HomeMy WebLinkAboutCC-03-06-00-01 Hazel Dell PaymtResolution No. CC-03-06-00-01
A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL,
INDIANA APPROVING PAYMENT OF CONSTRUCTION COSTS FOR HAZEL
DELL BOND PROJECT
WHEREAS, pursuant to Article III, Section 3.01 (b) of the Trust Indenture by and
among the City of Carmel Redevelopment Authority and Fifth Third Bank of Central
Indiana, dated as of August 1, 1997, approval by the Common Council is required prior
to payments from the Construction Fund therein described upon presentation of
architect' s or engineer' s certificates of work completed and materials furnished;
WHEREAS, American Consulting Engineers, Inc., has presented such certificates
regarding the Construction Project Invoices attached hereto as Exhibit A.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Carmel, Indiana, that the Construction Project Invoices attached hereto as Exhibit A are
hereby approved for payment from the Construction Fund described in the above-
referenced Trust Indenture.
PASSED by the Common Council of the City of Carmel, Indiana this
of P{ct_F C)~ ,2000, by a vote of ,~ ayes and C) nays.
,,0 day
~.t~..g Officer in
Kevin Kirby
Ronald E. Carter Wayne Vfilson
ATTEST:
Presented by me to the Mayor ot the City ot Carmel, Indiana the ~ day of
~ ~r~'[~ ,2000.
,2000.
ATTEST:
Diana Lv~or~'raY,~~-Treasurer
EXHIBIT A
PAYMENT REQUISITION NO. 90
PAYEE
AMOUNT
DUE
CHARACTER OF EXPENDITURE
Milestone Contractors
P.O. Box 66008
5950 S. Belmont Ave.
Indianapolis, IN 46266-6008
$554,949.18
Construction costs in connection
with Hazel Dell Parkway.
02~8~0
Page 1 of 2
CON$TRUCTION PROJECT INVOICE
Date: 2/7/00
Name of Company: IvHlestone Contractors, LP
.~Jddress & Zip:
Milestone Contractors, LP
P.O. Box 66008
5950 S. Belmont Ave.
Indianapolis, IN 46266-6008
Telephone'No: (317)-788-1040
Project Nmne: Hazel Dell Pm'kw~-
Invoice No.: 038
Construction pay items as per PROGRESS ~ #038 as shown on the attached invoice dated
2R/00.
Submitted by American Consulting Engineers, Inc.
Rcsid~ Project R~rcsemafivc
Print Name
Page 2 of 2
Date: 2/7/00
Project Name.' HAZEL DELL PARKWAY
Project No..' 97-02
Invoice No.: 038
Period.' PARTIAL RETAINAGE RELEASE
Construction on the Hazel Dell Parkway construction project has been substantially completed
and Milestone has requested a reduction of retainage. The retainage has been reduced to 1% of
the total construction cost shown on Change Order #20 ($13,907,732.08).
Total Retainage withheld to date ...................................... $ 694,026.50
Retainage withheld 1% of the total contract cost ** ....................... - 139,077.32
Total amount of release of Retainage ................................... $ 554,949.18
DATE
PROJECT REPRESENTATIVE
DATE
DATE
* * See attached Memo dated 2/8/00 for remaining items.
AMERICAN CONSULTING, INC.
Architects
Consultants
Engineers
4165 Millersville Road, Indianapolis, IN 46205
(317) 547-5580 FAX: (317) 543-0270
info@amercons.com
MEMORANDUM
DATE:
TO:
FROM:
RE:
CC:
February 10, 2000
Milestone Contractors, LP
Dan Greskamp
Hazel Dell Parkway- Remaining Items For Final Payment (1%)
A small area in the pavement has developed a rut approximately %" deep at Sta.
45+00 Rt. Milestone was tolded to look at the rut and make the necessary repairs.
ACE noticed that a surface patch had been placed in the rut on top of the existing
surface. The same procedure is to be used to repair the rut that was used to repair
pavement sections patched at other locations on the job site. The rutted area is to be
milled to prevent the patch material from raveling. Cracking has developed in the
pavement from approximate STA. 43+00 to Sta. 45+00 Rt. And will have to be
repaired.
While verifying pipe quantities, I noticed some pipes were not finished on the inside of
the manholes. Out of 19 manholes spot checked, 12 manholes had pipes that were not
finished. Some manholes had pipes entering the structure where one pipe was finished
and another pipe was not finished. All pipes are to be finished on the inside of all
manholes. Manhole Structures #201 and #202 do not have steps that are accessible
from the top of the manhole. New steps will have to be drilled and grouted in place to
provide access to the bottom of manholes where this condition exists.
Jim Neal of the Hamilton County Highway Department requested an inlet be placed at
Sta.45+75 Lt. (Str.~f~,57). This was done to reduce the sharp slope around the inlet and
make the slope 3:1 as shown on the plans. The slope was checked with a 4' level from
the bike path to the top of casting and the top of the inlet still needs to be raised to meet
the 3:1 slope requirement. Milestone has stated that they have checked the slope at
the inlet and they feel it meets Hamilton County's requirements. Jim Neal was
contacted by ACE and asked to check the inlet to see if it met his requirements. Jim
stated he would inspect the inlet as soon as possible.
1 c:\97525\hdp.doc
ACE has to verity if rebar was placed to locate the 6" irrigation sleeves along the
roadway and under the driveways as shown on the plans.
Milestone is to connect underdrains to the drainage structures being set on the 146th
Street project east and adjacent to the Hazel Dell Parkway project.
2 c:\97525\hdp.doc
FF~I 08 ' Fr..:lF, d 3.4:
Milestone
February 07, 2000
American Consulting Engineers, Inc.
4165 Millersville Road
Indianapolis, IN. 46205-2998
Attention: Dan Greskamp
Re: Reduction of retainage on Contract 97525
Road construction, Hazel Dell parkway for City of Carmel
Dear Mr- Greskamp,
Please accept this letter as our written request to reduce'our
retainage withheld on the above mentioned contract.
In consideration of the fact that this contract is complete
except for minor quantity'adjustments and minor punch list items
to be performed in the near future as weather permits, we wish to
have all but 1% of the total contract released as soon as the
next blank estimate and due process will allow.
we appreciate your assistance in this matter.
Sincerely,
Larry Conway,
Contracts Administrator
Equal Ol~portunity Employer ·
Milestone CoMetom, LP.
RO. Box 421459 maianapolis. IN 46242-1459 (317) 788-6885 ~x (317) 788-1098
· :~ TOTAL P~GE.03.