Loading...
HomeMy WebLinkAboutCC-01-03-00-01 Hazel Dell PaymtResolution No. CC-01-03-00-01 A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL, INDIANA APPROVING PAYMENT OF CONSTRUCTION C~Sfy~F~R HAZEL DELL t~ARKWAY ['}C~t'}d D WHEREAS, pursuant to Article III, Section 3.01 (b) of the Trust Indenture by and among the City of Carmel Redevelopment Authority and FitCh Third Bank of Central Indiana, dated as of August 1, 1997, approval by the Common Council is required prior to payments from the Construction Fund therein described upon presentation of architect' s or engineer' s certificates of work completed and materials furnished; WHEREAS, American Consulting Engineers, Inc., has presented such certificates regarding the Construction Project Invoices attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Carmel, Indiana, that the Construction Project Invoices attached hereto as Exhibit A are hereby approved for payment from the Construction Fund described in the above- referenced Trust Indenture. Robert Battreall PASSED by the Common Council of the City of Carmel, Indiana this ~ day of-_~a,~,~c-, -c ~ ,2000, by a vote of '~ ayes and (') nays. er' {'residentt / N.L. Rundie onald E. Carter ATTF/ST: Diana L. Cordray, IAMC, ClOt-Treasurer Presented by me to the Mayor of the City of Carmel, Indiana the 3 day of --~ o,,c,, ~ ~ ~ ~ ,2000. · . , , lro ~ ~ t ~,c~ ,2000. fa~'nard, Mayor ATTEST: Diana L. Cordray, ,I~asurer \fl EXHIBIT A PAYMENT REQUISITION NO. 8 1 PAYEE AMOUNT DUE CHARACTER OF EXPENDITURE 1. Trotter Construction Co. 5851 E. 34m Street Indianapolis, IN 46218 $133,908.74 Construction costs rendered in connection with Pennsylvania St. 12/20/99 CONSTRUCTION PROJECT INVOICE DATE: December 17, 1999 COMPANY NAME: Trotter Construction, Inc. AND ADDRESS 5851 E. 34"' Street Indianapolis, IN 46218 TELEPHONE NO.: (317,! 543-0053 FAX NO.: (317) 543-3115 PROJECT NAME: Pennsylvania Street Improvements PROJECT NO.: 97-04 INVOICE NO.: 01 Construction pay items as per Progress Pay Estimates No, 01 as shown on the attached invoice for work completed between the dates of November 1, 1999 and December 17, 1999. TOTAL PAY THIS ESTIMATE: MINUS 10% RETAINAGE: TOTAL NOW DUE: (-) $148,787.49 $14,878.75 $133,908.74 Submitted by CrossRoad Engineers, PC Project Represent~gned name Date Project Representative - printed name CITY OF CARMEL 1 of 4 PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT #97-04 PROGRESS PAY ESTIMATE NO. 01 For work done during the period of: through Item Description Quantity this Total Quantity No, · Estimate : : to Date 1 CLEARING RIGHT OF WAY 0.10 LS 0.10 2 CONCRETE CURB, REMOVE 3182~0 LFT 318,00 3 CATCH BASIN, REMOVE EA 4 SURFACE MILLING. BITUMINOUS SY 5 PIPE, REMOVE 77.00 LF 77.00 6 EXCAVATION, COMMON 142.96 CY 142.96 7 BORROW CY 8 EXCAVATION, COMMON FOR DITCH GRADING LS 9 TEMP. EROSION &SEDIMENT CONTROL, PERIMETER LF 10 TEMP. EROSION &SEDIMENT CONTROL, CULVERT PR EA 11 TEMP. EROSION &SEDIMENT CONTROL, DROP INLET EA 12 FEMP. EROSION &SEDIMENT