HomeMy WebLinkAboutCC-02-07-00-04 Hazel Dell PaymtResolution No. CC-02-07-00-04
A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL,
INDIANA APPROVING PAYMENT OF CONSTRUCTION COSTS FOR HAZEL
DELL BOND PROJECT
WHEREAS, pursuant to Article III, Section 3.01 (b) of the Trust Indenture by and
among the City of Carreel Redevelopment Authority and Fieth Third Bank of Central
Indiana, dated as of August 1, 1997, approval by the Common Council is required prior
to payments from the Construction Fund therein described upon presentation of
architect' s or engineer' s certificates of work completed and materials furnished;
WHEREAS, American Consulting Engineers, Inc., has presented such certificates
regarding the Construction Project Invoices attached hereto as Exhibit A.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Carreel, Indiana, that the Construction Project Invoices attached hereto as Exhibit A are
hereby approved for payment from the Construction Fund described in the above-
referenced Trust Indenture.
PASSED by the Common Council of the City of Carmel, Indiana this r7 day
of ~"~ brJo, c,~ ,2000, by a vote of (. ayes and C) nays.
CITY OF C~L, ~I~A
cer ' ~"' er, Presi
· Ro N.L. Rundie
her B~lly L. ~nlkcr
ATTEST:
Diana L. , Clerk-Tre surer
P se ted by me to the ity of Carmel, Indiana the ~ day of
~"~-~('~./' 2000
%inard, Mayor
ATTEST:
Diana L. Cordrayl IAMC;'
EXHIBIT A
PAYMENT REQUISITION NO. 87
PAYEE
AMOUNT
DUE
CHARACTER OF EXPENDITURE
1. Trotter Construction, Inc.
5851 E. 34th Street
Indianapolis, IN 46218
$117,369.97
Construction Services rendered in
connection with Pennsylvania St.
02/01/00
CONSTRUCTION PROJECT INVOICE
DATE: JANUARY 28, 2000
COMPANY NAME: Trotter Construction, Inc.
AND ADDRESS 5851 E 34th Street
Indianapolis, IN 46218
TELEPHONE NO.: (317) 543-0053
FAX NO.: (317) 543-3115
PROJECT NAME: Pennsylvania Street Improvements
PROJECT NO.: 97-04
INVOICE NO.: 03
Construction pay items as per Progress Pay Estimates No. 03 as shown on the
attached invoice for work completed between the dates of January 13, 2000 and
January 30, 2000.
TOTAL PAY THIS ESTIMATE:
MINUS 10% RETAINAGE:
TOTAL NOW DUE:
(-)
$130,411.08
$13,041.11
$117,369.97
Submitted by CrossRoad Engineers, PC
Project Representat~
name
{/~
Date
Project Representativ. e - pnnted name
-- - 1 of 4
CITY OF CARMEL
PENNSYLVANIA STREET IMPROVEMENT PROJECT
PROJECT ~W37-04
PROGRESS PAY ESTIMATE NO. 03
For work done during the period of: JAN. 13, 2000 through
Item Description
No.
