Loading...
HomeMy WebLinkAboutCC-03-15-99-01 Hazel Dell PaymtResolution No. CC-03 - 15-99-01 A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL, INDIANA APPROVING PAYMENT OF CONSTRUCTION COSTS FOR HAZEL DELL PARKWAY WHEREAS, pursuant to Article III, Section 3.01 (b) of the Trust Indenture by and among the City of Carmel Redevelopment Authority and Fifth Third Bank of Central Indiana, dated as of August 1, 1997, approval by the Common Council is required prior to payments from the Construction Fund therein described upon presentation of architect' s or engineer's certificates of work completed and materials furnished; WHEREAS, American Consulting Engineers, Inc., has presented such certificates regarding the Construction Project Invoices attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Carmel, Indiana, that the Construction Project Invoices attached hereto as Exhibit A are hereby approved for payment from the Construction Fund described in the above- referenced Trust Indenture. PASSED by the Common Council of the City of Carmel, Indiana this of ~f~eff-- ,1999, by a vote of & ayes and D nays. day · ,. COUNC7 THE CITY OF C .L,~~~A P~siding O'tticer , ~d E. Carter Ja, uy Mill ! Billy L. Walker ATTEST: Diana L. Cordray, IAMC, Clerk-Tre S~er Presented by me to the Mayor of the City of Carmel, Indiana the/if/4 y(//~v~/C ,19 9 9. day of Diana L. Cordray, IAMC, Cle-~Treasurer 'Y Approved by me, Mayor of the City of Carmel, Indiana, this /7fl--~'cl~ay of Pl~ ~([7t ,1999. nard, Mayor ATTEST: Diana L. Cordray, IAMC, Cler'~-~Treasurer L~7 EXHIBIT A PAYMENT REQUISITION NO. 41 PAYEE AMOUNT DUE CHARACTER OF EXPENDITURE Milestone Contractors LP P.O. Box 421450 5950 S. Belmont Ave. Indianapolis, IN 46242-1459 Sundown Gardens 13400 Old Meridian St. Carmel, IN 46032 $8,100.97 $62,167.50 Construction costs in connection with Hazel Dell Parkway. Landscaping costs in connection with Hazel Dell Parkway. 03/O 1/99 CONSTRUCTION PROJECT INVOICE Data: 2/1 7199 Namo o/Company: Address & Zip: Tab~phona No.: Fax No.: Milestone Contractors LP Milesme Contractors LP P.O. Box 421450 5950 S. Belmont. Ave. Indianapolis, IN 46242-1459 (3 ~ 7)- 7ss- ~ 040 (3 ~7)- 7ss- ~ogs Project Name: Hazel Dell Parkway Invoice No.: 023 Consm, ction pay items as per PROGRESS ESTIMATE #023 as shown on the attache~ invoice dated 2/17/99. Submined by American Consulting Engineers, Inc. R e i~ec t R ef'~ ,~e~ Print Name ProjectName: I--IAT.'I:;'.T, DRT J. PARKWAY Proj~ctNo.: 97-02 [nvoics No.; 023 Psriod: 12/16/98 Thru 2/15/99 ROAD ................................................................. $ STRUCTURE NO. 1 STRUCTURE NO. 2 STRUCTURE NO. 3 (Blue Woods Creek Bridge) ............................ (Cool Cre~k RridJe) ................................... (Mit~-h~ Ditch) .................................... BIIZIN. G THIS ESTIMATE $ LESS RETAINAGE PROGRESS ESTIMATE DUE THIS ESTIMATE $ 9,001.08 0.00 0.00 0.00 9,001.08 900.11 8.100,97 DATE: 2117/99 CITY OF CARMEL CONTRACT: -97525 PROGRESS ESTIMATE ESTIMATE: ~23 PROJECT: ROAD PERIOD: 12/16/98 THRU 2/15/99 CONTRACTOR PO NO.: MILESTONE CONTRACTORS, L.P. LETTING: B/e6/97 Page 1 DAN GREEKAMP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RD. INDPLS., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION ~ee8 T.E.S.C., DROP INLET PROTECTION 6.eee~ EACH 67.~9~ee 4e2 54 ~1~ B BORROW -86.96~ CYS 16.~ (1,39i 36) ~32 CEMENT CONC. PAVE. FOR DRIVE., 6IN. 32.~ SYS 24.87~ 795 84 ~46 PIPE, REINFORCED CONCRETE, 3~ IN. 2.3~ LFT 33.15~ 76 24 ~55 PIPE, REINFORCED CONCRETE, 12 IN. -159.6~ LFT 19.74~ (3,15~ 5~) ~58 CONCRETE, A, STRUCTURES 1.5~ CY8 399.58~ 599 37 ~6~ PIPE END SECTION, 12 IN. 6.e~e~ EACH 167.26~0~ 1,~3 56 ~67 PIPE, REINFORCED CONCRETE, 15 IN. 15~.4~ LFT 19.83~ 2,982 43 ~71 CASTING, ADJUST TO GRADE -2.see~ EACH 241.13~ (675 i6) ~72 MANHOLE, ADJUST TO GRADE .e3ee LFT 264.56~ 7 94 ee75 INLET, Jl~ -2.~0 EACH 85~.89~ (1,7~i 78) ~8~ CATCH BASIN, E7 -i.~ EACH 692.29~ (692.29) ~81 CATCH BASIN, Ki~ 2.e~ EACH 945.2~e 1,89e.4~ ~82 MANHOLE, C4 ~.~ EACH i,~79.15~ ~.~ ~85 MANHOLE, K4 -l.~ EACH 2,686.63~ [2,686.63) 0~88 ROAD CLOSURE SIGN ASSEMBLY -9.~e EACH 928.95~ (8,36~.55) ............................................................ T .................................................................. ~12~ SIGNAL STRAIN POLE, STEEL, 36 FT. 4.eee~ EACH 2,852.26~ 11,4~9.~4 ~136 TRANSVERSE MARKINGS, THERMOPLASTIC, -1.5~ LFT 3.1~ (4.65) STOP LINE, 24 IN. ~142 FIELD OFFICE, 55~ SQ FT. 3.~ MOS 1,448.1~ 4,344.3~ ~224 WASTE EXCESS COMMON EXCAVATIdN 52~.0~ CYS 6.25~ 3,25~.~ N ~291 SIGNAL SERVICE l.~ EACH 343.44~ 343.44 N ~295 I2 IN. CMP 3~.eeee LFT 18.63~ 558.9~ DATE: 2/17/99 CITY OF CAREEL CONTRACT: -97525 PROGRESS ESTIMATE ESTIMATE: ~23 PROJECT: ROAD PERIOD: 12/16/98 THRU 2/15/99 CONTRACTOR PO NO.: MILESTONE CONTRACTORS, L.P. LETTING: 8/~6/97 Page 2 DAN GRESKAMP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RD. INDPLS., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION LIQUIDATED DAMAGES OTHER DEDUCTIONS PURSUANT TO THE PROVISION AND PENALTIES OF IC 1971 5-11-1~ I HEREBY CERTIFY THAT THE FOREGOING ACCOUNT IS JUST AND CORRECT, THAT THE AMOUNT CLAIMED IS LEGALLY DUE, AFTER ALLOWING ALL JUST CREDITS, AND THAT NO PART OF THE SAME HAS BEEN PAID. CONTRACTOR DATE PER PLANS, SPECIFICATIONS, AND/OR SPECIAL PROVISIONS, THE FOLLOWING CONDITIONS APPLY ON THIS ESTIMATE. ERECTION OF BARRICADES YES NO , ERECTION OF DETOUR SIGNS YES NO , CURING OF CONCRETE YES NO , MAINTENANCE OF TEMPORARY RUNAROUNDS YES NO , PREPARATION OF PAYROLLS YES NO , BASED ON FOREGOING CONDITIONS THIS ESTIMATE (SHOULD)(SHOULD NOT) BE DELAYED. PROJECT ENGINEER DATE DISTRICT DATE OPERATIONS SUPPORT DATE CONSTRUCTION PROJECT INVOICE Nams of Company: Address & Zip: Sundown Crardens Sundown Gardens, Inc. 13400 Old Merdian St. C,~rmel, IN 