HomeMy WebLinkAboutCC-03-20-00-01 Hazel Dell PaymtResolution No. CC-03-20-00-01
A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL,
INDIANA APPROVING PAYMENT OF CONSTRUCTION COSTS FOR HAZEL
DELL BOND PROJECT
WHEREAS, pursuant to Article III, Section 3.01 (b) of the Trust Indenture by and
among the City of Carmel Redevelopment Authority and Fifth Third Bank of Central
Indiana, dated as of August 1, 1997, approval by the Common Council is required prior
to payments from the Construction Fund therein described upon presentation of
architect' s or engineer' s certificates of work completed and materials furnished;
WHEREAS, American Consulting Engineers, Inc., has presented such certificates
regarding the Construction Project Invoices attached hereto as Exhibit A.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Carmel, Indiana, that the Construction Project Invoices attached hereto as Exhibit A are
hereby approved for payment from the Construction Fund described in the above-
referenced Trust Indenture.
PASSED by the Common Council of the City of Carmel, Indiana this
of/~ckcc ~x ,2000, by a vote of (-O ayes and 0 nays.
day
COMMON OF THE CITY 'OF CR.n~~en
e~~g O~ce~r"
_~;,-'~/n Kirby ~
~obe~ Ba~reall
Wayne Wilson
ATTEST:
Diana L. Cordray, IAMC, Clerk-Treasure/r~
Presented by me to the Mayor of the City of Carreel, Indiana the 52,J day of
,AA ctfc~ ,2000. -,
Dian rdray, IXMC, Cle asurer
Approved by me, Mayor of the City of Carmel, Indiana, this 2 [ of
~n,9 rc/~ ,2000.
ATTEST:
Brainard, Mayor
Dia 'naL~~Cord "r~a'y,~IqAlVl~, C~erk- reasurer
CITY OF CARMEL REDEVELOPMENT AUTHORITY
CONSTRUCTION FUND PAYMENT REQUISITION
TO:
FiRh Third Bank of Central Indiana, as Trustee
251 North Illinois Street
Suite 1000
Indianapolis, Indiana 46204
Attn: Corporate Trust Department
Date: March 20, 2000
Trust Indenture between City of Camel Redevelopment Authority and FiRh
Third Bank of Central Indiana, as Trustee, dated as of August 1, 1997 (the
"Trust Indenture")
AFFIDAVIT
STATE OF INDIANA
COUNTY OF HAMILTON
SS:
The undersigned, having been duly sworn upon her oath, certifies that:
She has been designated by the Carmel Redevelopment Authority as an individual
authorized to execute and present affidavits on the Authofity's behalf relating to
payments from the Construction Fund for items that are not subject to certification by
the architect or engineer, in accordance with Article IV, Section 3.0 l(b) of said Trust
Indenture.
o
The amounts set forth in Exhibit A hereto are requested to be paid to the respective
Payees identified therein for the services or assets described, from the Construction
Account of the Construction Fund created by Section 3.0 1 of the Trust Indenture.
Copies of the statements of the respective Payees or other supporting
documentation are also attached hereto.
,
The obligations set forth in Exhibit A have been properly incurred, are proper
charges against the Construction Account, and have not been the basis of any
previous withdrawals from the Construction Account.
CITY OF CARMEL REDEVELOPMENT
AUTHORITY
City Engineer, City of Carmel, Indiana
STATE OF INDIANA
COUNTY OF HAMILTON
SS:
Before me, the undersigned, a Notary Public in and for said County and State, personally
appeared Kate Weese , City Engineer for the City of Carmel, Indiana, who having
been duly sworn upon her oath acknowledged the execution of the foregoing Affidavit for and on
behalf of said Authority.
Witness my hand and Notarial Seal this ~>~c~day of March, 2000
My Commission Expires:
L ,'~ a_ t_. m,.~<~ ~ , Notary Public
residing in IC~_j/~_~--~ County,
Indiana
EXHIBIT A
PAYMENT REQUISITION NO. 92
PAYEE
AMOUNT
DUE
CHARACTER OF EXPENDITURE
Trotter Construction Co.
5851 E. 34th Street
Indianapolis, IN 46218
$134,632.45
Construction costs in connection
with Pennsylvania St.
03~9~0
CONSTRUCTION PROJECT INVOICE
COMPANY NAME: Trotter Construction, Inc.