CONTROL, CURB INLET EA 13 B BORROW FOR STRUCTURE BACKFI LL 635.13 CY 635.13 14 COMPACTED AGG. FOR SHOULDER, O, SIZE No. 53 TN 15 COMPACTED AGGREGATE FOR APPR., O, SIZE No, 5 TN 16 COMPACTED AGGREGATE FOR DRIVES, O, SIZE No. 53 TN 17 HMA BASE, 25.0 mm MAINELINE, D TN 18 HMA BASE, 25.0 mm MAINELINE, C TN 19 HMA BASE, 25.0 mm MAINELINE TN 20 HMA INTERMEDIATE, 19.0 mm MAINELINE TN 21 HMA SURFACE, 9.5 mm MV, MAINELINE TN 22 BITUMINOUS MATERIAL FOR TACT COAT SY 23 CURB RAMP, CONCRETE SY 24 SIDEWALK, CONCRETE SY 25 SIDEWALK, BITUMINOUS TN 26 CURB, CONCRETE LF 27 CURB AND GU'FI'ER, COMBINED LF 28 CENTER CURB, CONCRETE, MODIFIED SY 29 BITUMINOUS MIXTURE FOR APPROACHES, LV TN 30 GEOTEXTILES SY 31 RIPRAP, REVETMENT 18 IN. TN 32 MOBILIZATION &DEMOBILIZATION FOR SEEDING EA 33 MULCHED SEEDING, R SY 34 SODDING SY 35 TREES, REPLANT EA 36 SANITARY SEWER SERVICE ADJUSTMENT LF 37 PIPE, RCP, 12 IN. LF 15 IN. LF 18 IN. LF 21 IN. LF 24 IN. 192.00 LF 192.00 27 IN. LF 30 IN. LF 33 IN. 667.00 LF 667.00 38 PIPE, RCP, 39 PIPE, RCP, 40 PIPE, RCP, 41 PIPE, RCP, 42 PIPE, RCP, 43 PIPE, RCP, 44 PIPE, RCP, Unit · Price LS $68,796.59 LFT $2.55 EA $60.00 SY $6.65 LF $11.60 CY $8.60 CY $13.18 LS $16, 126.96 LF $1.70 EA $66.00 EA $66.00 EA $37.83 CY $14.75 TN $20.53 TN $23.47 TN $32.31 TN $25.20 TN $31.52 TN $26.43 TN $29.13 TN $32.72 SY $C. 14 SY $31.46 SY $24.22 TN $37.99 LF $10.68 LF $9,92 SY $73.76 TN $74.45 SY $3.96 TN $21.67 EA $660.00 SY $0.44 SY $2.59 EA $150.00 LF $39.91 LF $24.43 LF $25.64 LF $28.11 LF $38.04 LF $45.08 LF $53.14 LF $64,02 LF Total Pay Total Pay this Estimata: to Date ; $6,879.66 $6,879.66 $810.90 $810.90 $893.20 $893.20 $1,229.46 $1,229.46 $9,368.17 $9,368.17 $8,655.36 $8,655.36 $61.11 $40,760.37 $40,760.37 \\Hub2\cre\PROJECTS\CARMEL\PennSt\PaYestimate-wb3 CITY OF CARMEL 2 of 4 PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT f/97-04 PROGRESS PAY ESTIMATE NO. 01 For work done during the period of: through 45 PIPE, RCP, 42 IN. 46 PIPE, RCP, 54 IN. 47 PIPE, GROUP K, 6 IN. 48 PIPE END SECTION, METAL, 12 IN. 49 PIPE END SECTION, METAL, 21 IN. 50 PIPE END SECTION, METAL, 33 IN. 51 PIPE END SECTION, METAL, 53 IN. 52 PIPE, PVC, 6 IN., SCHEDULE 40 53 PIPE END SECTION REINSTALL 54 AGGREGATE FOR UNDERDRAINS, 8 55 GEOTEXTILES FOR UNDERDRAIN 56 RING AND COVER, 4 57 INLET, E7 58 PIPE, PLUG EXISTING 59 PIPE HOLE IN EXISTING STRUCTURE, PLUG 60 CASTING, ADJUST TO GRADE 61 INLET, H5 52 MANHOLE, K5 63 SANITARY MANHOLE, C4 64 MANHOLE, L4 65 MANHOLE, L15 66 MANHOLE, J15 67 INLET, B15 68 INLET, C15 69 MANHOLE, J4 70 CONSTRUCTION DRUM, LEAVE IN PLACE 71 BARRICADE, IlIA - 72 ROAD CLOSURE SIGN ASSEMBLY 73 DETOUR CLOSURE SIGN 'ASSEMBLY 74 CONSTRUCTION SIGN, A 75 SIGN, SHEET, ENCAPSULATED LENS WITH LEGEND 76 SIGN POST, A 77 LINE, THERMOPLASTIC, BROKEN WHITE, 4" 78 LINE, THERMOPLASTIC, SOLID WHITE, 4" 79 TRANSVERSE MARKINGS, THERMO. CROSSWALK LINE 80 LINE, THERMOPLASTIC, BROKEN YELLOW, 4" 81 LINE, THERMOPLASTIC, SOLID YELLOW, 4" 82 TRANSVERSE MARKINGS, THERMO. STOP LINE 24" 83 