46032 T. fl,~phontz No.: (317) - 846-0620 Project Nn,ne: Hazel Dell Parkway Landscaping Invoice No.: 009 Construction pay items as per PROc~RES8 ESTIMATE #009 as shown on the attached invoice dated 12/19/99. SubnfitteA by American Consulting Engineers, Inc. Resident Project Representative Print Narnc ProjectName: HAT;g'.T. DRI .l . PARKWAY LANDSCAPING Proj~ct No.: 97-08 [nvoice N~; 009 12/16/98 Thru 2/15/99 LANDSCAPE .............................................................. $ 69,075.00 BILLING THIS ESTIMATE LE.~8 RETAINAOE PROORESS ESTIMATE DUE THIS ESTIMATE 69,075.00 6,907.50 62,167.50 DATE: 2/19/99 CITY OF CARMEL CONTRACT: -97526 PROGRESS ESTIMATE ESTIMATE: PROJECT: LANOSCAPE PERIO0: 12/16/98 THRU 2/15/99 CONTRACTOR PO NO.: SUNOONN GARDENS LETTING: 12/17/97 Page 1 DAN GRESKAMP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RD. INOPIS., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION eoel PINUS NIGRA 4.eeee EACH 148.28888 593.12 eee2 PICEA ABIES 7.eeee EACH 158.978ee 1,856.79 eee6 TAXODIUM DISTICHUM 1.eeee EACH 385,83888 385.83 eee7 FRAXINUS AMERICANA 12.eeoc EACH 346.2188e 4,154.52 'MARSHALLS SEEDLESS' eee8 FRAXINUS PENNSYLVANICA 'URBANITE' 2e.eeee EACH 346.21888 6,924.28 eee9 FRAXINUS AMERICANA 12.eeee EACH 363.18888 4,358.16 'AUTUMN APPLAUSE' eele GYMNOCLAOUS OIOICUS 12.~ee~ EACH 42z.86888 5,134 32 e811 ACER SACCHARUN 'GREEN MOUNTAIN' 2.eeoc EACH 374.51e88 749 82 e~13 ACER RUBRUM 'FRANKSRED' 4" CAL. 4.e88e EACH 782.75eee 2,811 8J e~17 LIQUIDAMBAR STYRACIFLUA 17.ee88 EACH 383.18888 6,512 78 e819 ACER CAMPSTRE 2.eeee EACH 261.32888 522 64 e821 CRATAEGUS PHAEMOPYRUM 36.88ee EACH 249.99eee 8,999 64 e823 AMELANCHIER X GRANDI. 17.eeoc EACH 386.59888 5,212 83 'AUTUMN BRILLIANCE'-- 8824 MALUS 'PRAIRIFIRE' 23.8888 EACH 289.61888 6,661.83 N 8848 AODENDUM NO.2 INCENTIVE .15.eeee EACH 1,eee.eeeee 15,eee.ee , ge e DATE: 2/19/99 CITY OF CARMEL CONTRACT: -97526 PROGRESS ESTIMATE ESTIMATE: ee9 PROJECT: LANOSCAPE PERIO0: 12/16/98 THRU 2/15/99 CONTRACTOR PO NO.: SUNDOWN GARDENS LETTING: 12/17/97 Page 2 DAN GRESKAMP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RO. INDPLS,, IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION 69,075.00 LIQUIOATEO DAMAGES OTHER DEDUCTIONS PURSUANT TO THE PROVISION AND PENALTIES OF IC 1971 5-11-1e I HEREBY CERTIFY THAT THE FOREGOING ACCOUNT IS JUST AND CORRECT, THAT THE AMOUNT CLAIMED IS LEGALLY DUE, AFTER ALLOWING ALL JUST CREDITS, AND THAT NO PART OF THE SAME HAS BEEN PAID. CONTRACTOR DATE PER PLANS, SPECIFICATIONS, AND/OR SPECIAL PROVISIONS, THE FOLLOWING CONOITIONS APPLY ON THIS ESTIMATE. ERECTION OF BARRICAOES YES NO , ERECTION OF OETOUR SIGNS YES NO , CURING OF CONCRETE YES NO , MAINTENANCE OF TEMPORARY RUNAROUNOS YES NO , PREPARATION OF PAYROLLS YES NO , BASED ON FOREGOING CONOITIONS THIS ESTIMATE (SHOULO) (SHOULO NOT) BE OELAYED. PROJECT ENGINEER DATE DISTRICT DATE OPERATIONS SUPPORT DATE