AND ADDRESS 5851 E 34~ Street
Indianapolis, IN 46218
TELEPHONE NO.: (317) 543-0053
FAX NO.: (317) 543-3115
PROJECT NAME: Pennsylvania Street Improvements
PROJECT NO.: 97-04
INVOICE NO.: 04
DATE: MARCH 1, 2000
Construction pay items as per Progress Pay Estimates No. 04 as shown on the
attached invoice for work completed between the dates of January 31, 2000 and
February 29, 2000.
TOTAL PAY THIS ESTIMATE:
MINUS 10% RETAINAGE:
TOTAL NOW DUE:
(-)
$149,591.61
$14,959.16
$134,632.45
Submitted by CrossRoad Engineers, PC
Pr0j~ct RepresentativeZsigned name
- -- 1 of 4
CITY OF CARMEL
PENNSYLVANIA STREET IMPROVEMENT PROJECT
PROJECT f~7-04
PROGRESS PAY ESTIMATE NO. 04
For work done during the period of: Jan. 31, 2000 through
Feb. 29, 2000
Item Description Quantity this Total Quantity Unit
No. Estimate to Date Price
1 CLEARING RIGHT OF WAY
2 CONCRETE CURB, REMOVE
3 CATCH BASIN, REMOVE
4 SURFACE MILLING. BITUMINOUS
5 PIPE, REMOVE
6 EXCAVATION, COMMON
7 BORROW
8 EXCAVATION, COMMON FOR DITCH GRADIN
9 TEMP. EROSION & SEDIMENT CONTROL, PEF
10 TEMP. EROSION & SEDIMENT CONTROL, CU
11 TEMP. EROSION & SEDIMENT CONTROL, DR~
12 TEMP. EROSION & SEDIMENT CONTROL, CU
13 B BORROW FOR STRUCTURE BACKFILL
14 COMPACTED AGG. FOR SHOULDER, O, SIZE
15 COMPACTED AGGREGATE FOR APPR., O, SI;
16 COMPACTED AGGREGATE FOR DRIVES, O, E
17 HMA BASE, 25.0 mm MAINELINE, D
18 HMA BASE, 25.0 mm MAINELINE, C
19 HMA BASE, 25.0 mm MAINELINE
20 HMA INTERMEDIATE, 19.0 mm MAINELINE
21 HMA SURFACE, 9.5 mm MV, MAINELINE
22 BITUMINOUS M~kTERIAL FOR TACT COAT
23 CURB RAMP, CONCRETE
24 SIDEWALK, CONCRETE
25 SIDEWALK, BITUMINOUS
26 CURB, CONCRETE
27 CURB AND GUTTER, COMBINED
28 CENTER CURB, CONCRETE, MODIFIED
29 BITUMINOUS MIXTURE FOR APPROACHES, L
30 GEOTEXTILES
31 RIPRAP, REVETMENT 18 IN.
32 MOBILIZATION & DEMOBILIZATION FOR SEE[
33 MULCHED SEEDING, R
34 SODDING
35 TREES, REPLANT
36 SANITARY SEWER SERVICE ADJUSTMENT
37 PIPE, RCP, 12 IN.
38 PIPE, RCP, 15 IN.
39 PIPE, RCP, 18 IN.
40 PIPE, RCP, 21 IN.
41 PIPE, RCP, 24 IN.
0.20 LS 0.70 LS $68,796.59
73.00 LFT 449.50 LFT $2.55
EA 1.00 EA $60.00
SY SY $6.65
LF 155.00 LF $11.60
24.88 CY 179.51 CY $8.60
CY CY $13.18
LS LS $16,126.96
5320.00 LF 5320.00 LF $1.70
1.00 EA 1.00 EA $66.00
EA EA $66.00
13.00 EA 13.00 EA $37.83
1231.55 CY 3518.94 CY $14.75
TN TN $20.53
TN TN $23.47
TN TN $32.31
TN TN $25.20
TN TN $31.52
TN TN $26.43
TN TN $29.13
TN TN $32.72
SY SY $0.14
SY SY $31.46
SY SY $24.22
TN TN $37.99
LF LF $10.68
LF LF $9.92
SY SY $73.76
TN TN $74.45
SY SY $3.96
