Loading...
HomeMy WebLinkAboutC420.0_2020-266.G4.2.ECDAREA INLET SEDIMENT BAG DETAIL SILT FENCE DETAIL METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES WOOD OR METAL STAKES TO SECURE THE STRAW BALES (2 PER STRAW BALE) STRAW BALE (ALTERNATIVE MATERIALS OR PRODUCTS MAY BE USED TO PROVIDE STRUCTURAL CONTAINMENT. ALTERNATIVE MATERIALS OR PRODUCTS WILL REQUIRE DESIGN MODIFICATION.) PLAN VIEW NOT TO SCALE L = INSIDE LENGTH (10' MIN) W = INSIDE WIDTH (10' MIN) POLYETHYLENE LINING (10 MIL); THE LINING SHALL EXTEND OVER THE STRAW BALES. COMPACTED SOIL MATERIAL SECTION A-A NOT TO SCALE EXCAVATION SANDBAGS OR OTHER APPROPRIATE ANCHORING SYSTEM TO SECURE THE POLYETHYLENE LINING ASs = T L = TOP LENGTH OF EXCAVATION (10' MIN) B L = BOTTOM LENGTH OF EXCAVATION T W = TOP WIDTH OF EXCAVATION (10' MIN) B W = BOTTOM WIDTH OF EXCAVATION ASS = ANCHORING SYSTEM TYPE AND SPACING D = REQUIRED DEPTH TO CONTAIN WASHOUT INCLUDING 12" RAINFALL PLUS 12" FREEBOARD POLYETHYLENE LINING (10 MIL) SECTION B-B NOT TO SCALE SANDBAGS OR OTHER APPROPRIATE ANCHORING SYSTEM TO SECURE THE POLYETHYLENE LINING WOOD OR METAL STAKES TO SECURE THE STRAW BALES (2 PER STRAW BALE) L=10' STRAW BALES ENTRENCHED 4 INCHES INTO THE SOIL D = 2' A A W=10' TL=10' BW=8' TW=10' BL=8' PLAN VIEW NOT TO SCALE ABOVE GRADE SYSTEM BELOW GRADE SYSTEM STANDARD WASHOUT DETAIL B CONSTRUCTION ENTRANCE 4 2 5 1 3A 3B NOTE: REFER TO GENERAL STAPLE PATTERN GUIDE FOR CORRECT STAPLE PATTERN RECOMMENDATIONS FOR SLOPE INSTALLATIONS. 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" OVERLAP. 5. WHEN BLANKETS MUST BE SPLICED DOWN THE SLOPE, PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH APPROXIMATELY 4" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART. EROSION CONTROL BLANKET SLOPE INSTALLATION CONSULTANT PROJECT NUMBER: TLF-2020-266 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 10.14.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC 10/14/2020A CONSTRUCTION DOCUMENTS WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL 520 E MAIN STREET CARMEL, IN 46032 PARKING LOT ADDITION 19700317 No. RESPONSE TO TAC COMMENTS 11/25/2020B G4.2 EROSION CONTROL DETAILS 07/21/21