PVMT. MESSAGE MRKNGS, THERMO., LANE INDICATIO 84 PVMT. MESSAGE MRKNGS, THERMO., WORD (ONLY) 85 SNOWPLOWABLE RAISED PAVEMENT MARKER 86 LINE, THERMOPLASTIC, DOTrED, WHITE, 4", 2 FT. LINE 87 FIELD OFFICE, 550 SQ FT. 88 MAINTAINING TRAFFIC 89 CONSTRUCTION ENGINEERING 90 MOBILIZATION & DEMOBILIZATION 91 MATERIAL TESTING 92 TRAFFIC SIGNAL, 12" RYG LF LF LF LF LF LF EA EA EA EA EA EA EA EA LF LF EA EA CY CY SY SY EA EA EA EA EA EA EA EA EA EA 1.00 EA 1.00 EA 2.00 EA 2.00 EA 3.00 EA 3.00 EA 1.00 EA 1.00 EA 4.00 EA 4.00 EA SFT SFT LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF 0.25 MOS 0.25 MOS 0.10 LS 0.10 LS 0.10 LS 0.10 LS 0.50 LS 0.50 LS LS LS $96.36 $98,86 $3.28 $154.86 $236.42 $378.47 $1,744.02 $10.40 $75.61 $23.10 $1.10 $335.00 $793.88 $72.25 $145.52 $235.00 $1,422.72 $2,973.40 $1,986.52 $5,264.01 $5,285.80 $2,655.73 $1,477.88 $1,477.88 $1,372.03 $65.75 $212.10 $477.23 $37.12 $132.56 $24.85 $6.62 $0.26 $0.26 $1.41 $0.27 $0.25 $2.85 $60.62 $87.57 $28.72 $0.62 $410.00 $30,795.00 $108, 125.00 $85,650.00 $27,270.00 $444.70 $2,973.4O $2,973.40 $10,528.02 $10,528.02 $7,967.19 $7,967.19 $1,372.O3 $1,372.03 $530.24 $530.24 $102.50 $102.50 $3,079.50 $3,079.50 $10,812.50 $10,812.50 $42,825.00 $42,825.00 \\Hub2\cre\PROJECTS\CARMEL\PennSt~PaYestimate.wb3 CITY OF CARMEL 3of4 PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT #97-04 PROGRESS PAY ESTIMATE NO. 01 For work done during the period of: 93 TRAFFIC SIGNAL, 12" RY GA 94 TRAFFIC SIGNAL, 12" RYG, YA, GA 95 PEDESTRIAN SIGNAL, INTERNATIONAL, 12" 96 PEDESTRIAN PUSHBUTTON & SIGN 97 HANDHOLE 98 Cr~NDUIT, 2" 99 TRAFFIC SIGNAL POLE, 40' SIG. ARM, 15' VIDEO ARM 100 TRAFFIC SIGNAL POLE, 45' SIG. ARM, 15' VIDEO ARM 101 TRAFFIC SIGNAL POLE, 75' SIG. ARM, 25' VIDEO ARM 102 TRF. SIG. POLE FOUNDATION INCLUDING REINF. STEE 103 POWER CABLE, 2C/8GA 104 POWER CABLE, 3C/14GA 105 POWER CABLE, 5C/14GA 106 POWER CABLE, 7C/14GA 107 POWER CABLE, 11 C/14GA 108 VIDEO CAMERA CABLE, CX 109 8 PHASE CONTROLLER W/P CABINET & FOUNDATION 110 VIDEO DETECTION SYSTEM, COMPLETE 111 ELECTRIC SERVICE 112 REMOVAL OF TRAFFIC SIGNAL EQUIPMENT 113 PIPE CATCH BASIN, 12" (UNDISTRIBUTED) 114 PIPE, PVC, SCHEDULE 40, 8" (UNDISTRIBUTED) 115 INLET, C5 EA EA EA EA EA EA EA EA EA EA LF LF EA EA EA EA EA EA CY CY LF LF LF LF LF LF LF LF LF LF LF LF LS LS LF LF through $452.84 $708.12 $459.35 $166.02 $858.00 $16.82 $5,884.82 $6,886.21 $13,073.25 $407.36 $2.66 $1.92 $2.97 $2.94 $3.32 $2.96 $13,676.65 $33,259.20 $531.25 $2,181.94 $425.00 $11.55 $1,550.00 \\Hub2\cre\PROJECTS\CARMEL\PennSt%PaYestimate-wb3 CITY OF CARMEL 4 of 4 PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT #97-04 PROGRESS PAY ESTIMATE NO. 01 For work done during the period of: through TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE $148,787.49 TOTAL PAY TO DATE $148,787.49 DEDUCT 10% RETAINAGE $14,878.75 DEDUCT PREVIOUS NET PAY ESTIMATES NET PAY ESTIMATE NO. 01 $133,908.74 CrossRoad Engineers, PC Inspecting Firm Contractor \\Hub2\cre\PROJECTS\CARMEL\PennSt~PaYestimate.wb3