HomeMy WebLinkAboutRitcher 005 Elec 3 Line Diagram(E) LOADS N G SUPPLY SIDE CONNECTION PER NEC 230.46, NEC 230.79(D), NEC 705.12(A) N L2 L1 (E)200A / 2P L2 L1 (E)200A MAIN SERVICE PANEL (E)200A / 2P MAIN BREAKER 15 (E) GROUNDING ELECTRODE(S) INTERCONNECTION NOTES 1. SUPPLY SIDE INTERCONNECTION ACCORDING TO [NEC705.12(A)]. 2. SUPPLY SIDE PV DISCONNECT SHALL BE LISTED AS SUITABLE FOR USE AS SERVICE EQUIPMENT [NEC 690.13(C)] 3. SUPPLY SIDE PV DISCONNECT IS GROUNDED AND BONDED AS A SERVICE WITH A SEPARATE SUPPLY SIDE BONDING JUMPER SIZED PER [NEC 250.102(C)(1)] TO CONNECT TO THE EXISTING RESIDENCE GROUNDING ELECTRODE SYSTEM BY A NEW GROUNDING ELECTRODE CONDUCTOR SIZED PER [NEC 250.66]. THE EXISTING GROUNDING ELECTRODE SYSTEM TO COMPLY WITH [NEC 250 III]. [NEC 690.47]. DISCONNECT NOTES 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS) 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH N EGC 80A FUSES CLASS R PV AC DISCONNECT FUSED, 100kAIC - R LOCKABLE, VISIBLE OPEN SERVICE RATED 100A, 240V, 2-POLE 16 GEC (N) 6 AWG COPPER, SOLID (GEC) TO BE IRREVERSIBLY SPLICED TO (E) GEC TO COMPLY WITH NEC 250.64(D)(1) 120/240 VAC 60HZ 1 PHASE TO UTILITY GRID (E) L1 N L2 N G L2 L1 (N)20A/2P 2 1 L1 L2 G (1) CIRCUIT OF 13 MODULES 2 1 L1 L2 G (1) CIRCUIT OF 12 MODULES (N)20A/2P L2 L1 L2 L1 (N)20A/2P 2 1 L1 L2 G (1) CIRCUIT OF 12 MODULES L1 L2 G L1 L2 G L1 L2 G G L2 L1 (N)20A/2P 2 1 L1 L2 G (1) CIRCUIT OF 12 MODULESL1 L2 G 3 G G G G G JUNCTION BOX JUNCTION BOX JUNCTION BOX JUNCTION BOX + -+ -++--++-- + -+ -++--++-- + -+ -++--++-- + -+ -++--++-- (49) JinKO Solar Eagle JKM375M-6RL3-B UL 1703 COMPLIANT (49) Enphase Energy IQ7PLUS-72-2-US MICRO INVERTERS UL 1741 COMPLIANT 12 MODULES MAX FOR ALL SUB-BRANCH CIRCUIT(S) TO COMPLY WITH VRISE CALCSEnphase IQ Combiner 3 X-IQ-AM1-240-3 (SOLAR LOADS ONLY) JUNCTION BOX (OPTIONAL IF UF-B CABLE USED FOR ENTIRE HOMERUN) DATE DRAWING BY PROJECT NUMBER SHEET NAME PAGE NUMBER REVISION CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. ENPHASE ENERGY 362648 June 4, 2021SITE INFORMATION:Sara Elizabeth Richter13956 Four Seasons WayCarmel, Indiana 46074DC SYSTEM SIZE: 18.375 kW DCCONTRACTOR: BRS FIELD OPS 385.498.6700 PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 NABCEP CERTIFIED PV5 ELEC. 3 LINE DIAG. 0 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM 49 INVERTERS x 290.4 W AC = 14.23 kW AC PANEL WATTAGE = 375 W DC Utility Company: Duke Energy IN Permit Issuer: City of Carmel 07/27/21