Loading...
HomeMy WebLinkAboutCC-08-02-99-01 Hazel Dell PaymtResolution No. CC-08-02-99-01 A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL, INDIANA APPROVING PAYMENT OF CONSTRUCTION COSTS FOR HAZEL DELL PARKWAY WHEREAS, pursuant to Article III, Section 3.01 (b) of the Trust Indenture by and among the City of Carmel Redevelopment Authority and Fifth Third Bank of Central Indiana, dated as of August 1, 1997, approval by the Common Council is required prior to payments from the Construction Fund therein described upon presentation of architect' s or engineer's certificates of work completed and materials furnished; WHEREAS, American Consulting Engineers, Inc., has presented such certificates regarding the Construction Project Invoices attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Carmel, Indiana, that the Construction Project Invoices attached hereto as Exhibit A are hereby approved for payment from the Construction Fund described in the above- referenced Trust Indenture. PASSED by the Common Council of the City of Carmel, Indiana this of ,1999, by a vote of ayes and nays. day John R. Koven .5 ATTEST: ~ Diana L. ~C~,'Clerk-Treasu Presented by to thity of Carmel, Indiana the ~ tt'~a' of ,/}~ ,1999. Y Diana L. Cordray, , -I?C~,C J ~ainard, Mayor ' ATTEST: Diana ~I)~C~surer EXHIBIT A PAYMENT REQUISITION NO. 54 PAYEE AMOUNT DUE CHARACTER OF EXPENDITURE Milestone Contractors P.O. Box 66008 5950 S. Belmont Ave. Indianapolis, IN 46266-6008 $236,130.29 Construction costs in connection with Hazel Dell Parkway. 08/02/99 CONSTRUCTION PROJECT INVOICE Date: 7/2~99 Nams o/Company: Addr~.ss & Zip: Telephone No.: Ft.; N O,; Niileston~ ContraQtors LP Milestone Contmeton LP P.O. BOx' 66008 5950 S. Belmont Ave. Indianapolis, IN 46266-6008 (3 ~ 7) - 788- ~ 040 (317)- 788- ~ 098 Project Namc: Hazel Dell Parkway Invoice No.: 032 Cotutmction pay items as per PR_c~RESS ESTIMATE #032 as shown on the attached invoice dated 7/21/99. Submitt~ by American Consulting Engineers, Inc. ~je~t Repre~nmtive ~ Prim Name Projoct Namo: HAZF. I. DELL PAKKWAY Proj,~ct No.: 97-02 l'nvotc~ No.: 032 l~nad: 7/1/99 Thin 7/15/99 ROAD ...................................................................... STRUCTURE NO. 1 (Blue Woods Crr, k B~dSc) ................................. STRUCTURE NO. 2 (Cool Cte~ Bridge) ........................................ STRUCTURE NO. 3 (Mitdamex Ditch) ......................................... 236,1307-9 0.00 0.00 0.00 BrI,I,INO THIS ESTIR4.TE LESS RETAINAGE PROGRESS ESTIMATE DUE THIS ESTI3.tATE 236,130.29 0.00 236,130.29 DATE: 7/21/99 CONTRACT: -97525 ESTIMATE: 032 PROJECT: ROAD PERIOD: 7/01/99 PO NO.: LETTING: 8/06/97 THRU 7/15/99 CITY OF CAREEL PROGRESS ESTIMATE CONTRACTOR MILESTONE CONTRACTORS, L.P. Page 1 DAN GREEKAMP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RO. INDPLS., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION 0002 EXCAVATION, COMMON 105.3500 CYS 3.25000 342.39 0~16 BITUMINOUS BASE 5, MV 2,6~9.950~ TON 20.35~00 54,129.98 0019 8iTUMINOUS BASE, 5D, MV 2,598.