1 CLEARING RIGHT OF WAY
2 CONCRETE CURB, REMOVE
3 CATCH BASIN, REMOVE
4 SURFACE MILLING. BITUMINOUS
5 PIPE, REMOVE
6 EXCAVATION, COMMON
7 BORROW
8 EXCAVATION, COMMON FOR DITCH GRADIN
9 TEMP. EROSION & SEDIMENT CONTROL, PEF
10 TEMP. EROSION & SEDIMENT CONTROL, CU
11 TEMP. EROSION & SEDIMENT CONTROL,
12 TEMP. EROSION & SEDIMENT CONTROL, CU
13 B BORROW FOR STRUCTURE BACKFILL
14 COMPACTED AGG. FOR SHOULDER, O, SIZE
15 COMPACTED AGGREGATE FOR APPR., O, Si;
16 COMPACTED AGGREGATE FOR DRIVES, O,
17 HMA BASE, 25.0 mm MAINELINE, D
18 HMA BASE, 25.0 mm MAINELINE, C
19 HMA BASE, 25.0 mm MAINELINE
20 HMA INTERMEDIATE, 19.0 mm MAINELINE
21 HMA SURFACE, 9.5 mm MV, MAINELINE
22 BITUMINOUS MATERIAL FOR TACT COAT
23 CURB RAMP, CONCRETE
24 SIDEWALK, CONCRETE
25 SIDEWALK, BITUMINOUS
26 CURB, CONCRETE
27 CURB AND GUTTER, COMBINED
28 CENTER CURB, CONCRETE, MODIFIED
29 BITUMINOUS MIXTURE FOR APPROACHES, L
30 GEOTEXTILES
31 RIPRAP, REVETMENT 18 IN.
32 MOBILIZATION & DEMOBILIZATION FOR SEE[
33 MULCHED SEEDING, R
34 SODDING
35 TREES, REPLANT
36 SANITARY SEWER SERVICE ADJUSTMENT
37 PIPE, RCP, 12 IN.
38 PIPE, RCP, 15 IN.
39 PIPE, RCP, 18 IN.
40 PIPE, RCP, 21 IN.
41 PIPE, RCP, 24 IN.
::Quantity this
Estimate
0.20 LS
LFT
EA
SY
LF
CY
CY
LS
LF
EA
EA
EA
1144.67 CY
TN
TN
TN
TN
TN
TN
TN
TN
SY
SY
SY
TN
LF
LF
SY
TN
SY
TN
SY
SY
LF
64.00 LF
LF
LF
LF
LF
: Total Quantity' :~ Unit
'to Date Price
0.50 LS $68,796.59
376.50 LFT $2.55
1.00 EA $60.00
SY $6.65
155.00 LF $11.60
154.63 CY $8.60
CY $13.18
LS $16,126.96
LF $t .70
EA $66.00
EA $66.00
EA $37.83
2287.39 CY $14.75
TN $20.53
TN $23.47
TN $32.31
TN $25.20
TN $31.52
TN $26.43
TN $29.13
TN $32.72
SY $0.14
SY $31.46
SY $24.22
TN $37.99
LF $10.68
LF $9.92
SY $73.76
TN $74.45
SY $3.96
TN $21.67
EA $660.00
SY $0.44
SY $2.59
EA $150.00
76.00 LF $39.91
450.50 LF $24.43
LF $25.64
LF $28.11
LF $38.04
192.00 LF $45.08
JAN. 30, 2000
Total Pay.
th is Estimate
$13,759.32
Total Pay.
to Date
$34,398.30
$960.08
$60.00
$1,798.00
$1,329.82
$16,883.88 $33,739.00
$3,033.16
$1,563.52 $11,005.72
$8,655.36
C:~carmer~PENNSYLV~PENNdoc~oayestimate.wb3
- -- 2 of 4
CITY OF CARMEL
PENNSYLVANIA STREET IMPROVEMENT PROJECT
PROJECT ~97-04
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
' 62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
PROGRESS PAY ESTIMATE NO. 03
For work done during the period of: JAN. 13, 2000 through
JAN. 30, 2000
PIPE, RCP, 27 IN.
PIPE, RCP, 30 IN.
PIPE, RCP, 33 IN.
PIPE, RCP, 42 IN.
PIPE, RCP, 54 IN.
PIPE, GROUP K, 6 IN.
PIPE END SECTION, METAL, 12 IN.
PIPE END SECTION, METAL, 21 IN.
PIPE END SECTION, METAL, 33 IN.
PIPE END SECTION, METAL, 53 IN.
PIPE, PVC, 6 IN., SCHEDULE 40
PIPE END SECTION REINSTALL
AGGREGATE FOR UNDERDRAINS, 8
GEOTEXTILES FOR UNDERDRAIN
RING AND COVER, 4
INLET, E7
PIPE, PLUG EXISTING
PIPE HOLE IN EXISTING STRUCTURE, PLUG
CASTING, ADJUST TO GRADE
INLET, H5
MANHOLE, K5
SANITARY MANHOLE, C4
MANHOLE, L4
MANHOLE, L15
MANHOLE, J15
INLET, B15
INLET, C15
MANHOLE, J4
CONSTRUCTION DRUM, LEAVE IN PLACE
BARRICADE, IlIA
ROAD CLOSURE SIGN ASSEMBLY
DETOUR CLOSURE SIGN ASSEMBLY
CONSTRUCTION SIGN, A
SIGN, SHEET, ENCAPSULATED LENS WITH L
SIGN POST, A
LINE, THERMOPLASTIC, BROKEN WHITE, 4"
LINE, THERMOPLASTIC, SOLID WHITE, 4"
TRANSVERSE MARKINGS, THERMO. CROSS~
