COMMENTS 11/25/2020B GRADING PLAN - PAVING AT MURRAY FIELD G2.2 GRADING PLAN USGS BENCHMARK INFORMATION 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. GENERAL NOTES 07/21/21