TN TN $21.67
EA EA $660.00
SY SY $0.44
SY SY $2.59
EA EA $150.00
LF 76.00 LF $39.91
738.50 LF 1189.00 LF $24.43
195.50 LF 195.50 LF $25.64
7.50 LF 7.50 LF $28.11
14.5.00 LF 145.00 LF $38.04
700.50 LF 892.50 LF $45.08
Total Pay Total Pay
this Estimate to Date
$13,759.32 $48,157.61
$186.15 $1,146.23
$60.00
$1,798.00
$213.97 $1,543.79
$9,044.00 $9,044.00
$66.00 $66.00
$491.79 $491.79
$18,165.36 $51,904.37
$3,033.16
$18,041.56 $29,047.27
$5,012.62 $5,012.62
$210.83 $210.83
$5,515.80 $5,515.80
$31,578.54 $40,233.90
C:~an'net~ENNSYLV~PENNdoc~payestimate.wb3
2 of 4
CITY OF CARMEL
PENNSYLVANIA STREET IMPROVEMENT PROJECT
PROJECT ~t97-04
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
.71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
PROGRESS PAY ESTIMATE NO. 04
For work done during the period of: Jan. 31, 2000 through
Feb. 29, 2000
PIPE, RCP, 27 IN.
PIPE, RCP, 30 IN.
PIPE, RCP, 33 IN.
PIPE, RCP, 42 IN.
PIPE, RCP, 54 IN.
PIPE, GROUP K, 6 IN.
PIPE END SECTION, METAL, 12 IN.
PIPE END SECTION, METAL, 21 IN,
PIPE END SECTION, METAL, 33 IN.
PIPE END SECTION, METAL, 53 IN,
PIPE, PVC, 6 IN., SCHEDULE 40
PIPE END SECTION REINSTALL
AGGREGATE FOR UNDERDRAINS, 8
GEOTEXTILES FOR UNDERDRAIN
RING AND COVER, 4
INLET, E7
PIPE, PLUG EXISTING
PIPE HOLE IN EXISTING STRUCTURE, PLUG
CASTING, ADJUST TO GRADE
INLET, H5
MANHOLE, K5
SANITARY MANHOLE, C4
MANHOLE, L4
MANHOLE, L15
MANHOLE, J15
INLET, B15
INLET, C15
MANHOLE, J4
CONSTRUCTION DRUM, LEAVE IN PLACE
BARRICADE, IlIA
ROAD CLOSURE SIGN ASSEMBLY
DETOUR CLOSURE SIGN ASSEMBLY
CONSTRUCTION SIGN, A
SIGN, SHEET, ENCAPSULATED LENS WITH L
SIGN POST, A
LINE, THERMOPLASTIC, BROKEN WHITE, 4"
LINE, THERMOPLASTIC, SOLID WHITE, 4"
TRANSVERSE MARKINGS, THERMO. CROSS\
LINE, THERMOPLASTIC, BROKEN YELLOW, 4'
LINE, THERMOPLASTIC, SOLID YELLOW, 4"
TRANSVERSE MARKINGS, THERMO. STOP LI
PVMT. MESSAGE MRKNGS, THERMO., LANE
PVMT. MESSAGE MRKNGS, THERMO., WORE
SNOWPLOWABLE RAISED PAVEMENT MARK
LINE, THERMOPLASTIC, DOTTED, WHITE, 4",
4.00
4.00
10.00
5.00
LF 801.00 LF $53.14
LF 677.00 LF $54.02
LF 1114.00 LF $61.11
LF 28.00 LF $96.36
LF 34.50 LF $98.86
LF LF $3.28
EA EA $154.86
EA EA $236.42
EA EA $378.47
EA EA $1,744.02
LF LF $10.40
EA EA $75.61
CY CY $23.10
SY SY $1.10
EA EA $335.00
EA EA $793.88
EA EA $72.25
EA EA $145.52
EA EA $235.00
EA 1.00 EA $1,422.72
EA 1.00 EA $2,973.40
EA EA $1,986.52
EA 3.00 EA $5,264.01
EA EA $5,285.80
EA 18.00 EA $2,655.73
EA 15.00 EA $1,477.88
EA 7.00 EA $1,477.88
EA 2.00 EA $1,372.03
EA EA $65.75
EA EA $212.10