LINE, THERMOPLASTIC, BROKEN YELLOW, 4'
LINE, THERMOPLASTIC, SOLID YELLOW, 4"
TRANSVERSE MARKINGS, THERMO. STOP LI
PVMT. MESSAGE MRKNGS, THERMO., LANE
PVMT. MESSAGE MRKNGS, THERMO., WORE
SNOWPLOWABLE RAISED PAVEMENT MARK
LINE, THERMOPLASTIC, DOTTED, WHITE, 4",
797.00
532.00
7.00
1.00
LF 797.00 LF $53.14
LF 677.00 LF $54.02
LF 1114.00 LF $61.11
LF 28.00 LF $96.36
LF 34.50 LF $98.86
LF LF $3.28
EA EA $154.86
EA EA $236.42
EA EA $378.47
EA EA $1,744.02
LF LF $10.40
EA EA $75.61
CY CY $23.10
SY SY $1.10
EA EA $335.00
EA EA $793.88
EA EA $72.25
EA EA $145.52
EA EA $235.00
EA 1.00 EA $1,422.72
EA 1.00 EA $2,973.40
EA EA $1,986.52
EA 3.00 EA $5,264.01
EA EA $5,285.80
EA 14.00 EA $2,655.73
EA 5.00 EA $1,477.88
EA 2.00 EA $1,477.88
EA 2.00 EA $1,372.03
EA EA $65.75
EA EA $212.10
EA EA $477.23
EA EA $37.12
EA 4.00 EA $132.56
SFT SFT $24.85
LF LF $6.62
LF LF $0.26
LF LF $0.26
LF LF $1.41
LF LF $0.27
LF LF $0.25
LF LF $2.85
EA EA $60.62
EA EA $87.57
EA EA $28.72
LF LF $0.62
$42,352.58
$28,738.64
$42,352.58
$36,571.54
$68,076.54
$2,698.08
$3,410.67
$1,422.72
$2,973.4O
$15,792.03
$18,590.11 $37,180.22
$7,389.40
$2,955.76
$1,372.03 $2,744.06
$530.24
C:%carmer~PENNSYLV%PENNdoc~oayestjmate.wb3
3 of 4
CITY OF CARMEL
PENNSYLVANIA STREET IMPROVEMENT PROJECT
PROJECT ~t97-04
PROGRESS PAY ESTIMATE NO. 03
For work done during the period of: JAN. 13, 2000 through
87 FIELD OFFICE, 550 SQFT. 0.50 MOS 1.75 MOS
88 MAINTAINING TRAFFIC 0.05 LS 0.20 LS
89 CONSTRUCTION ENGINEERING 0.05 LS 0.20 LS
90 MOBILIZATION &DEMOBILIZATION LS 0.50 LS
91 MATERIAL TESTING LS LS
92 TRAFFIC SIGNAL, 12" RYG EA EA
93 TRAFFIC SIGNAL, 12" RY GA EA EA
94 TRAFFIC SIGNAL, 12" RYG, YA, GA EA EA
95 PEDESTRIAN SIGNAL, INTERNATIONAL, 12" EA EA
96 PEDESTRIAN PUSHBUTTON & SIGN EA EA
97 HANDHOLE EA EA
98 CONDUIT, 2" LF LF
99 TRAFFIC SIGNAL POLE, 40' SIC. ARM, 15' VIDI EA EA
100 TRAFFIC SIGNAL POLE, 45' SIC. ARM, 15' VID EA EA
101 TRAFFIC SIGNAL POLE, 75' SIC. ARM, 25' VIDI EA EA
102 TRF. SIC. POLE FOUNDATION INCLUDING RE CY CY
103 POWER CABLE, 2C/8GA LF LF
104 POWER CABLE, 3C/14GA LF LF
105 POWER CABLE, 5C/14GA LF LF
106 POWER CABLE, 7C/14GA LF LF
107 POWER CABLE, 11C/14GA LF LF
108 VIDEO CAMERA CABLE, CX LF LF
109 8 PHASE CONTROLLER W/P CABINET &FOUl EA EA
110 VIDEO DETECTION SYSTEM, COMPLETE EA EA
111 ELECTRIC SERVICE EA EA
112 REMOVAL OF TRAFFIC SIGNAL EQUIPMENT LS LS
113 PIPE CATCH BASIN, 12" (UNDISTRIBUTED) EA EA
114 PIPE, PVC, SCHEDULE 40, 8" (UNDISTRIBUTE LF LF
115 INLET, C5 EA EA
$410.00
$30,795.00
$108, 125.00
$85,650.00
$27,270.00
$444.70
$452.84
$708.12
$459.35
$166.02
$858.00
$16.82
$5,884.82
$6,886.21
$13,073.25
$407.36
$2.66
$1.92
$2.97
$2.94
$3.32
$2.96
$13,676.65
$33,259.20
$531.25
$2,181.94
$425.00
$11.55
$1,550.00
JAN. 30, 2000
$205.00 $717.50
$1,539.75 $6,159.00
$5,406.25 $21,625.00
$42,825.00
C:~armel~PENNSYLV~PENNdoc~oayes~mate.wb3
' - -- 4 of 4
CITY OF CARMEL
PENNSYLVANIA STREET IMPROVEMENT PROJECT
PROJECT a~e97-04
PROGRESS PAY ESTIMATE NO. 03
For work done during the period of: JAN. 13, 2000 through JAN. 30, 2000
TOTALS AND PAY ESTIMATE: CALCULATIONS~~: ~: "
TOTAL PAY THIS ESTIMATE
$130,411.08
TOTAL PAY TO DATE
$390,403.17
DEDUCT 10% RETAINAGE
$39,040.32
DEDUCT PREVIOUS NET PAY ESTIMATES
NET PAY ESTIMATE NO. 03
$233,992.88
$117,369.97