Loading...
HomeMy WebLinkAboutCPC North Indy_A100 (1)02.01 02.0202.02 02.03 02.04 02.03 02.03 02.03 02.03 02.09 02.03 02.10 02.11 02.12 02.13 02.03 02.14 02.14 02.14 02.14 02.14 02.1502.15 02.15 02.15 02.15 02.16 02.1302.13 02.2002.20 02.13 02.11 06.01 06.04 06.05 06.06 22.01 22.02 09.01 09.01 06.01 06.08 A.100 6 A.1005 05.01 05.01 09.02 09.03 09.03 09.03 09.03 09.03 09.03 09.04 22' - 9 1/4" 5' - 0"8' - 0"8' - 0" 09.05 02.01 02.02 02.03 09.01 02.03 26.01 26.01 26.01 26.0126.01 26.0126.01 09.01 09.01 09.01 06.01 09.01 09.02 02.01 02.03 02.01 02.03 26.03 26.03 02.01 02.02 02.03 CH1 CH1 CH1 CH1CH1 CH3 CH3 T4 CH3CH3 CH2 T2 CH2CH2 T2 CH2 CH2CH2 CH2CH2 CH4CH4 CH4 CH4 CH4CH4 T3 T1 PRINTER PRINTERFAXCUTCH3 CH3 CH3 T1 MI1 MI2MI2MI2 4' - 0"3' - 0 1/8" EQ 5' - 0" EQ MI1 3' - 0 1/8" 4' - 0"EQ 3' - 0" 2" 3' - 0" 2" 3' - 0" EQ MI2MI2 MI2 08.01 26.01 12.02 ASPEN PROJECT #: SEAL:9645 Lincoln‐Way Lane Suite 201  Frankfort, IL. 60423CONSTRUCTION SET COPYRIGHT ASPEN GROUP INC. USE OF THESE DOCUMENTS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED, PUBLICATION THEREOF IS EXPRESSLY LIMITED TO SUCH USE. RE-USE, REPRODUCTION, OR PUBLICATION IN WHOLE OR IN PART IS PROHIBITED. READ DIMENSIONS. DO NOT SCALE DRAWINGS. REPORT ANY INCONSISTENCIES TO THE ARCHITECT IMMEDIATELY. EXPIRES: 6/24/2021 11:22:27 AMCollege Park Church07‐00552606 West 96th Street, Indianapolis, INA.100 LOBBY PLANS 1/8" = 1'-0"1 LOBBY DEMO PLAN 1/8" = 1'-0"2 LOBBY FLOOR AND FLOOR FINISH PLAN 1/8" = 1'-0" 4 LOBBY REFLECTED CEILING PLAN DEMOLITION PLAN NOTES DIVISION 02 - EXISTING CONDITIONS 02.01 REMOVE EXISTING DOOR AND FRAME 02.02 REMOVE EXISTING PARTITION 02.03 EXISTING CEILING TO REMAIN 02.04 PATCH EXISING/REMAINING PARTITION AS REQUIRED 02.09 EXISTING ELECTRICAL PANEL TO REMAIN 02.10 EXISTING CEILING HATCH TO BE RELOCATED 02.11 REMOVE EXISTING CABINETS/OVERHEADS AND COUNTER TOPS, SALVAGE FOR REUSE 02.12 EXISTING APPLIANCES TO BE REMOVED. CAP AND ABANDON ANY WATER LINES/DRAINS 02.13 EXISTING LIGHT FIXTURES TO BE REMOVED. PATCH AND REPAIR CEILING AS REQUIRED FOR NEW SURFACE MOUNTED LINEAR FIXTURES 02.14 EXISTING MECH AND SPRINKLER TO REMAIN 02.15 REMOVE EXISTING FLOORING. PATCH AND REPAIR FLOOR FOR NEW FINISH AS NOTED 02.16 EXISTING FLOORING AND WALL BASE TO REMAIN 02.20 PREP ALL EXISTING GYP BD CEILING FOR NEW TEXTURE 1/8" = 1'-0" 3 LOBBY FURNITURE PLAN REFLECTED CEILING PLAN NOTES DIVISION 02 - EXISTING CONDITIONS 02.01 EXISTING CEILING TO REMAIN 02.02 EXISTNG LIGHT FIXTURES TO REMAIN 02.03 EXISTING UTILITIES TO REMAIN DIVISION 06 - WOOD, PLASTICS COMPOSITES 06.01 DECORATIVE PANEL AND CEILING. SEE CASEWORK PLAN FOR ADDITIONAL INFORMATION DIVISION 09 -FINISHES 09.01 EXISTING GYP BOARD CEILING TO RECIEVE NEW TEXTURE SURFACE 09.02 NEW BULKHEAD TO SIT 2-3" BELOW LOWEST CEILING DIVISION 26 - ELECTRICAL 26.01 REMOVE EXISTING DOME LIGHTS, PROVIDE NEW 1x4 SURFACE MOUNTED LINEAR LED IN SAME LOCATION. LOCATION AND QUANTITY TO BE VERIFIED IN FIELD 26.03 NEW SURFACE MOUNTED LINEAR LED 1x4 LIGHT FIXTURE ARCHITECTURE PLAN NOTES DIVISION 05 - METALS 05.01 FURR WALL W/ 2 1/2" MTL STUD, SOUND INSULATION AND 5/8" GYP BD DIVISION 06 - WOOD, PLASTICS COMPOSITES 06.01 INSTALL SALVAGED COPY ROOM CABINETS AND OVERHEADS. MODIFY AS REQUIRED. 