Loading...
HomeMy WebLinkAboutC320.0_2020-266_M_G3.2.ECSFSFSF20 600 20 40 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! CONSULTANT PROJECT NUMBER: TLF-2020-266 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 10.14.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC 10/14/2020A CONSTRUCTION DOCUMENTS WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL 520 E MAIN STREET CARMEL, IN 46032 PARKING LOT ADDITION 19700317 No. EROSION CONTROL PLAN - PAVING AT MURRAY FIELD G3.2 EROSION CONTROL PLAN EROSION CONTROL LEGEND SF EROSION CONTROL NOTES 1. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MY BE REQUIRED BY THE INSPECTOR. 2. DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING THE SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHER PAVED AREAS. 3. ALL PROPOSED EROSION AND SEDIMENT CONTROL SHALL BE IN CONFORMANCE WITH CHAPTER 600 OF THE CITY OF CARMEL STORMWATER TECHNICAL STANDARDS MANUAL, LATEST EDITION. DISCREPANCIES BETWEEN THE PLANS AND THE MANUAL SHALL NOT ALLEVIATE THE CONTRACTOR FROM ADHERING TO THE REQUIREMENTS AS SET FORTH IN THE MANUAL. 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. SEE EROSION CONTROL DETAIL ON SHEET G4.2 GENERAL NOTES 07/21/21