Loading...
HomeMy WebLinkAboutG610.0_2020-266_P_SU1.1.UPSTSTSTSTST STSTST ST TBM#4 = 810.78 HARROWGATE ADDITION203-205LOT 61 LOT 62 ADJOINER 4 4 4 5 5 4 5 6 3 3 11 1 1 1 1 2 STR. #101 STR. #102 STR. #104 STR. #105 STR. #103 STR. #106 STR. #107 STR. #109 STR. #110 STR. #111 OUTLET CONTROL STRUCTURE STR. #112 5 1 7 7 8 8 8 8 8 8 9 9 9 9 9 9 25'BMP EASEMENTBMP EASEMENT25' BMP EASE M E N T 25'10 STR. #108 UNDERGROUND DETENTION BOTTOM OF CHAMBERS = 801.25 TOP OF CHAMBERS = 806.25 10 YEAR ELEV. = 803.72 100 YEAR ELEV. = 806.04 12 30 900 30 60 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. SEE SHEET G2.1 FOR GRADING PLAN. 5. THE PROPOSED STORM SEWER SYSTEM FOR THIS PROJECT WILL BE PRIVATE OWNED. 6. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 7. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 8. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. GENERAL NOTES CONSULTANT PROJECT NUMBER: TLF-2020-266 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 10.14.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC 10/14/2020A CONSTRUCTION DOCUMENTS WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL 520 E MAIN STREET CARMEL, IN 46032 PARKING LOT ADDITION 19700317 No. RESPONSE TO TAC COMMENTS 11/25/2020B RESPONSE TO TAC COMMENTS 12/29/2020C UTILITY KEYNOTES 1. PROPOSED 12" HDPE PIPE (SEE STORM SEWER STRUCTURE DATA TABLE THIS SHEET) 2. PROPOSED 15" HDPE PIPE (SEE STORM SEWER STRUCTURE DATA TABLE THIS SHEET) 3. PROPOSED UNDERGROUND DETENTION CHAMBERS WITH ISOLATOR ROW, BMP-2 (SEE UNDERGROUND DETENTION DETAILS ON SHEET SU3.1) 4. PROPOSED STORM INLET TYPE "A" (SEE DETAIL ON SHEET SU2.1) 5. PROPOSED STORM MANHOLE TYPE "C" (SEE DETAIL ON SHEET SU2.1) 6. PROPOSED AQUA-SWIRL "AS-7", BMP-1 (SEE DETAIL ON SHEET SU2.2) 7. PROPOSED 30" NYLOPLAST MANHOLE (SEE DETAIL ON SHEET SU3.1) 8. PROPOSED PAVEMENT UNDERDRAINS (SEE DETAIL ON SHEET SU2.1) 9. PROPOSED LIGHT POLE (SEE LIGHTING PHOTOMETRIC PLAN, SHEET E2.02) 10. PROPOSED 4" PVC INSPECTION PORT (SEE DETAIL ON SHEET SU3.1) 11. PROPOSED 12" RCP (SEE STORM SEWER STRUCTURE DATA TABLE THIS SHEET) 12. CONTRACTOR TO VERIFY LOCATION AND ELEVATION OF EXISTING 18" STORM SEWER PRIOR TO INSTALLATION OF PROPOSED UNDERGROUND DETENTION SYSTEM. IF CONFLICT EXIST BETWEEN 18" STORM SEWER AND DETENTION SYSTEM NOTIFY ENGINEER IMMEDIATELY SO MODIFICATIONS TO DETENTION SYSTEM CAN BE MADE. SU1.1 UTILITY PLAN THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS, OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED AS-BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL. STORM SEWER NOTE 07/21/21