06.04 NEW BASECABINETS WITH COUNTER TOP AND STANDING HEIGHT COUNTER 06.05 NEW CUSTOM TABLE WITH PLAM TOP AND WOOD LEGS 06.06 NEW BASE AND UPPER CABINETS WITH COUNTER TOP. SINK BASE TO BE ADA APPROVED 06.08 PROVIDE ALTERNATE PRICE TO REUSE EXISTING KITCHEN CABINETS AND FILL IN WITH NEW TO MATCH. PROVIDE NEW PLAM COUNTER TOP DIVISION 08 - OPENINGS 08.01 PROVIDE PUSH BUTTON CONTROL FOR RIGHT SIDE DOOR, RIGHT HAND DIVISION 09 -FINISHES 09.01 ALL WALLS TO BE PAINTED SHERWIN WILLIAMS SW7643 PUSSYWILLOW, ALL DOOR FRAMES TO BE PAINTED PPG 1002-6 GIBRALTAR GRAY 09.02 FROSTED GLASS LOOK VINYL ATTACHED TO WINDOW GLASS. VINYL TO LEAVE 2" BORDER AROUND PERIMETER FOR VISIBILITY 09.03 EXISTING FLOORING TO REMAIN 09.04 PROVIDE NEW FLOORING. FLOORFOLIO 636-671 WOOD PLANK LOOK LVT 09.05 PROVIDE NEW AREA RUG. PATCRAFT SEVILLE, COLOR TBD DIVISION 12 - FURNISHINGS 12.01 PROVIDE ALTERNATE PRICE FOR TABLE 12.02 PROVIDE NEW SWIFT SPACE MOBILE WELCOME DESK - FUSED 39"H x 66"L DESK WITH BF PEDESTAL MOUNTED UNDER SURFACE AND LOCKABLE DRAWERS DIVISION 22 - PLUMBING 22.01 PLUMBING FOR NEW SINK TO BE PULLED EXISTING WATER LINE 22.02 NEW SINK DIVISION 26 - ELECTRICAL 26.01 PROVIDE POWER/DATA FOR NEW WELCOME DESK E1020 Furniture Schedule TagCount Description Manufacturer Model Furniture Finish 345 Not Used 622 Not Used CH1 5 Lounge Chair Global Vitrola high backUpholstery - Std Grade A Culp Contract, Std. Wood Leg CH2 8 Brooke Barstool - Wood Seat/Back Grand Rapids Chair Company W520BS-W Wood Finish -Black CH3 7 Brody Lounge Chair - Armless Carson's Contract 1173 Upholstery - Culp Contract Connelly Crow, Wood Leg Milk Chocolate CH4 6 Brooke Chair - Wood Seat/BackGrand Rapids Chair Company W520-W Wood Finish - Black MI1 1 Harmony Magnetic White Board 4'x5' Square Corners Ghent HMYSM45 Denim MI2 1 Harmony Magnetic White Board 3'x4' Square Corners (installed vertically) Ghent HMYSM34 Clear T1 2 Occasional Table 24"D x 20"H Carson's Contract Verge Series Upholstery Culp Contract Archetype Quartz, Laminate Top - Black T2 2 42"H 24"D Orbit Table Grand Rapids Chair Company OR24R-42 Top - Nutmeg Base - Black T3 1 Occasional Table 36"D x 17"H Carson's Contract Verge Series Upholstery Culp Contract Aretype Quartz, Laminate Top - Black T4 1 36"x30"H Orbit Table Grand Rapids Chair Company OR36S-30 Top - Nutmeg, Base - Black 1/2" = 1'-0" 5 BOARD ELEV 1 1/2" = 1'-0"6 BOARD ELEV 2 KEY PLAN REVISIONS No. Date By Description LOBBY ENTRY 1 1/8" = 1'-0" 8 ENTRY 1 PLAN 12/31/2021 07/27/21