EA EA $477.23
EA EA $37.12
EA 4.00 EA $132.56
SFT SFT $24.85
LF LF $6.62
LF LF $0.26
LF LF $0.26
LF LF $1.41
LF LF $0.27
LF LF $0.25
LF LF $2.85
EA EA $60.62
EA EA $87.57
EA EA $28.72
LF LF $0.62
$212.56
$42,565.14
$36,571.54
$68,076.54
$2,698.08
$3,410.67
$1,422.72
$2,973.40
$15,792.03
$10,622.92 $47,803.14
$14,778.80 $22,168.20
$7,389.40 $10,345.16
$2,744.06
$530.24
C:~carmel~PENNSYLV~PENNdoc~aYestimate-wb3
3 of 4
CITY OF CARMEL
PENNSYLVANIA STREET IMPROVEMENT PROJECT
PROJECT #97-04
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
PROGRESS PAY ESTIMATE NO. 04
For work done during the period of: Jan. 31, 2000 through
FIELD OFFICE, 550 SQ FT. 1.00 MOS 2.75 MOS
MAINTAINING TRAFFIC 0.10 LS 0.30 LS
CONSTRUCTION ENGINEERING 0.10 LS 0.30 LS
MOBILIZATION &DEMOBILIZATION LS 0.50 LS
MATERIAL TESTING LS LS
TRAFFIC SIGNAL, 12" RYG EA EA
TRAFFIC SIGNAL, 12" RY GA EA EA
TRAFFIC SIGNAL, 12" RYG, YA, GA EA EA
PEDESTRIAN SIGNAL, INTERNATIONAL, 12" EA EA
PEDESTRIAN PUSHBUTTON &SIGN EA EA
HANDHOLE EA EA
CONDUIT, 2" LF LF
TRAFFIC SIGNAL POLE, 40' SIG, ARM, 15' VID EA EA
TRAFFIC SIGNAL POLE, 45' SIG, ARM, 15' VID EA EA
TRAFFIC SIGNAL POLE, 75' SIG, ARM, 25' VIDI EA EA
TRF. SIG. POLE FOUNDATION INCLUDING RE CY CY
POWER CABLE, 2CI8GA LF LF
POWER CABLE, 3C/14GA LF LF
POWER CABLE, 5C/14GA LF LF
POWER CABLE, 7C/14GA LF LF
POWER CABLE, 11C/14GA LF LF
VIDEO CAMERA CABLE, CX LF LF
8 PHASE CONTROLLER W/P CABINET &FOUl EA EA
VIDEO DETECTION SYSTEM, COMPLETE EA EA
ELECTRIC SERVICE EA EA
REMOVAL OF fRAFFIC SIGNAL EQUIPMENT LS LS
PIPE CATCH BASIN, 12" (UNDISTRIBUTED) EA EA
PIPE, PVC, SCHEDULE 40, 8" (UNDISTRIBUTE LF LF
IN LET, C5 EA EA
$410.00
$30,795.00
$108,125.00
$85,650.00
$27,270.00
$444.70
$452.84
$708.12
$459.35
$166.02
$858.00
$16.82
$5,884.82
$6,886.21
$13,073.25
$407.36
$2.66
$1.92
$2.97
$2.94
$3.32
$2.96
$13,676.65
$33,259.20
$531.25
$2,181.94
$425.00
$11.55
$1,550.00
Feb. 29, 2000
$410.00 $1,127.50
$3,079.50 $9,238.50
$10,812.50 $32,437.50
$42,825.00
C:~armel~PENNSYLV~ENNdoc~oayestimate-wb3
4 of 4
CITY OF CARMEL
PENNSYLVANIA STREET IMPROVEMENT PROJECT
PROJECT ~t97-04
PROGRESS PAY ESTIMATE NO. 04
For work done during the period of: Jan. 31, 2000 through
TOTALS AND PAY ESTIMATE CALCULATIONS
Feb. 29, 2000
TOTAL PAY THIS ESTIMATE
$149,591.61
TOTAL PAY TO DATE
DEDUCT 10% RETAINAGE
DEDUCT PREVIOUS NET PAY ESTIMATES
NET PAY ESTIMATE NO. 04
$539,994.77
$53,999.48
$351,362.85
$134,632.45
CrossRoad Engineers, PC
Inspecting Firm
Contractor
Dat
C:~arme!~PENNSYLV~,PENNdoc~eYestima~-wb3