[400 TON 2~.~4~00 52,~66.73 0e21 BITUMINOUS SURFACE [1, MV 1,189.53ee TON 31.24eoe 37,160.92 ~023 8ITUMINOUS MATERIAL FOR TACK COAT 1.0200 TON 142.eseee 144 89 0026 CURB RAMP, CONCRETE 53.2eoe sYs- 18.58000 988 46 0027 SIDEWALK, CONCRETE, 4 IN. 46 sgee sYs 20.0ee00 937 80 0031 BITUMINOUS MIX. FOR APPROACHES, MV 6e 54e0 TON 34.zseeo 2,973 5e 0034 GEOTEXTILE8 i3 33~0 SYS 2.09~ 27 86 ~039 SODDING 5,76e ~090 SYS z.43ege i3,996 89 ~941 RETAINING WALL, MODULAR BLOCK [,~58 see9 EFT z4.zgee9 25,719 97 0044 PIPE, REINFORCED CONCRETE, i8 IN. 3 0e00 LFT 22.60000 67 80 0e55 PIPE, REINFORCED CONCRETE, 12 IN. 9 0000 LFT 19.74000 177 66 0062 PIPE END SECTION, 18 IN. i 9~00 EACH 254.75000 204 75 00S0 CATCH BASIN, E7 [ 0009 EACH 892.2900~ 692 29 0993 TEMPORARY PAVEMENT MARKING, 2,160 ~0 LFT 1.~3~0 2,224 89 I, YELLOW, 4 IN. 9994 TEMPORARY PAVEMETN MARKING, 2,216.~00 LFT l.e3~eo 2,282.48 !,'WHITE, 4 IN. ~127 CABLE DUCT MARKER I~.090e EACH 86.48~09 1,21~.72 0219 BITUMINOUS BASE 8C, MV [,[59.7590 TON 24.38~}ee 28,274.71 0220 COMPACTED AGGREGATE FOR BASE [3i.0500 TON 8.81~09 i,154.55 SIZE NO. 53 0232 SIGNAL CABLE, 7C 14GA -189.~009 LFT 3.93e09 (572.67) ezse ~2" SAWCUTTING 66.670~ LFT i.58~e i~5.34 DATE: 7/21/99 CITY OF CAREEL Page 2 CONTRACT: -97525 PROGRESS ESTIMATE ESTIMATE: e32 DAN GRESKAMP PROJECT: ROAD AMERICAN CONSULTING ENGINEERS, INC. PERIOD: 7/~1/99 TMU 7/15/99 CONTRACTOR 4165 MILLERSVILLE RD. PO NO.: MILESTONE CONTRACTORS, L.P. INDPLS., IN LETTING: 8/~6/97 ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION ............................................................................................................. / ~261 BITUMINOUS SURFACE 11, LV 323.2~ TON 34.7~ 11,215.~4 N e293 7 FOOT PEDESTAL 4.eeee ~.ACH 377.88eee 1,511.52 236,13e.29 DATE: 7/21/99 CITY OF CAREEL CONTRACT: -97525 PROGRESS ESTIMATE ESTIMATE: ~32 PROJECT: ROAD PERIOD: 7/~1/99 THRU 7/15/99 CONTRACTOR PO NO.: MILESTONE CONTRACTORS, L.P. LETTING: 8/~6/97 Page 3 DAN GREEKAMP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RD. INDPL8., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION LiQUiDATED DAMAGES OTHER DEDUCTIONS PURSUANT TO T ~ PROV ION AND PENALTIES OF iC [971 ~-11-i~ I HEREBY CERtiFY ~HAT THE FOREGOING ACCOUNT IS JUST AND CORRECT, THAT THE AMOU~ I GALLY DUE, AFTER ALLOWING ALL JUST CREDITS AND THAT NO PART OF THE SAME HAS BEEN PAID. CONTRACTOR ~ DATE PER PLANS, SPECIFICATIONS, AND/OR SPECIAL PROVISIONS, THE FOLLOWING CONDITIONS APPLY ON THIS ESTIMATE. ERECTION OF BARRICADES YES NO , ERECTION OF DETOUR SIGNS YES NO , CURING OF CONCRETE YES NO , MAINTENANCE OF TEMPORARY RUNAROUNDS YES NO , PREPARATION OF PAYROLLS YES NO , BASED ON FOREGOING CONDITIONS THIS ESTIMATE (SHOULD)(SHOULD NOT) BE DELAYED. ' PROJECT ENGINEER ' DATE DISTRICT DATE OPERATIONS SUPPORT DATE